Valeura Energy boosts output with successful Manora drilling campaign

Valeura Energy

Valeura Energy Inc (TSX:VLE, OTCQX:VLERF) has announced the successful completion of an infill drilling campaign at the Manora field in Licence G1/48 (70% operated working interest), offshore Gulf of Thailand.

Dr. Sean Guest, President and CEO commented:

“Our most recent drilling at Manora has both increased oil production rates and successfully appraised additional targets which will form the basis of future infill development drilling.  While the Manora field accounts for only about 10% of our year-to-date production, it is an excellent example of the potential for Gulf of Thailand fields to add many years of economic field life through targeted ongoing activity.  In 2025 we intend to pursue a full year of drilling operations across our portfolio, aimed at continuing our proven track record of adding reserves year on year to support continued cash flow generation.” 

Valeura Energy drilled a five well programme, comprised of three production-oriented infill development wells and two appraisal wells.  In aggregate, the Company’s Manora field working interest share oil production before royalties has increased from 2,144 bbls/d (December 2024 average) to 2,866 bbls/d for the last 14-day period.  Additionally, the appraisal objectives of the campaign have yielded between three and five potential future drilling targets, which will be further evaluated for inclusion in a future drilling programme.

The A34 well was drilled for infill development targets within the deep 600-series sands in the field’s eastern fault block.  The well was successful and has been completed as a multi-zone comingled producer.

The horizontal A38 well was also drilled into the eastern fault block, with the objective of developing the shallower 300-series sands.  It was completed as a producer, with the well design incorporating an innovative downhole autonomous inflow control device (“ICD”) to manage water vs oil production.  The Company is monitoring the impact of this, and other ICDs deployed elsewhere on its fields, to optimise the application of this technology across the portfolio.

The A36 well targeted sands across several known producing intervals in the field’s main fault block and has been completed as a multi-zone infill development well.  As is normal in many multi-zone wells, only the deepest targets are currently producing and the shallower zones will be brought on production later.

The A35 well successfully appraised several zones of interest within the shallower 300-series sands.  While this appraisal well will not be used a producer (and accordingly has been plugged and abandoned), the results encountered have indicated the potential for three further development wells within this reservoir section, which will now be further studied and modelled for inclusion in future development drilling.

The horizontal A37 well was drilled as a combination appraisal and development well.  The well encountered an encouraging appraisal target in the 500-series sands, which is now being matured for inclusion in a future drilling campaign.  The well’s development target, within the deeper 600-series sands was completed as a producer.

Following completion of the Manora drilling campaign, Valeura Energy’s contracted drilling rig has mobilised to Licence B5/27 (100% operated interest) where it is currently conducting a drilling programme on the Jasmine C wellhead platform.

We’ll keep you in the loop!

Join 1,000's of investors who read our articles first

We don’t spam! Read our privacy policy for more info.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Valeura Energy sees strategic value in Energy Council London

Tim Chapman explains why direct conversations, industry relationships and global perspectives make Energy Council London worth the journey.

Valeura Energy Builds Cash Position as Bussabong Catalyst Approaches, Auctus Advisors

Valeura Energy enters the second half of 2026 with strong cash generation and Bussabong development plans advancing steadily in Thailand.

Valeura posts record Q2 revenue and free cash flow estimate

Valeura Energy said Q2 2026 production averaged 22.3 mbbls/d, with record revenue of US$259.8 million and expected free cash flow of about US$100 million.

Valeura Energy advances offshore drilling strategy at Nong Yao

Valeura Energy has completed its first multilateral well at Nong Yao, lifting production and showing how targeted offshore drilling can improve mature field performance.

Valeura advances Gulf of Thailand drilling platform with Nong Yao campaign

Valeura Energy has completed an eight-well Nong Yao campaign and is preparing to apply multi-lateral drilling at Jasmine as it builds on its Gulf of Thailand operating base.

Valeura strengthens Nong Yao position with completed drilling campaign

Valeura’s completed Nong Yao drilling campaign has lifted production, added new reservoir information and introduced multi-lateral drilling to support future offshore development.

Search