**The Renewables Infrastructure Group Limited **(LON:TRIG) is a London-listed renewable
energy investment company. TRIG creates shareholder value through a resilient dividend
and long-term capital growth, underpinned by a diversified portfolio of renewable
energy infrastructure, and managed jointly by specialist investment and operations
managers.

**Net Asset Value, dividend & portfolio update – Q4 2025**

·     Estimated unaudited Net Asset Value of 104.0 pence per share as at 31 December
2025, a decrease of -5.7p per share in the fourth quarter, resulting from:

o  Reduction in revenue forecasts of -1.8p;

o  Low power prices in Sweden, grid outages and operational updates of -1.8p;

o  Increases in discount rates for UK offshore wind projects of -1.2p; and

o  The impact of the UK Government’s change in indexation basis (from RPI to CPI)
for Renewable Obligation Certificates and Feed-in-Tariff in the UK of -0.6p, in 
line with previous reporting, and the impact of the UK Autumn 2025 Budget of -0.3p.

·      The dividend declared on 5 February 2026 meant the Company has delivered 
on its 2025 dividend target of 7.55 pence per share. For the full year, gross cash
cover was 2.1x before the repayment of £192m project level debt. TRIG is differentiated
in that its long-term debt is fixed rate and is scheduled to be repaid within the
term of government revenue contracts and long-term corporate power purchase agreements
resulting in low interest rate risk and low refinancing risk. Net dividend cover
for the year was 1.0x demonstrating the resilience of the business model in the 
context of a challenging year.

·      The Board remains committed to the Company’s progressive dividend policy,
which is to at least maintain the level of dividends and increase them when it is
prudent to do so. The 2026 dividend target is maintained at 7.55 pence per share
^(1). In setting the dividend target for 2026, the Board has prioritised restoring
net dividend cover to the range 1.1x – 1.2x and future growth of the NAV.

·      The Managers continue to actively advance the Board’s strategy as was set
out at the Capital Markets Seminar in May 2025:

o  Drawings under the revolving credit facility have been reduced to c. £200m following
the completion of a £200m private placement debt issuance, as announced on 12 February
2026. The Managers continue to progress disposal activities to reduce short-term
borrowings further.

o  Good progress towards the total £70m value enhancements targeted for 2025 and
2026, with £32m added to portfolio valuation in 2025 across:

§ Revenue enhancements, including the accretive 10-year, fixed-price corporate power
purchase agreement signed with Virgin Media O2;

§ Operational enhancements, including technical upgrades rolled out across 224MW
onshore wind in the year; and

§ Construction & development activities with three projects in construction that
will add over 200MW to TRIG’s electricity storage and generation capacity. Decommissioning
of the old Cuxac onshore wind farm, which is being repowered, together with installation
of new foundations and cabling were completed in the quarter.

o  £80m of the Company’s £150m share buyback programme has been completed and with
the private placement debt having been raised, the pace of the buyback programme
will be increased following the publication of the 2025 Annual Report & Accounts
on 27 February 2026.

**_Q4 2025 movements in Net Asset Value per share_**

The key drivers of the movement in NAV per share over the quarter are summarised
in the table below:

|  | **Net Asset Value****(p / share)** | **Movement****(p / share)** | 
| NAV per share at 30 September 2025 | **109.7** |  | 
| Q4 performance, operational updates and value enhancements |  | (1.8) | 
| Changes to revenue forecasts |  | (1.8) | 
| Discount rates |  | (1.2) | 
| Regulatory and taxation changes |  | (0.9) | 
| Share buybacks |  | 0.1 | 
| NAV per share at 31 December 2025 (unaudited)^(2) | **104.0** |  |

**_Q4 2025 performance, operational updates and value enhancements_**

Generation was 5% below budget for the quarter. The diversification of the portfolio
tempered the impact of any one region or technology on overall performance in the
quarter. Good generation from TRIG’s offshore wind portfolio was more than offset
by below budget generation in Sweden and TRIG’s UK onshore wind portfolio. In Sweden,
both economic curtailment, which is when low or negative power prices make it uneconomic
to generate, and grid curtailment, resulting from congestion in the electricity 
grid, continued to be greater than budgeted. Grid downtime whilst the local grid
operator undertook reinforcement works meant that the Mid Hill onshore wind project
in the UK did not export electricity in the quarter.

The legal challenge in relation to the Vannier onshore wind farm in France, which
was first reported in the 2024 Annual Report, was heard in court and resulted in
the regularisation process (reinstatement) of the environmental permit being stopped.
The case is being escalated through the courts system. The wind farm’s generation
remains suspended. A provision of 0.3p per share is included in the NAV.

The Renewables Infrastructure Group’s management team continues to progress value
enhancement activities having added £32m to the portfolio valuation in 2025 (£3m
in the quarter), which marks strong progress towards the target to add £70m in total
to portfolio value between 2025 and 2026. Highlights in the quarter include:

·      The 78MW Ryton battery storage project in the UK is in the final stages of
construction and commissioning. During the quarter, an electricals contractor was
replaced and the grid connection delayed by the local network operator. These events
are expected to delay the energisation of the project to Q2 2026. The project cost
is expected to remain in line with budget.

·      Construction of the 100MW two-hour Spennymoor battery storage project is 
underway, on time and on budget, and is expected to be energised in 2027.

