Ilika’s pilot line shift signals a licensing model in motion

Ilika Plc

Ilika’s Goliath pilot line is now fully commissioned and producing cells. This 1.5 MWh facility will manufacture 10 Ah solid state prototypes in the near term, with 50 Ah samples to follow. Both formats are aimed at demonstrating commercial viability to prospective partners across automotive, industrial and consumer sectors.

Production of the first 10 Ah units is expected by December, offering a near-term proof point. These will be used to support customer evaluation programmes, including performance benchmarking and integration testing. If results meet expectations, the 50 Ah format will move forward, with scaling supported through Ilika’s collaboration with an established battery industrialisation centre.

Many early-stage battery firms remain locked in R&D cycles or dependent on outsourced production. Ilika’s shift into controlled pilot output signals a more advanced stage of readiness. It strengthens its position in licensing negotiations and improves visibility for OEMs assessing integration paths.

Ilika plc (LON:IKA) is a pioneer in solid state battery technology enabling solutions for applications in Industrial IoT, MedTech, Electric Vehicles and Consumer Electronics.

Share on:
Find more news, interviews, share price & company profile here for:

Latest Company News

Ilika launches PRIMED programme with JLR and Oxford University

Ilika has commenced its PRIMED programme, supported by the Advanced Propulsion Centre UK, to accelerate the commercialisation of solid-state battery technology.

Ilika publishes 2025 Annual Report, advancing Goliath and Stereax

Ilika plc has released its 2025 Annual Report, outlining progress on Stereax licensing with Cirtec and Goliath EV battery milestones, including customer-validated P1 cells and delivery of a 50Ah prototype.

Ilika plc Stereax Micro Batteries Enter Production with Customer Deliveries on the Horizon (Video)

CEO Graeme Purdy shares a pivotal update on the company’s Stereax micro batteries as they complete manufacturing qualification and move into production.

Ilika FY25 results: Stereax manufacturing shift, Goliath roadmap

Ilika reported results for the year ended 30 April 2025. The group advanced transfer of Stereax miniature solid state battery manufacturing to Cirtec in the US and validated Goliath EV

Ilika secures £1.25 million grant for Goliath A-sample production

Ilika will receive £1.25 million from the APC Demonstrate fund to produce its first Goliath A-Sample solid-state batteries in a 12-month PRIMED programme with HSSMI and UKBIC, starting 1 August

Ilika raises £0.9m in upsized retail offer

Ilika plc announces the conclusion of its oversubscribed Retail Offer, raising £0.9 million and increasing gross proceeds to approximately £4.2 million.

Search

Search