**2022 HIGHLIGHTS**

**FINANCIAL**

·       Revenue for the year ended 31 December 2022 was $49.3 million (31 December
2021 – $40.0 million)

·       EBITDA for the year ended 31 December 2022 was $12.7 million (31 December
2021 – $12.3 million)

·    The Company generated net income of $1.6 million, which includes a $1.9 million
asset impairment (31 December 2021 – net income of $8.4 million)

·       The Company realised a net price of $149.46/boe for the year ended 31 December
2022, comprising:

o   Realised oil price – $94.39/bbl

o   Realised natural gas price – $34.53/Mcf

·       The Group’s operating netback remained strong for the year ended 31 December
2022 and was $107.59/boe (31 December 2021 – $44.60/boe), comprising:

o   Romania operating netback – $181.57/boe (31 December 2021 – $52.44/boe)

o   Tunisia operating netback – $54.34/boe (31 December 2021 – $29.77/boe)

·       Capital expenditures of $12.9 million (31 December 2021 – $10.7 million),
comprising:

o   Romania – $8.4 million

o   Tunisia – $4.5 million

·     Third party reserves report attributes $85.4 million of Net Present Value 
at a 10% discount rate to the audited Proved and Probable Reserves of the Company
as at 31 December 2022

·      Cash balance as at 31 December 2022 was $4.9 million

**OPERATIONAL**

·      Completed the Romanian near-term exploration programme in 2022. Drilled two
exploration wells in Romania in 2022. Both the Moftinu Nord-1 well and the Canar-
1 well encountered gas in targeted reservoirs however quantities did not justify
commercial development

·     The Canar-1 well has been completed for use as a solar powered water injection
well.  Water from Moftinu field is being disposed of at Canar-1 resulting in a cost
saving of approximately $800,000 per year

·    The second compressor at the Moftinu field was commissioned in February 2022.
The compressors have stabilised production and will extend overall field life

·     The Company initiated a comprehensive block wide Geological Review engaging
RISC Consultancy to take the Company’s existing database of 2D, 3D and well data
and using that database construct a consistent geological model.  This model, containing
all of the extensive legacy and modern data covers the entirety of the 3000 km^(
2) Satu Mare concession 

·      Knowledge from the Moftinu field development and recent exploration drilling
has been incorporated into the comprehensive geological model to guide the Company
in its further exploration of the highly prospective and multi-play Satu Mare concession

·     In Tunisia, the workover to install the first submersible pump for the Artificial
Lift programme has commenced at the Sabria field.  Plans for additional pumps in
the Sabria field are being progressed

·       Workovers in the Chouech Es Saida field continue the increased production
from wells CS-3 and CS-1

·       Production for the year averaged 889 boe/d, comprising:

o   Romania – 379 boe/d

o   Tunisia – 510 boe/d

2022 Annual Report and Accounts

(US dollars)

# SERINUS AT A GLANCE

Serinus is an oil and gas exploration, appraisal and development company.  The Group
acts as the operator for all of its assets and has operations in two business units:
Romania and Tunisia.

## ROMANIA

In Romania the Company currently holds the 3,000km^(2) Satu Mare Concession.  The
Satu Mare Concession area includes the Moftinu Gas Project which was brought on 
production in April 2019 and has produced approximately 9.2 Bcf and $90.9 million
of revenue to the end of 2022.  In addition to the Moftinu Gas Development Project
the Satu Mare Concession holds several highly prospective exploration plays.  Serinus’
recently completed block wide geological review has highlighted the potential of
several plays that have encountered oil and gas on the block.  Focus on proven hydrocarbon
systems known productive trends that need further data and studies over 40 legacy
wells on the concession area have encountered oil and gas.  The Company has identified
numerous additional gas prospects identified by historic drilling and legacy 2D 
seismic.  The concession is extensively covered by legacy 2D seismic, augmented 
by the Company’s own 3D and 2D acquisition programs that have further refined the
identified prospects.  Putting this extensive evidence based analysis together in
a block wide review has allowed the Company to identify a pathway towards future
exploration growth.

