Touchstone Exploration begin operations at Royston-1X

Touchstone Exploration

Touchstone Exploration Inc. (TSX, LON:TXP) has reported that it has commenced operations at the Royston-1X sidetrack well located on the onshore Ortoire block in the Republic of Trinidad and Tobago. Touchstone has an 80 percent operating working interest in the well, with Heritage Petroleum Company Limited holding the remaining 20 percent working interest.

Touchstone has completed the mobilization of Star Valley Drilling Rig #25 to the Royston surface location, and the drilling rig has passed all required pre-drilling inspections. Royston-1X is a sidetrack well reentering the previously drilled Royston-1 well and is expected to be drilled to a measured depth of 11,300 feet, targeting hydrocarbon accumulations in the Middle Miocene Herrera overthrust, intermediate, and subthrust sheets.

The Royston-1 exploration well was drilled in 2021 to a total depth of 10,700 feet and identified over 1,000 feet of Herrera section in the overthrust and intermediate sheets, encountering light, sweet crude oil in both sheets.

Touchstone is targeting to drill the Royston-1X well through the previously tested Herrera sands to penetrate new sands at the base of the intermediate sheet and into the untested subthrust sheet. The well is anticipated to be drilled and logged within 45 days, and the Company will provide further updates when drilling operations are completed.

Paul Baay, President and Chief Executive Officer, commented:

The Royston-1 well drilled in 2021 showed tremendous potential, flowing significant volumes of 33-degree API oil from both the overthrust and intermediate sheets; however, mechanical challenges prevented meaningful production from the well. The challenges encountered at Royston-1 and the lessons learnt have helped us to design a drilling plan to optimally evaluate the Herrera Formation. As we target the deeper level, our enhanced understanding of the structure will allow us to assess the full potential of the intermediate sheet, which was not fully penetrated or completed in Royston-1, as well as the subthrust sheet which is a prolific target in offsetting oil pools.

Following our recent capital raise, we are excited for 2023 as we commence our latest drilling program and continue construction of our Cascadura facility with a goal of bringing on production as soon as practicable.”

We’ll keep you in the loop!

Join 1,000's of investors who read our articles first

We don’t spam! Read our privacy policy for more info.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Touchstone Exploration Reserve Upgrade and Valuation Gap Highlighted in Latest Cavendish Research

Touchstone Exploration reserves update shows PDP growth and key catalysts, with Cavendish highlighting valuation disconnect in its latest note.

Touchstone posts 2025 reserves update highlighting Central Block integration

Touchstone Exploration Inc. announced its independent 2025 reserves evaluation, showing gross 1P reserves of 27,559 Mboe and 2P reserves of 49,558 Mboe.

Touchstone Exploration takes its investment case to Vancouver

Touchstone Exploration engaged investors in Vancouver to outline how it is positioning itself within a shifting energy investment environment.

Touchstone at 2026 World Outlook Conference

Touchstone to share 2026 energy insights at leading investor conference in Vancouver.

Natural gas prices rebound as volatility returns to energy markets

Natural gas prices rebound as traders respond to shifting weather forecasts and heightened Middle East tensions.

Trinidad and Tobago energy sector eyes Venezuela to bolster gas outlook

Cross-border gas talks with Venezuela give new shape to Trinidad and Tobago’s 2026 energy outlook.

Search

Search