·      Under NESO’s ongoing Connections Reform process in the UK, 419MW of TRIG’s
two-and four-hour battery pipeline met the Gate 2 criteria to secure a pre-2035 
grid connection date. Of this capacity, 232MW qualified for priority grid connection
before 2030 (known as Gate 2 Phase 1 projects) and 187MW qualified for grid connections
between 2031 and 2035 (known as Gate 2 Phase 2 projects). This is in addition to
the Ryton and Spennymoor projects.

·      The 264MW Valdesolar solar project in Spain, in which TRIG owns a 49% equity
interest, continues to progress the development of a co-located 200MW two-hour battery.

·      The repowering of the Cuxac onshore wind farm in France continues to progress
well with the old site now fully decommissioned. Through the repowering, the site
capacity is being doubled from 12MW to 25MW. The repowered project will benefit 
from a new 20-year inflation-linked government-backed tariff at €86/MWh.

·      The 13MW Claves onshore wind repowering project in France secured a new 20-
year inflation-linked government-backed feed-in-tariff at €87/MWh.

Strong commodity prices and attractive price hedges meant that power price levels
achieved in the quarter were on average above budget, which reduced the adverse 
impact of the below budget generation.

Sterling appreciated slightly against the Euro in the quarter, decreasing the value
of Euro denominated investments. FX hedge gains more than offset this movement leading
to a small net FX gain in the quarter.

**_Changes to revenue forecasts_**

TRIG uses the average of three leading power price forecasters’ projections. These
are adjusted for the price that a variable renewables project captures compared 
to the average wholesale price and the resulting discount is known as cannibalisation
^(3). This means that TRIG captures the breadth of views on the evolution of the
electricity market and supply demand dynamics. This is important as forecasters’
views may diverge. During the quarter, lower gas prices, which feed into electricity
prices, and lower demand for green certificates have resulted in a reduction in 
forecasters’ near-term price projections during the quarter.

**_Discount rates_**

UK offshore wind discount rates have been increased by 0.5% in Q4 2025 to reflect
the greater volume of UK offshore wind investment opportunities in the market relative
to the available capital. The Managers assess that discount rates remain appropriate
across other sectors and geographies in the portfolio. TRIG’s weighted average portfolio
valuation discount rate is now 9.0% (31 December 2024: 8.6%).

**_Regulatory and taxation changes_**

On 28 January 2026, the UK’s Department of Energy Security and Net Zero confirmed
it was changing the basis of inflation for Renewable Obligation Certificates (“ROCs”)
and Feed in Tariffs (“FITs”) from RPI to CPI, effective 1 April 2026. This change
reduced NAV by 0.6p per share in line with previous guidance. TRIG has relatively
limited exposure to UK ROC and FIT revenues (19% of projected revenues for 2026)
given the nature of its diversified portfolio.

The reduction in capital allowances and increase in business rates announced in 
the UK Government’s Autumn 2025 Budget reduced NAV by an additional 0.3p per share.

**_Capital allocation_**

The Company has delivered on its 2025 dividend target of 7.55 pence per share. For
the full year, gross cash cover was 2.1x before the repayment of £192m project level
debt. Net dividend cover for the year was 1.0x demonstrating the resilience of the
business model in the context of a challenging year.

The Board remains committed to the Company’s progressive dividend policy, which 
is to at least maintain the level of dividends and increase them when it is prudent
to do so. The 2026 dividend target is maintained at 7.55 pence per share^(1). In
setting the dividend target for 2026, the Board has prioritised restoring net dividend
cover to the range 1.1x – 1.2x and future growth of the NAV.

On 12 February 2026, the Company announced the completion of a £200m private placement
debt issuance (the “Notes” or the “Issue”). The Notes convert short-term floating
rate debt into long-term fixed rate debt. The Company’s debt maturity profile is
extended by converting the equivalent drawing on the RCF into a longer, amortising
tenor. The Notes secure a fixed weighted average interest rate of 5.23%, which is
broadly consistent with the current RCF. The Notes have a maturity date of February
2038 and amortise in equal instalments of £20m every six months from August 2033
to February 2038 (inclusive). The maturity of the Notes aligns with TRIG’s current
fixed price revenue forecast profile. Proceeds of the Issue have been used to reduce
the existing drawings under the Group’s revolving credit facility (“RCF”) of £398m,
as of 31 December 2025, to c. £200m. The Managers continue to progress material 
disposal activities to reduce short-term borrowings further.

As at 12 February 2026, £80m of the current £150m share buyback programme had been
deployed in the repurchase of The Renewables Infrastructure Group shares. Share 
buybacks added 0.1p per share to NAV in the fourth quarter.

_^(1)_ _Past performance is not a reliable indicator of future results. There can
be no assurance that targets will be met or that the Company will make any distributions,
or that investors will receive any return on their capital. Capital and income at
risk._

_^(2)_ _NAV per share at 31 December 2025 presented after unwind of the discount
rate, company costs and payment of the quarterly interim dividend._

_^(3)_ _Cannibalisation refers to the reduction in captured power prices that occurs
when large volumes of renewable generation come onto the system at the same time.
As renewables have low marginal costs, additional supply pushes wholesale prices
down during periods of high renewable output, meaning renewable generators typically
earn less than the average wholesale power price._