## TUNISIA

The Company’s Tunisian operations are comprised of two concession areas.  The largest
asset in the Tunisian portfolio is the Sabria field, which is a large oilfield play
with an estimated original in-place volume of 445 million barrels-of-oil-equivalent
of which 1.1% has been produced to date.  Serinus considers this historically under-
developed field to be an excellent asset for development work to significantly increase
production in the near-term.  The Company has embarked on an artificial lift programme
whereby the first pumps in the Sabria field will be installed.  Independent third-
party studies suggest that the use of pumps in this field can have a material impact
on production volumes.  The Chouech Es Saida concession in southern Tunisia holds
a producing oilfiled that produces from three wells.  Underlying this oil field 
are significant gas prospects.  These prospects lie in a structure that currently
produces gas in an adjacent block.  Exploration of these lower gas zones became 
commercially possible with the recent construction of gas transportation infrastructure
in the region.  Upon exploration success these prospects can be developed in the
medium term, with the ability to access the near-by under-utilised gas transmission
capacity.

# OPERATIONAL SUMMARY AND OUTLOOK

## CORPORATE

With the disruption of the COVID-19 pandemic and the associated global supply chain
interruptions receding in 2022 the Company was able to advance its exploration and
development projects.  A critical foundation to the advancement of these projects
is the cash flow generation inherent in our production assets.  For the year to 
31 December 2022, the Company generated cashflow from operating activities of $7.5
million and invested $10.7 million of capital expenditure.  The Company has a working
capital surplus and in 2022 allocated the majority of the cash flow generated by
the businesses to near-term exploration and production opportunities.

The Company continues to focus on the active management of the Moftinu Gas field
production levels.  The Moftinu gas field is a shallow gas field that has initial
high production rates followed by natural declines.  Managing these declines to 
extract the most value from the gas in place has allowed the Company to extract 
$90.9 million of revenue from this field since production began in 2019. 

The Company continues to advance the implementation of its artificial lift programme
in the Sabria field in Tunisia, beginning with the Sabria-W1 well.  In 2022 the 
Company was frustrated in accelerating the installation of the first pump in the
Sabria field by the default of the national rig company in Tunisia, Compagnie Tunisienne
de Forage (“CTF”).  The initial rig contract committed CTF to provide their rig 
CTF-006 in mid-2022 but CTF was unable to provide the rig as per their contractual
obligation.  An alternative rig (CTF-004) was mobilised to the site in December 
2022.

The Company’s capital programme in 2022 was therefore concentrated on the two exploration
wells, Canar-1 and Moftinu Nord-1, drilled in Romania and the acceleration of the
design and permitting of a new 2D seismic programme.  The new 2D seismic was designed
to complement the existing 2D seismic and tie to existing 3D seismic data to refine
the high-rank prospects adjacent to the Moftinu gas field.

The Company, under the authority granted by the shareholders at the 2022 Annual 
General Meeting, executed the purchase of its own shares.  The Board believes that
the share price at the time of its purchases did not reflect the intrinsic value
of the business and will continue to evaluate the investment return of share buybacks
as part of its allocation of capital across the Group (note 17).

**ROMANIA**

The Group’s Romanian operating subsidiary holds the licence to the Satu Mare concession
area, covering approximately 3,000 km^(2) in the north-west of Romania.  The Moftinu
Gas Development project began production in 2019.  The development project includes
the Moftinu gas plant, and currently has four gas production wells – Moftinu -1003,
Moftinu-1004, Moftinu-1007 and Moftinu-1008.  During 2022, the Company’s Romanian
operations produced a total of 826 MMcf of gas and 527 barrels of condensate, equating
to an average daily production of 379 boe/day.

The Company has completed all of its commitments under the third exploration phase
of the Satu Mare Concession Agreement, and in October 2021, received an additional
two-year evaluation phase on the Satu Mare Concession until 27 October 2023.  The
Company is in routine conversations with the National Agency for Mineral Resources(“
NAMR”) regarding the further extension of this concession and will apply for a further
appraisal period during 2023.  The greater Moftinu gas field area has been declared
a commercial field and is exempt from this routine licence extension procedure.

