Rio Tinto reaches agreement on trans-Guinean infrastructure for Simandou iron ore project

Rio Tinto plc

Rio Tinto plc (LON:RIO) and the Simfer[1] joint venture have reacheded an important milestone today by concluding key agreements with the Republic of Guinea and Winning Consortium Simandou[2] (WCS) on the trans-Guinean infrastructure for the world class Simandou iron ore project.

The Co-Development Convention with the Republic of Guinea and associated agreements adjusting Simfer and WCS’s existing mine conventions create the legal framework for the co-development of more than 600 kilometres of new multi-use rail together with port facilities, that will be used to export iron ore from the Simandou mining concessions in the southeast of the country.

Rio Tinto Executive Committee lead for Guinea and Copper Chief Executive Bold Baatar said “With these agreements we have reached an important milestone towards full sanction of the Simandou project, bringing together the complementary strengths and expertise of Rio Tinto and our partners, the Government of Guinea and Winning Consortium Simandou, for the infrastructure that will unlock this world class resource. Simandou, the world’s largest known undeveloped supply of high-grade, low-impurity iron ore, will strengthen Rio Tinto’s portfolio by complementing our existing Pilbara and Iron Ore Company of Canada products.”

The infrastructure capacity and associated cost will be shared equally between Simfer, which is developing blocks 3 and 4 of the Simandou project, and WCS, which is developing blocks 1 and 2. China Baowu Steel Group has also previously entered into a term sheet agreement with WCS that may see it partner in the WCS scope for blocks 1 and 2 of the Simandou mining concession and the infrastructure joint venture.

The Co-Development Convention requires ratification by the Guinean State. It is also subject to a number of conditions, including the Guinean State’s approval of the final feasibility study for the project. Negotiations continue between the partners to finalise the investment agreements and related shareholders’ agreements which underpin the co-development. A further announcement will be made when appropriate concerning these agreements.

Critical path works continue to be progressed by the partners to ensure progress is maximised during the 2023-24 dry season.

[1] The Simfer joint venture comprises Simfer S.A., the holder of Simandou South Blocks 3 & 4, which is owned by the Government of Guinea (15%) and Simfer Jersey Limited (85%). In turn, Simfer Jersey Limited is a joint venture between the Rio Tinto Group (53%) and Chalco Iron Ore Holdings (47%) – a Chinalco-led joint venture of leading Chinese SOEs (Chinalco (75%), Baowu (20%), China Rail Construction Corporation (2.5%) and China Harbour Engineering Company (2.5%).

[2] WCS is a consortium between Winning International Group (49.99%), Weiqiao Aluminium (part of the China Hongqiao Group) (49.99%) and United Mining Suppliers (0.0002%).

Share on:

Latest Company News

Rio Tinto announces Board changes and appointments

Rio Tinto has announced several Board changes effective 23 October 2025, marking the end of its transitional phase.

Rio Tinto Plc Q3 2025 production update, guidance on track

Rio Tinto reported strong third quarter output, with back-to-back records in bauxite and Oyu Tolgoi and Pilbara shipments up 6% quarter on quarter. Full year guidance remains unchanged, with bauxite raised to 59–61 Mt, copper on track for the higher end supported by the Oyu Tolgoi ramp-up, and first ore from Simandou loaded for rail in October

Rio Tinto and partners approve $733m West Angelas iron ore project

Rio Tinto, Mitsui and Nippon Steel will invest $733 million to develop new deposits at the West Angelas hub in Western Australia, securing approvals to sustain 35Mtpa output.

Simon Trott appointed Chief Executive of Rio Tinto Plc

Rio Tinto has named Iron Ore Chief Executive Simon Trott as its new Group CEO, effective 25 August 2025, succeeding Jakob Stausholm.

Rio Tinto and Hancock Prospecting Commit $1.61 Billion to Develop Hope Downs 2 Iron Ore Project

The two new above-water-table iron ore pits will have a combined total annual production capacity of 31 million tonnes and will sustain production from the Hope Downs Joint Venture into the future.

Rio Tinto Plc CEO Jakob Stausholm to step down

Rio Tinto Plc announces the upcoming departure of CEO Jakob Stausholm, who has led the company through strategic transformation and growth since 2021.

    Search

    Search