# Union Jack Oil Joint Venture Partner Project Updates

- Link: https://www.directorstalkinterviews.com/union-jack-oil-joint-venture-partner-project-updates/4121116313
- Published: 2023-04-24T07:17:20+01:00
- Author: Emily Johnson

**[Union Jack Oil](https://www.directorstalkinterviews.com/company/union-jack-oil-plc/ujo.l)
plc** ([LON:UJO](https://www.directorstalkinterviews.com/company/union-jack-oil-plc/ujo.l))
a UK focused onshore hydrocarbon production, development and exploration company
noted that **Europa Oil & Gas (Holdings) plc** and **[Egdon](https://www.directorstalkinterviews.com/company/egdon-resources-plc/edr.l)
Resources plc**, as part of their Interim Reports, have today published commentary
on various projects in which Union Jack hold economic interests.

Union Jack’s results for the year ended 31 December 2022 will be published on Monday
15 May 2023.

The highlights from both companies’ commentaries on projects of interest to Union
Jack were as follows:

**EUROPA OIL & GAS (HOLDINGS) PLC**

**Wressle PEDL180/182**

·   Onshore UK – Wressle oilfield continues to exceed expectations, generating strong
levels of revenues and production

·   Wressle net production increased 55% from 134 bopd to 207 bopd as the field 
performed better than expected

·   Wressle now the second most productive onshore UK oilfield

·   The well continues to produce under natural flow with zero water cut and remains
highly cash generative

·   A new seismic interpretation and mapping exercise across the Wressle field has
highlighted a potentially significant increase in resources from the Ashover Grit
and the results of the analysis are now being incorporated into the field development
plan. The intention is that the next development well will be drilled from the existing
Wressle site and planning and permitting work for the well is ongoing. The well 
will be drilled at the earliest opportunity, subject to receipt of regulatory approval

·   Ongoing work to further develop the field and to utilise the associated gas 
being produced from Wressle which is expected to lead to further increases in oil
production during H2 2023

·   An independent technical report has been commissioned which will incorporate
the new field interpretation, historic production performance data and the field
development plan. The report is expected to be completed during June 2023

·   Europa contributes to the Wressle Community Fund, which has been operating since
early 2022 and provides funds to meet the needs of local charities and community
groups. The Company and its Wressle JV partners make an annual contribution of £
100,000 to the fund

The Wressle oilfield’s continued excellent performance has underpinned our significant
growth in revenues during the period, and a number of projects are underway to enable
increased oil production and gas monetisation from the field. The first phase of
the gas utilisation project was completed in January whereby three microturbines
were connected to provide site power which have resulted in a c. 10% increase in
oil production. The second stage is the installation of a gas engine to generate
1.4 MW of electricity into a local private power network.

The first half of the financial year was a significant period for Europa, and the
outstanding performance of Wressle, our flagship producing asset, has enabled us
to strengthen our financial foundations by continuing to deliver material cashflow,
facilitating further investment in our existing assets driven by Wressle’s impressive
daily production rate. Planned gas monetisation solutions for Wressle, coupled with
the planned drilling of a development well scheduled for H2 2023, demonstrates our
continued commitment to upgrading this key asset to augment production and generate
additional revenues, whilst also eliminating flaring from the field.

Wressle, currently the second most productive onshore UK oilfield, continues to 
surpass all expectations, and we remain committed to further enhancing the field’s
efficiency and increasing production through gas monetisation solutions, alongside
advancing the development drilling to enable further production.

**EGDON RESOURCES PLC**

**Wressle PEDL180/182**

·    The Wressle oil field continued to be the standout asset for Egdon, producing
at an average rate of 689 barrels of oil per day (“bopd”) during the period.  Total
field production from Wressle to 31 January 2023 stood at 357,838 barrels of oil
with no water production.

The key operational focus for the coming period will be:

·    Maintaining and enhancing the strong production performance at Wressle whilst
progressing both the gas monetisation and further development drilling as priorities.

The standout asset for Egdon continues to be Wressle (Egdon 30%). Cumulative oil
production to 31 January 2023 was 357,838 barrels and production exceeded 400,000
barrels on 28 March 2023 with no production water seen to date. Production during
the Period averaged 689 bopd.  Three microturbines were connected during January
and February and have been fully operational since late February.  So far these 
have resulted in a c. 10% increase in oil production when compared to that possible
without the turbines being operational and further optimisation is ongoing. Production
rates averaged 770 bopd during March 2023.

The commissioning of the micro-turbines was the first step in the gas utilisation
scheme.  The second stage will be the installation of a separate gas engine to generate
and export electricity into a local private power network. Detailed feasibility 
work has confirmed that the local network can accept c.1.4 MW of electricity and
suitable used gas engines are currently being assessed due to the long lead times
for new units. 

During the Period Egdon has completed reprocessing of the 3D seismic data and finalised
a new seismic interpretation and mapping exercise across the Wressle field. This
has highlighted a potentially significant increase in resources from the Ashover
Grit at Wressle and a new Competent Person’s Report has been commissioned to consider
all oil and gas bearing formations at Wressle and incorporating the new field interpretation
and production performance data.  This new technical report will inform the optimal
development of the Ashover Grit and Penistone Flags reservoirs and we look forward
to providing more details of the forward plan once this work is complete.   Planning
and permitting work is currently ongoing for a new well or wells from the existing
Wressle site. The intention will be to drill at the earliest opportunity, subject
to receipt of regulatory approval.  Stage two of the gas monetisation which will
focus on gas export will also be included in the planning application.

The Wressle Community Fund has been operating since early 2022. In August 2022, 
operation of the fund was transferred to Broughton Community and Sports Association
which will run the fund to meet the needs of local charities and community groups.
The Wressle JV is making £100,000 a year available to the fund.

**Biscathorpe PEDL253/North Kelsey PEDL241**

Biscathorpe (Egdon 35.8%) and North Kelsey (Egdon 50%) are volumetrically significant
prospects with each having gross Mean Prospective Resources of around 6.5 million
barrels. Drilling is dependent upon the outcome of the planning appeals, but with
a positive outcome would be expected in H1 2024.

A planning hearing was held for Biscathorpe on 11 October 2022 and we await the 
decision from the Planning Inspectorate. 

The appeal documentation for North Kelsey was submitted on 8 August 2022 and a Public
Hearing is due to be held on 14 June 2023, with a decision expected during July 
2023.

**Keddington PEDL005(R)**

Keddington (Egdon 45%) continued to contribute tangible revenues. A viable drilling
location in the east of the field has been identified targeting around 180,000 barrels
of incremental production.  Planning is in place for this and the well is likely
to be drilled during H2 2023.

**Fiskerton Airfield EXL294**

Fiskerton Airfield (Egdon 80%) has remained shut-in during the period. There remains
the potential for the site to be used to manage any produced water from other Egdon
sites through the existing water injection well.