During the year the Company drilled two exploration wells; Canar-1 and Moftinu Nord-
1, adjacent to the Moftinu gas field.  These near field prospects were selected 
due to their proximity to the Moftinu Gas Plant.  It was expected that, upon success,
these fields could be quickly tied into the existing processing infrastructure to
deliver near-term cash flow.  Regrettably both wells discovered gas in the expected
zones however neither field contained sufficient gas to justify commercial development.
The Canar-1 well was drilled on time and under budget and encountered gas in four
prospective zones.  Post drilling analysis suggest that the seal of the reservoir
was compromised and did not sufficiently prevent the gas from migrating away from
the reservoir.  The Moftinu Nord-1 well was drilled on time and under budget but
demonstrated a similar compromise of seal to the Canar-1 well.  Whilst it is disappointing
to have discovered gas but to have that gas be in insufficient quantities, these
two wells give greater insights into those risks that must be focused on while drilling
exploration wells on various prospects.  Both Canar-1 and Moftinu Nord-1 demonstrated
Type-3 AVO responses.  Typically, such a response is considered a Direct Hydrocarbon
Indicator.  The two exploration wells demonstrated the effectiveness of the AVO 
responses and the use of AVO to identify gas accumulations.  The wells also highlighted
the requirement to focus on seal types to allow for future success, especially for
such shallow targets.  In the third quarter of 2022 the Company initiated a third
party independent geological review of the Satu Mare Concession.  This review was
designed to be a block wide review of the geological development of the many play
types on the block.  The review was conducted by RISC, a geologic consulting firm,
and was designed to combine the myriad of technical information into a block wide
exploration model.  During the study Serinus technical personal worked with RISC
to analyse the many historical wells and multitude of legacy 2D seismic.  This is
the first time that a block wide review of all technical information has been prepared
and the results are a valuable tool for future exploration opportunities.

Additional interpretation work is also being conducted on the Santau 3D area with
a view to confirming drilling locations on prospects that will form the basis for
future multi-well drilling campaigns.

After the drilling of Canar-1, the Company has implemented the technical program
to convert this well into a water injection well.  This will allow the produced 
water volumes from the Moftinu wells to be injected in Canar-1.  The Company applied
for and received all local and national permits, to get Canar-1 approved as a water
injection well.  Produced water injection began in the fourth quarter of 2022.  
The use of Canar-1 as a water injection well has resulted in a significant savings
in operating expense.  Previous water disposal required extensive trucking of produced
water volumes, injection using the Canar-1 well has resulted in cost savings in 
water transportation and water injection of 91%, approximately $800,000 per year.
At these injection levels, Canar-1 will recover the cost of drilling and conversion
to water injection during 2023. 

The Company incorporated a new gas trading subsidiary, Serinus Energy Romania Trading
S.r.l. in October 2021, which trades the Company’s Romanian gas production into 
the Romanian market.  Serinus Energy Romania Trading S.r.l was created to allow 
our licensed gas traders to directly access the Romanian gas market and to capture
the full value of gas prices in Romania through the ability to access all available
types of contracts of various durations and respond accordingly to the price signals
of these contracts.  Gas pricing in Romania has moved significantly in 2022 from
a low of $31/Mcf to a high of $67/Mcf.  Much of this price volatility has occurred
counter to typical pricing seasonality.  The ability of the Company to utilise its
own gas trading function has resulted in an average realised price of $39.96/Mcf
for 2022, with an average realised gas price of $37.07/Mcf in the fourth quarter
of 2022.  Whilst lower than the highs of 2022 current gas prices on the Romanian
Commodity Exchange (“BRM”) remain strong over the first quarter of 2023.

Serinus has continued to operate safely and effectively in Romania throughout the
period.  As at the year-end 2022, the Company had achieved 1,347 accident-free days
of continuous operation which is a testament to the professionalism and hard work
of our team in Romania.

The Company has a deemed 100% working interest in the concession as its partner 
has defaulted on its obligations under the Joint Operating Agreement.  The Company
has filed a Request for Arbitration with the Secretariat of the International Court
of Arbitration of the International Chamber of Commerce seeking a declaration affirming
the Company’s rightful claim of ownership of its defaulted partner’s 40% participating
interest and to compel transfer of that interest to the Company.  

After the year-end the Company announced the successful conclusion of its arbitration
against its former partner.

## TUNISIA

The Company currently holds two concession areas within Tunisia.  These concession
areas both contain discovered oil and gas reserves and are currently producing. 
The largest asset is the Sabria field.  Sabria is a large, conventional oilfield
which the Company’s independent reservoir engineers have estimated to have approximately
445 million barrels of oil equivalent originally in place.  Of this oil in place
only 1.1% has been produced to date due to a low rate of development on the field.
Serinus has spent extensive time studying the best means of further developing this
field and considers this to be an excellent asset for remedial work to increase 
production and, on completion of ongoing reservoir studies, to conduct further development
operations.

A major project for the operations in Tunisia in 2022 is the introduction of the
first Artificial Lift programme to be implemented on the W-1 well in the Sabria 
field.  The W-1 is a currently suspended well that was identified as a candidate
to benefit from the installation of a pump.  The Company agreed a rig contract with
the Compagnie Tunisienne de Forage (“CTF”), the national drilling company.  The 
contract allowed for the provision of a drilling rig to conduct the W-1 workover.
The rig was originally scheduled to have been delivered to the W-1 site in May 2022.
The Company was made aware that for a variety of reasons CTF was unable to provide
the rig that was named in the agreed rig contract, CTF-006.  Additionally, CTF informed
the company that it did not have another rig available and suitable for the work
that the Company anticipated.  Having defaulted on the contract, CTF worked with
the Company to procure a replacement rig.  However, the replacement rig, CTF-004
was only able to be provided late in 2022.  This frustrating delay has meant that
the W-1 work over and pump installation has not been completed in 2022.  Following
the successful completion of the W-1 workover and pump installation the Company 
anticipates commencing a programme to install artificial lift in the remaining candidate
wells in Sabria.

The delays faced by the CTF default have also affected the workover of the N-2 well
in Sabria.  This well was drilled in 1980 but was damaged during completion and,
although in proximity to producing wells, was not able to flow oil to surface due
to damage during completion.  The workover program will re-complete the well and
remove any wellbore restrictions.  The Company anticipates that the N-2 well will
be on production in mid-2023.

During the year, the Company conducted further workover operations in the Chouech
Es Saida area to replace and standardise pumps in order to increase production and
efficiency.  Better pump design and installation has increased the pump life from
seven months in 2019 to 24 months in 2022.  The Company has applied to extend the
Ech Chouech licence but this expired in June 2022.  The Company intends to continue
its application to regain the licence once the licence process is formalised.

## COVID-19

The Company continues to place the health, safety and wellbeing of all our staff
as our top priority.  The Company continues to follow government recommendations
such as enhanced sanitation of work sites, social distancing and wearing masks. 
Where government advice has required, the Company closed or reduced the presence
of staff in our Head Office, Administration Office and our Business Unit Offices.
Our field operations continue to remain ready to modify daily tasks and routines
to ensure safe practices for all staff, as required.  Existing operations have remained
in production and our producing assets have seen no significant operational setbacks
resulting from the COVID-19 pandemic.

# SERINUS INVESTMENT THESIS

Investment in Serinus offers shareholders an ability to access international oil
and gas upstream operations with strong cash flow generation through the oil and
gas commodity cycle.  Our low-cost onshore asset base provides significant near-
term production growth opportunities.  The size of the existing asset base allows
for significant organic growth without incremental asset acquisition cost in areas
where our technical knowledge has been refined over the years that Serinus has operated
these concession areas.  Serinus offers a compelling growth opportunity where risks
are mitigated by our extensive experience in our operating areas and the low-cost
nature of our assets.   The Company’s existing assets also include large exploration
prospects within close proximity of existing infrastructure.  The Company allocates
capital to these exploration prospects which if successful can add meaningful production
and cash flow to the Group.

Serinus’ operations in Romania are focused on the large Satu Mare Concession Area.
The Satu Mare Concession Area is located in the north west of Romania along-side
the Hungarian border.  This large block contains the Moftinu gas field, and the 
Company believes that numerous shallow gas opportunities with similar characteristics
to the Moftinu field are present in the immediate surrounding area.  In addition,
the southern portion of the concession offers excellent exploration opportunities
for large oil prospects as across the southern boundary of the Satu Mare concession
is the Suplacu de Barcau oil field (held by OMV Petrom).  This is a significant 
oilfield estimated to have produced in excess of 100 million barrels.

