Thor Energy signs deal to recover uranium from Colorado waste

Thor Energy

Thor Energy plc (LON:THR, ASX: THR, OTCQB: THORF) has announced the signing of a binding agreement with DISA Technologies, Inc. to seek to evaluate and if successful, treat historically abandoned uranium mine waste dumps and being able to recover saleable uranium and other critical minerals concentrates at Thor’s Colorado uranium claims. This follows on from the announcement of the signing of a binding term sheet with DISA[1].

Furthermore, DISA has now received its final U.S. Nuclear Regulatory Commission Service Providers License to remediate abandoned uranium mine waste. This paves the way for a deployment of DISA’s patented technology on the Colorado Projects in the future.

Thor holds 25% ownership rights to uranium minerals on U.S. Bureau of Land Management via its US subsidiary Standard Minerals Inc. that holds the projects in Colorado in the United States, along with the 75% holder, London-listed Metals One PLC (AIM: Met1).

Highlights:

·    Full binding agreement signed whereby Standard is to be paid a gross revenue share of any saleable uranium and other critical mineral concentrates recovered from waste at its Colorado Projects via deployment of DISA’s modular mobile plants utilising the patented High-Pressure Slurry Ablation system.

·    DISA has now received its final U.S. NRC Service Providers License to remediate abandoned uranium mine waste.

·    No capital expenditure or operating expenditure is payable by Standard or Thor under the Agreement.

·    Thirteen separate prospective waste dumps have been ground surveyed at Standard’s Colorado Projects; others may be added to this inventory over time.

·    Standard to receive a percentage of gross product sale revenue stream, minus certain post-treatment allowable costs. A sliding scale with a base rate of 2.5%, through to 4.0% in certain metals pricing environments.

·    DISA will be the operator of the Colorado Projects and will pay all associated costs of economic evaluation, permitting, treatment and ongoing remediation.

Andrew Hume, Thor Energy Managing Director and CEO, commented:

“We are pleased to announce the execution of the full binding agreement with DISA, following on from our previously announced binding term sheet. This agreement finalises the details under which Thor will potentially generate revenue from the recovery of uranium and critical metals from its Colorado Projects. It is also fantastic to report that the U.S. Nuclear Regulatory Commission has granted DISA a Service Provider’s License to remediate abandoned uranium mine waste. DISA is now the first Company in the U.S to receive such approvals. We look forward to reporting to shareholders the commencement of on-the-ground activities as the parties move towards a uranium and critical metals production scenario.”

Advantages of HPSA:

·    The HPSA process treats surface dumps of previously partially mined and aggregated material.

·    DISA has been working with the U.S. NRC since 2021 on a robust licensing process, which has now concluded, making DISA the first company to receive an SPL to remediate abandoned uranium mine waste.

·    Aside from extracting valuable uranium and critical minerals, the process delivers significant improvements to the local environment and watersheds by removing, on average, 90% of the uranium and radium-226 content from the waste, as evidenced by a treatability study DISA completed with the U.S. Environmental Protection Agency[2].

·    Strong US Government support for domestic recovery of uranium and critical minerals from legacy mine waste. This activity is directly in line with the recent Secretarial Order from the Department of the Interior (Order No. 3436: Unlocking Critical and Strategic Minerals from Mine Waste, Cutting Red Tape, and Restoring American Dominance in Strategic Mineral Production).

Next Steps:

·    Characterisation program with a combination of assay and gamma probe to determine likely quantities of uranium and other recoverable minerals present in the waste dumps, and economic evaluation.

·    Application and completion of all requisite local permits needed to commence treatment of waste and recovery of payable concentrates using HPSA technology.

·    Future potential sale of metals concentrates and payment of gross revenue to Thor Energy via Standard. Potential revenue cannot yet be quantified until assay and gamma probe programs are performed.

[1] Refer to THR Announcement dated 4 September 2025.

[2] https://www.disausa.com/_files/ugd/01023f_fa40141ed3d8492fbffbb41f785e788f.pdf

We’ll keep you in the loop!

Join 1,000's of investors who read our articles first

We don’t spam! Read our privacy policy for more info.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Thor Energy schedules AGM for 11 November 2025

Thor Energy has announced that its Annual General Meeting will be held on 11 November 2025 at 10 a.m. GMT at 9 Pollen Street, London, W1S 1NG.

Thor Energy highlights strategic pivot to hydrogen and helium in 2025 Annual Results

Thor Energy has reported audited results for the year ended 30 June 2025, marking a major strategic shift to natural hydrogen and helium exploration in South Australia.

Thor Energy advances hydrogen and helium strategy in 2025 Annual Results

Thor Energy has published its audited results for the year ended 30 June 2025, highlighting a transformative year that saw the acquisition of an 80.2% stake in Go Exploration Pty

Thor Energy signs term sheet to sell Molyhil Project stake for A$8.75m

Thor Energy has signed a term sheet with Tivan Limited to sell its 75% interest in the FRAM Joint Venture, which holds the Molyhil Tungsten, Molybdenum and Copper Project in

Thor Energy signs term sheet with DISA to recover uranium from Colorado mine waste

Using DISA’s patented High-Pressure Slurry Ablation system, the partnership aims to recover saleable uranium and critical minerals without capital or operating costs to Thor, while also improving environmental conditions at

Thor Energy PLC Completes Sale of 75% interest in US Uranium Claims in Colorado and Utah

Thor Energy to be issued 14,224,751 shares in Metals One PLC at a deemed 15 Day VWAP of 7.03 pence per share

Search

Search