# Valeura Energy enters Gulf of Thailand farm‑in with PTTEP

- Link: https://www.directorstalkinterviews.com/valeura-energy-enters-gulf-of-thailand-farm-in-with-pttep/4121209523
- Published: 2025-07-28T09:16:00+01:00
- Author: Amilia Stone

**[Valeura Energy Inc](https://www.directorstalkinterviews.com/company/valeura-energy-inc/vle.to).**(
[TSX:VLE](https://www.directorstalkinterviews.com/company/valeura-energy-inc/vle.to),
OTCQX:VLERF) has announced that it has entered into a Farm-in Agreement with PTT
Exploration and Production Plc, through its subsidiary, PTTEP Energy Development
Company Limited to earn a 40% interest in Blocks G1/65 and G3/65, in the offshore
Gulf of Thailand.

**Key Highlights**

 * **Strategic Partnership**: Farm-in Agreement with PTTEP, the largest oil and 
   gas explorer, producer, and operator in Thailand;
 * **Substantial Acreage Expansion**: Increases Valeura’s gross acreage position
   in Thailand from 2,623 km² to 22,757 km²;
 * **Prime Location Adjacent to Major Infrastructure**: The Blocks are strategically
   positioned next to some of Thailand’s largest producing gas fields and Valeura’s
   oil fields;
 * **Discoveries**: 15 oil and gas discoveries on the Blocks, supported by 27 wells
   which encountered oil and gas pay;
 * **Infrastructure-Led Growth**: Existing discoveries and exploration prospects
   that the Company believes can be tied back quickly to existing oil and gas infrastructure;
   and
 * **Immediate Activity**: Exploration and appraisal work already underway with 
   3D seismic acquisition planned to commence in the coming months.

> **Dr. Sean Guest, President and CEO commented:**
> _“The spirit of collaboration between Valeura and PTTEP is strong, and we are 
> excited to begin work on this vast swath of prospective acreage in the Gulf of
> Thailand with the potential for both near and long-term natural gas and oil developments.
> __  PTTEP has an unparalleled depth of knowledge in Thailand and a proven track
> record of exploration and development success both in Thailand and throughout 
> the Southeast Asia region. _
> _Acquiring an interest in these Blocks increases our acreage in the offshore Gulf
> of Thailand substantially, and provides us with existing discoveries and attractive
> exploration prospects immediately adjacent to several world class gas fields and
> our producing oil assets.  Both Blocks already contain existing discoveries, and
> new exploration drilling has commenced in 2025, aimed at confirming sufficient
> gas and/or oil volumes for installation of new platforms that can be tied back
> to existing infrastructure.  While our initial focus is on pursuing these near-
> term development opportunities, there are also higher-risk/higher-reward prospects
> which we plan to explore, with the objective of building out a pathway for longer-
> term growth._
> _Our intent is to both expand and diversify our business both organically and 
> inorganically.  This Farm-in furthers that goal by layering in low cost, infrastructure-
> led exploration, while also adding gas developments within a welcoming jurisdiction
> that has prioritised energy development to fuel its growing economy.  We see this
> Farm-in and strategic partnership with PTTEP as an excellent opportunity to drive
> further value generation for our stakeholders.”_

**Farm-in**

Under the terms of the Farm-in, Valeura Energy is entitled to earn a 40% working
interest in the Blocks, with PTTEP holding the remaining 60% and continuing to operate.
The parties have agreed to a work programme for 2025 that includes drilling four
exploration wells (all recently completed) and acquiring just over 1,200 km^(2) 
of new 3D seismic data.  To earn its interest, Valeura will pay 40% of actual back
costs (US$14.7 million to June 30, 2025).  These costs include the recently completed
four-well 2025 drilling programme, geological and geophysical studies, PSCs signature
bonuses, and general and administrative costs incurred since the Blocks were awarded
in March 2023.  Valeura will also carry PTTEP on an additional seismic acquisition(
requested by Valeura) of approximately 165 km^(2) on Block G3/65, located to the
northeast of the Nong Yao field – capped at US$3.7 million (gross).  For costs thereafter,
each of PTTEP and Valeura will pay their respective pro rata share.

The Blocks are governed by the terms of Production Sharing Contracts (“PSCs”) granted
by the Thailand Government through the Ministry of Energy which set out fiscal terms
including a royalty payable to the Thailand Government at 10% of gross revenue, 
provisions for cost recovery up to 50% of gross revenue, and profits thereafter 
shared 50% government / 50% contractor.  The corporate income tax rate on contractor
net profit is 20%.

