Thor Energy signs term sheet to sell Molyhil Project stake for A$8.75m

THR

Thor Energy plc (LON:THR, ASX: THR, OTCQB: THORF) has announced the signing of a term sheet with ASX-listed Tivan Limited (ASX: TVN) to sell the tenements and associated mining information comprising the FRAM Joint Venture, which holds the Molyhil Tungsten/Molybdenum/Copper Project in the Northern Territory, Australia. Thor holds 75% of the FRAM JV via its subsidiary Molyhil Mining Limited with ASX-Listed Investigator Resources Limited (ASX: IVR) holding the remaining 25%.

Highlights:

·    Upon completion of the sale of the FRAM JV, total consideration of A$8,750,000 will be payable, with 75% (A$6,562,500) to Thor via its subsidiary Molyhil.

·      60% of total consideration is payable within approx.12 months from execution of this Term Sheet.

·      Three successive annual deferred completion payments, payable in cash, shares or a combination at Tivan’s election.

·      Significant, non-dilutionary boost to Thor’s cash position, which, together with the recent Metals One1/2 and DISA3 Uranium transactions, strengthens the Company’s position to advance its core HY-Range natural hydrogen and helium project in South Australia.

·    The parties will now move to meet certain conditions precedent to achieve completion in a timely manner, with an indicative target of December 2025.

 Estimated Date*THOR 75%IVR 25%
Cash Non-Refundable Exclusivity (60 days)Sep-25$             375,000$             125,000
Cash Completion PaymentDec-25$        2,250,000$             750,000
Initial Deferred Completion PaymentSep-26$        1,312,500$             437,500
Second Deferred Completion PaymentSep-27$        1,312,500$             437,500
Final Deferred Completion PaymentSep-28$        1,312,500$             437,500
$     6,562,500$     2,187,500

[1] ASX “Term Sheet to Sell 75% of Non-Core US Uranium Claims” 24 July 2025

2 ASX “Thor Completes Sale of 75% of Non-Core US Uranium Claims” 12 August 2025

 ASX “Term Sheet Signed to Process Uranium & Critical Metals” 3 September 2025

*  All Estimated Dates are the Company’s best estimates and are subject to change.

Alastair Clayton, Thor Energy Chairman, commented:

“I am delighted to announce the Term Sheet executed with Tivan today. The Molyhil Project requires, amongst other things, specific sector expertise and a significant balance sheet to unlock the potential of the Project, of which Tivan has both. Then there are the obvious synergies with Tivan’s Sandover Project to the NE of Molyhil.

“For Thor shareholders, the monetisation of Molyhil means a significant inflow of cash to the Company over the next 12 months and beyond. This means more resources to advance Hy-Range and less dilution to achieve this.

“We look forward to working with Tivan and our FRAM JV partner Investigator to achieve completion as soon as practicably possible.”

We’ll keep you in the loop!

Join 1,000's of investors who read our articles first

We don’t spam! Read our privacy policy for more info.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Thor Energy moves HY-Range towards maiden hydrogen drill targets

Thor Energy is progressing a funded 464 line-kilometre seismic programme at HY-Range after Phase 2 surveys recorded natural hydrogen concentrations of up to 3%.

Thor Energy advances HY-Range seismic plans after strong hydrogen survey results

Thor Energy reported up to 3% natural hydrogen in Phase 2 geochemistry and awarded a 464 line-kilometre 2D seismic survey contract.

Better data is reshaping helium and hydrogen exploration

Advanced gas analysis can help exploration teams reduce false positives, improve target selection and manage early-stage project risk.

Thor Energy advances HY-Range towards a key natural hydrogen test

Thor Energy is moving HY-Range towards a key seismic programme designed to refine natural hydrogen and helium targets ahead of potential drilling in 2026.

Thor Energy CEO Andrew Hume discusses HY-Range hydrogen results and seismic plans

Thor Energy CEO Andrew Hume discusses exceptional Phase-2 natural hydrogen results at HY-Range and the award of a 460km 2D seismic programme to refine future drilling targets.

Thor Energy PLC: Hydrogen Readings Jump 10x as HY-Range Moves Toward Drill Targets (video)

Thor Energy PLC CEO Andrew Hume says the company’s HY-Range project is advancing quickly after Phase 2 surface geochemistry returned natural hydrogen readings up to 10 times higher than its Phase 1 results.

Search