Sintana Energy completes US$2.5 million entry into Angola’s KON-16 block with 2027 drilling targeted

SEI

Sintana Energy Inc. has completed the acquisition of an indirect interest in Block KON-16 in Angola’s onshore Kwanza Basin, moving into the asset ahead of a planned 2027 drilling campaign.

The transaction follows definitive agreements first announced on 10 September 2026. On completion, Sintana holds an indirect 5% participating interest in KON-16.

Alongside that stake, Sintana will receive a net profit interest of 2.5% of Corcel’s net proceeds from Block KON-16 after first oil until aggregate payments of US$50 million have been made. After that point, the net profit interest reduces to 1.5%.

The aggregate consideration for the acquisition was US$2.5 million. This comprised a US$500,000 initial payment, which had already been paid to Corcel in May 2025, and a US$2.0 million cash balance paid at completion.

What the work programme looks like

Corcel completed a 326 line-km 2D seismic programme over KON-16 in 2026, which it said confirmed the block’s significant prospectivity. Its operational plan is to initiate exploration activities, including drilling an exploration well focused on an inventory of pre- and post-salt prospects.

Timing and specific activities will depend on the outcome of ongoing technical review, approvals, financing, rig availability and other key considerations. Corcel is targeting the start of exploration drilling at KON-16 in 2027, subject to final technical selection and the other factors listed.

The seismic work completed in February 2026 represented a 227% increase in seismic coverage within the block compared with the 143 line-km of legacy 2010 data. The final pre-stack time migrated seismic volume has now been delivered and is being used for prospect maturation and well-location selection.

That dataset has also been integrated with the enhanced full tensor gradiometry survey, described as the first deployment of eFTG in Angola. Corcel has also completed its geomechanical programme and appointed NRG Well Management for detailed drilling engineering and well design.

Block KON-16 and the Kwanza Basin

KON-16 is an onshore block of about 1,000 sq km in Angola’s Kwanza Basin and was awarded in 2023 with an initial 5+2-year exploration phase.

The Kwanza Basin covers about 25,000 sq km onshore and saw its first discovery in 1955, with peak drilling activity in the 1960s and 1970s. More than 90 MMbbl have been produced from ten fields, mostly targeting the post-salt.

Two plays are being targeted at KON-16. The post-salt play comprises salt-induced anticlinal structures with fractured Binga carbonate reservoirs. This play has been proven in the nearby Tobias and Galinda fields, which produced c.30°API crude in the 1950s to 1970s, and multiple post-salt leads have been identified.

The pre-salt play is described as the primary high-impact target, in the Cuvo Formation clastics and carbonates. A 1960 well, Tuenza-01, confirmed oil shows in the Cuvo Formation within KON-16, despite being drilled outside a recognised structural closure, and the new seismic has identified multiple closures on trend.

Robert Bose, chief executive officer of Sintana Energy, said: “Completing our entry into Angola through KON-16 is an important step in building a balanced portfolio of high-impact, frontier exploration assets alongside our positions in Namibia and Uruguay.” He added that the block is under-explored and has a new 326 line-km 2D seismic dataset and a clear work programme leading towards drilling.

He said Sintana had secured “an attractive entry point together with a net profit interest that gives us further upside on success” and looked forward to working with Corcel as the block moves towards the 2027 drilling campaign.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Sintana Energy completes US$2.5 million entry into Angola’s KON-16 block with 2027 drilling targeted

Sintana Energy has completed its acquisition of a 5% indirect stake in Angola’s KON-16 block and outlined the path...

Sintana Energy secures 5% stake in Angola oil block ahead of 2027 drilling

Sintana Energy has completed its US$2.5 million acquisition of a 5% interest in Angola's KON-16 oil block, securing additional...

Sintana Energy sets out multi-well drilling programme across Namibia and Uruguay

Sintana Energy is preparing for a multi-year programme of exploration and appraisal activity, with the Mopane development in Namibia,...

Sintana Energy retains PEL 82 exposure as QatarEnergy joins Namibia project

Sintana Energy will retain its indirect 4.9% interest in Namibia’s PEL 82 as QatarEnergy agrees to acquire a 25%...

Sintana Energy starts Namibia Securities Exchange trading as local investors gain access to shares

Sintana Energy has completed the steps for a Namibia Securities Exchange listing, opening trading on 16 November without issuing...

Sintana Energy begins trading on Namibia Securities Exchange

Sintana Energy has completed the requirements for a listing on the Namibia Securities Exchange, with trading commencing on 16...

Search