Balfour Beatty Plc Secures £425M Highways England work

Balfour Beatty Plc

Balfour Beatty Plc (LON:BBY), the international infrastructure group, today announced that it has secured a place on two lots – B6 in the South East worth up to £1.1billion, and B8 in the North worth up to £2 billion – on Highways England’s Delivery Integration Partnership Framework. The initial packages of work Balfour Beatty has secured through both lots are worth a total of £425 million with work commencing next year.

This regional six-year framework will see contractors work with Highways England as partners responsible for designing and constructing motorway and major A-road projects across England. Future packages of work over the six year framework will be awarded based on performance.

Balfour Beatty’s digitally-enhanced way of working was instrumental in securing both lots. In collaboration with their design partner, Atkins, Balfour Beatty will utilise BIM to improve efficiencies in delivering works and will also deploy off-site manufacturing techniques. This is a direct result of the Group’s own lean strategy to reduce onsite activity by 25% by the year 2025, driving greater project efficiency and safety and lower waste by moving away from traditional industry methods.

In keeping with its added social value approach, Balfour Beatty will draw on a local supply chain, 40% of which will comprise SMEs. At construction peak, Balfour Beatty will employ 250 people, of which 5% will be apprenticeships, maintaining the Group’s commitment to The 5% Club, and rising to 10% by 2022.

Leo Quinn, Balfour Beatty Group Chief Executive, said;

“Balfour Beatty’s deep domain knowledge and unique capability in complex road construction, acquired through many years’ of successful projects for Highways England, make us ideally positioned to support delivery of the UK’s critical national infrastructure to the highest standard.”

Share on:

Latest Company News

Balfour Beatty secures £833m contract for Net Zero Teesside Power

The firm will construct a 742 MW gas-fired plant with carbon capture and storage capable of removing up to two million tonnes of CO₂ a year.

Balfour Beatty Plc confirms solid start to 2025 trading

Balfour Beatty plc announces positive trading updates ahead of the Annual General Meeting, forecasting increased profits and notable project wins in 2025.

Balfour Beatty plc Leo Quinn to step down after 10 years as Group Chief Executive

Balfour Beatty announces leadership change as Leo Quinn steps down after a decade, with Philip Hoare set to lead the group from September 2025.

Balfour Beatty forecasts 2024 growth with increased order book and revenue expansion

Balfour Beatty plc reports promising growth in 2024, driven by UK energy and US buildings markets. Revenue and profits are set to exceed 2023 figures.

Balfour Beatty Plc awarded $746 million contract by the Texas Department of Transportation

Balfour Beatty secures a $746M contract to revamp I-35 in Austin, enhancing transport infrastructure with cutting-edge engineering and strategic expertise.

Balfour Beatty Delivers Earnings Growth and Continues to Enhance Shareholder Returns

Balfour Beatty (LON:BBY) reports robust H1 2024 performance, driven by earnings growth and strong cash generation, aligning with full-year projections.

    Search

    Search