In Tunisia, the Company’s operations are focused on the Sabria and Chouech Es Saida
fields.  Sabria is a very large conventional oilfield where our independent reservoir
engineers have accessed a field with 445 million barrels of oil equivalent originally
in place.  Of that number approximately 1.1% has been recovered to date.  This is
a very low recovery factor for a conventional oilfield and the Company expects to
increase that recovery factor materially.  The Chouech field in southern Tunisia
offers attractive opportunities to increase production from existing oilfields through
the application of standard oilfield practices.  Serinus’ Tunisian assets can be
typified as existing discovered and producing oilfields where field optimisation
provides the path to production, revenue and cash flow growth with no exploration
risk.  Underlying the Chouech field is the prospective Acacus gas zone.  Gas has
been discovered and produced from this zone in nearby concessions and recent gas
infrastructure developments make this exploration opportunity commercially attractive.

In addition to the strong asset base Serinus has a strong and experienced management
team.  Within each jurisdiction, we have local professionals managing the operations.
Within the Company we have significant technical and commercial experience and are
able to apply that experience across our business units.

# SERINUS’ STRATEGY

## VISION

The Group’s goal is to transform the potential of its extensive land base in Romania
and Tunisia into enhanced shareholder value through the efficient allocation of 
capital.

## STRATEGY

Serinus is focused on significant growth potential within its existing concession
and license holdings in Romania and Tunisia through the development of low cost,
high return projects, as follows:

1.   Leverage Land Position:

·    One concession in Romania with multiple play types and prospects

·    Two exploration and production concessions in Tunisia with all work commitments
completed

·  Extensive oil and natural gas exploration and development potential within multiple
play horizons

2.   Commitment to Shareholders:

·    Cohesive management team with a commitment to enhancing shareholder value

·    Abide by the highest thresholds of disclosure for an AIM-listed company

·    Extensive experience and a proven track record of the allocation of shareholder
capital

3.   Manage Risks:

·   Managing surface and subsurface risks through constant evaluation and introduction
of new technologies

·    Allocate capital to projects with attractive returns at relatively low risk
profiles

·    Operator of all concessions allows for cost control

4.   Focus on Growth:

·  Leverage cash flow to grow through expanded exploration and development of the
existing asset base

·    Seek acquisitions that will provide synergies at a cost that is accretive to
shareholders**

# CHAIRMAN’S LETTER

Dear shareholders,

It is my pleasure to write this letter to you as Chairman of Serinus Energy plc.

2022 is another year that will be remembered by all of us, primarily due to tragic
war developments also heavily impacting oil and gas sector.  Our Board, however,
is eager to report that notwithstanding the constraints, the Company continues to
generate strong cash flow and earnings.  As shareholders will recall 2021 was the
first year since the Company’s inception that positive earnings were generated. 
I am happy to report that the trend is being continued and that the Company generates
positive earnings from operations in 2022.  Cost control remains essential to a 
cyclical commodities based business and I can assure you that in our case it does
remain stable in the face of some very difficult inflation.

Inflation remains one of the challenges posed by the COVID-19 pandemic and our team
has remained focused on executing our business plan and delivering value to our 
stakeholders.  Our production has declined in Romania in line with the parameters
of a shallow gas field.  It is now important that we use our technical skills to
find the next Moftinu Gas Development.  It must be remembered as we near the $100
million of revenue from the Moftinu gas field that these low-cost high return shallow
gas fields offer dramatic earnings.  Consequently the strategy in Romania remains
the same as we transition to finding the another Moftinu-like opportunity.  The 
Satu Mare Concession is a very large concession and we have so far identified more
than thirty prospect opportunities with expected 181 million barrels of oil equivalent
to be explored for.  Upon success any one of these prospects can offer the so rewarding
returns we saw with Moftinu.  There are clearly major opportunities yet to be discovered
there.

In Tunisia our strategy continues to focus on the improvement in recovery from the
Sabria field.  Sabria is a large conventional oil field that has had little more
than one percent of the in-place oil volumes recovered.  Social and political turmoil
in Tunisia has made our work difficult but we remain confident in the technical 
capabilities of our teams and the large upside that is available in Sabria.  As 
we look beyond the artificial lift programme our teams are preparing the technical
work for new wells.  As part of the longer-term strategy the Company would be eager
to have the conditions allowing for new producing wells to be drilled in Sabria.

We have also made important investments in our operations, including drilling new
wells and upgrading existing facilities.  As the nature of our business sometimes
unfortunately dictates the exploration wells drilled in Romania were not commercially
successful and I certainly share our shareholders frustrations when we come so close
by discovering gas but fail at a later stage as there was simply not enough gas 
to ensure commercial sales. This was highly disappointing however I know that this
is what exploration is like and I am comfortable that the low-risk, low-cost nature
of our exploration programme will come to success in the near future.

Looking ahead, we are confident in the future of the energy sector, countries that
we operate and the continued growth of our company. We remain focused on executing
our strategy, delivering value to our shareholders, and contributing to the communities
in which we operate.

Thank you for your continued support. I look forward to updating you on our progress
in the coming year.

Yours sincerely,

Lukasz Rędziniak, Chairman of the Board of Directors

17 March 2023

**LETTER FROM THE CEO**

Dear Fellow Shareholders,

2022 was an operationally challenging year for Serinus as inflation continued to
pressure the business.  Sweeping inflation in costs across the business required
nimble solutions and a far greater degree of anticipation as we worked to achieve
our operational targets.  The Company reacted by ordering long lead items for our
drilling plans well in advance of what we would normally consider.  These actions
allowed us to avoid the steep inflation in steel tubulars and other manufactured
oilfield equipment.  Delays to fabrication eased in 2022 and we did not see some
of the delays that were globally experienced in 2021.  We have pre-ordered the requisite
pumps for the Tunisian artificial lift programme and those pumps are in hand in 
anticipation of our programme.  As we look forward, we see inflation beginning to
moderate however our cost control focus will continue unabated.

Commodity prices once again took the headlines in 2022 as Russia invaded Ukraine
and caused disruption to global energy markets.  Gas prices in Europe spiked and
the Company’s Romania trading subsidiary was able to take advantage of these heightened
gas prices.  Inevitably the higher commodity prices globally have allowed governments
to review fiscal terms and, in many countries, increased windfall taxes were the
result.  In Romania we have been exposed to windfall taxes since the inception of
production in Moftinu and no fiscal changes have affected us.  Fiscal terms in Tunisia
have remained stable and there has been no indications that these terms will change.

Operationally 2022 saw our business pursue our strategy in Romania of transitioning
from a wholly production business to searching for the next leg of growth. The strategy
included two near field exploration wells that were designed to add production to
the existing gas plant infrastructure.  Frustratingly these two wells did not discover
enough gas to assure commercial production and were therefore suspended.  The Canar-
1 well has now been converted to a water injection well and has provided savings
of approximately $60,000 per month in water disposal costs.  Whilst these two wells
were not commercially successful they did provide the encouragement that the Satu
Mare concession is highly gas prone and significant exploration opportunities remain
to be explored by the Company.  The results of the Canar-1 and Moftinu Nord-1 wells
showed that the seal on reservoirs is a risk that needs to be better understood.
To that end the Company engaged independent geological and geophysical consultants
to perform a block wide technical review to refine our understanding of which exploration
opportunities to pursue next.  The block remains highly prospective, and the estimated
size of the prospective resources offers a considerable economic prize for the business.

In Tunisia our strategy of increasing the recovery factor from our fields has continued.
Global delays to fabrication have meant that pump procurement has been delayed and
in June we were informed by the Compagnie de Tunisienne de Forage (“CTF”), Tunisia’s
state owned, monopoly, drilling company that the rig that we had contracted would
not be made available to us.  Having defaulted on this contract the CTF then attempted
to provide a replacement rig.  The rig suggested was not certified to the degree
required by Serinus and was therefore delayed until mid-December.  Given the state
owned, monopolistic nature of CTF the Company was deprived of normal contractual
remedies and was forced to wait until a suitable rig became available.  This has
meant the initial workovers associated with our pump programme were not completed
within 2022 as anticipated.  Technically the merits of this programme remain valid
and the Company is doggedly pursuing the completion of the workovers in SAB W-1 
and N-2 as soon as possible.

As we move into 2023 we remain confident that the technical strategy of the business
is sound.  Execution of the strategy has been slower than hoped but the considerable
upside, both through exploration in Satu Mare and enhanced production in Tunisia
remain excellent catalysts for growth in the business.

Yours sincerely,

Jeffery Auld, Chief Executive Officer

17 March 2023