The PSCs provide for a six-year exploration period, during which a total of eight
wells must be drilled (five on G1/65 and three on G3/65), and 800 km^(2) of 3D seismic
must be acquired (500 km^(2 )in G1/65 and 300 km^(2 )in G3/65) before the end of
the exploration period in May 2029. A three-year extension to the exploration period
may be provided thereafter.  Fields developed under the PSC regime are given a 20-
year production period, with a potential 10-year extension thereafter.

Closing of the Farm-in is subject to the approval of the Government of Thailand.

**Block G1/65**

Block G1/65 comprises a gross area of 8,487 km^(2) immediately south of Valeura’s
B5/27 block (Jasmine/Ban Yen fields, 100% Valeura interest) and west of PTTEP-operated
large gas fields (Erawan, Platong, and Benchamas, currently producing 900 mmcf/d,
27 mbbls/d condensate, and 23 mbbls/d oil, respectively, based on May 2025 production
data disclosed by Thailand’s Department of Mineral Fuels).  The block is approximately
240 km long covering the north-western flank of the Pattani basin, the most prolific
basin in the Gulf of Thailand, and encircles the Rossukon oil field (2% Valeura 
gross royalty interest).  The block includes eight oil and gas discoveries, supported
by 12 wells which encountered oil and gas pay, as well as several undrilled prospective
trends.  PTTEP and Valeura have high-graded two focus areas on Block G1/65 which
will guide their initial work programme.

 * The Jarmjuree South area: A liquids-rich gas and oil-bearing structural trend
   between the producing Benchamas and Platong fields. The Company believes that
   the area has been substantially de-risked by four wells which confirmed the accumulation
   of both oil and gas in multiple stacked reservoir intervals.  PTTEP has just 
   completed a three-well appraisal drilling campaign in the Jarmjuree South area
   to further delineate the opportunity, and to date, one well has been disclosed
   by the Department of Mineral Fuels to have encountered gas pay.  Valeura anticipates
   that field development planning will follow in the near term, and after closing
   of the Farm-in, the Company intends to provide further detail on the next steps
   towards the commercialisation of this area.
 * The Maratee-Bussaba area: Located immediately south of the Rossukon oil field,
   contains a three-way closure structure as well as several combined structural/
   stratigraphic traps which have been identified as drilling candidates, based 
   on existing 3D seismic data over the area. Based on nearby producing fields and
   discoveries in the vicinity, the Company expects the trend to be an oil-prone
   fairway.  The planned 3D seismic acquisition on Block G1/65 will focus on the
   western portion of the Maratee-Bussuba area to better image the reservoir to 
   support further exploration drilling in this area.

**Block G3/65**

Block G3/65 comprises a gross area of 11,647 km^(2), bounding Valeura’s G11/48 block
in the north (Nong Yao field, 90% Valeura working interest) and is immediately west
of the large PTTEP-operated Bongkot gas field, which currently produces 850 mmcf/
d gas and 24 mbbls/d condensate, based on May 2025 production data disclosed by 
Thailand’s Department of Mineral Fuels.  The block is approximately 200 km long 
covering the northwest flank of the North Malay basin, and has seven identified 
oil and gas discoveries, supported by 15 wells with oil and gas pay.  Two key focus
areas have been identified on Block G3/65 which will guide the initial work programme.

 * The Nong Yao North-East area: Believed by the Company to contain an oil-bearing
   fairway between the Company’s Nong Yao field and the undeveloped Ubon oil field
   to the north. The area is expected to be covered with 3D seismic in 2025 to accurately
   define the prospects and thereafter Valeura anticipates the start of exploration
   and appraisal drilling.  Given this new opportunity, the Company’s objective 
   is to determine whether this area, or the recent Nong Yao-D discovery by Valeura
   in 2024, are better placed as the next tie-back development to Valeura’s operated
   processing infrastructure on the Nong Yao Field.
 * The Bussabong-Angun area: Located immediately west of PTTEP’s Bongkot gas field,
   is thought to contain extensive gas accumulations, as substantiated by multiple
   existing gas discoveries. PTTEP recently drilled an exploration well to fully
   validate the Bussabong opportunity, which has been disclosed by the Department
   of Mineral Fuels to have encountered gas pay.  The Bussabong discovery is a prime
   candidate for a fast-track gas development, potentially resulting in Company’s
   first gas reserves in Thailand.  Valeura is optimistic that development planning
   will progress at pace, and after completion of the Farm-in, the Company intends
   to provide further disclosure on next steps for the Bussabong gas accumulation.

**Results Timing**

Valeura Energy intends to release its unaudited financial and operating results 
for the three and six-month periods ended June 30, 2025 on August 7, 2025 and will
host a webinar the same day to discuss the results as well as today’s announcement.

Share on:
