**[Serinus Energy plc](https://www.directorstalkinterviews.com/company/serinus-energy-plc/senx.l)**(
[LON:SENX](https://www.directorstalkinterviews.com/company/serinus-energy-plc/senx.l),
WSE:SEN) has announced the release of its interim results for the six months ended
30 June 2021.

**HIGHLIGHTS**

FINANCIAL

·      Revenue for the six months ended 30 June 2021 was $15.9 million (30 June 
2020 – $13.3 million)

·      Funds from operations for the six months ended 30 June 2021 were $5.3 million(
30 June 2020 – $4.3 million)

·      EBITDA for the six months ended 30 June 2021 was $5.5 million (30 June 2020–
$5.0 million)

·      Gross profit for the six months ended 30 June 2021 was $2.1 million (30 June
2020 – gross loss $1.2 million)

·      Commodity prices remain strong, driven by post-COVID economic recovery.  
European gas prices are at record highs.  Net realised price of $43.83/boe, comprising:

o  Realised oil price – $58.06/bbl

o  Realised natural gas price – $6.59/Mcf

·      The Group’s operating netback for the six months ended 30 June 2021 was $
26.72/boe (30 June 2020 – $18.44/boe), comprising:

o  Romania operating netback – $28.73/boe (30 June 2020 – $21.34/boe)

o  Tunisia operating netback – $21.85/boe (30 June 2020 – $9.42/boe)

·      Capital expenditures of $5.9 million (30 June 2020 – $3.1 million), comprising:

o  Romania – $5.2 million

o  Tunisia – $0.7 million

·      Cash balance as at 30 June 2021 was $5.7 million

OPERATIONAL

·      On 15 July 2021 the Company announced that the Sancrai-1 exploration well
was a gas discovery.

·      The Sancrai-1 discovery is a step towards unlocking an estimated 181 MMboe
mean unrisked or 73 MMboe of mean risked recoverable resources on the Satu Mare 
Concession Area.

·      The Sancrai-1 exploration well commenced drilling on 29 June 2021.  The well
is the final commitment of the third exploration phase on the Satu Mare Concession
and has been drilled to 1,600 metres.

·      Compression on the Moftinu gas field continues to be advanced with the first
compression unit due to be delivered in August.  The compression project is designed
to stabilise the natural decline of the Moftinu gas field and allow for extended
production in the future.

·      Serinus has accelerated the re-processing of 2D seismic lines on the Satu
Mare Concession Area to enable the use of these legacy assets to design future drilling
and development options more accurately in the Sancrai and Madaras areas.

·      In Tunisia the Artificial Lift programme continues to be advanced with approvals
having been received from the field partner and the design and purchase of pumps
having commenced.

·      Whilst the pandemic has created a more difficult operating environment the
Company has conducted further workover operations in the Chouech area allowing for
a standardization of pumps and increased production.

·      Production for the period averaged 2,012 boe/d, comprising:

o  Romania – 1,442 boe/d

o  Tunisia – 570 boe/d

·      Serinus has continued to operate safely and effectively through the COVID-
19 pandemic, with the successful implementation of operational and monitoring protocols
to ensure the health and safety of our employees.

**OPERATIONAL UPDATE AND OUTLOOK**

Serinus Energy plc and its subsidiaries is an oil and gas exploration, appraisal
and development company.  The Group is the operator of all its assets and has operations
in two business units: Romania and Tunisia.

ROMANIA

The Company currently holds one large concession area (approximately 3,000km^(2)),
Satu Mare, located in a highly sought-after hydrocarbon province.  The Moftinu Gas
Project is what the Group hopes to be the first of many shallow gas developments.
The concession is extensively covered by legacy 2D seismic and the Group considers
the concession to have multiple sizable prospects available for further exploration.

During the six months ended 30 June 2021, the Company successfully drilled, completed
and initiated production from the M-1008 well, which was drilled to a total depth
of 1,000 metres and flowed at 4.0 MMscf/d (approximately 667 boe/d). 

Serinus also commenced drilling of the Sancrai-1 exploration well on 29 June 2021.
On 15 July 2021 the Company announced that the Sancrai-1 well was a gas discovery
and that drilling had been completed at a total planned drilling depth of 1,600 
metres, five days ahead of schedule and under-budget.  Continuous formation gas 
shows were recorded over 20 metres of gross pay over four sand intervals from the
measured depths of 855 metres to 875 metres.  At this drilling interval the measured
total gas ranged from 5.5% to 11.1% with an estimated average porosity of between
23% and 27%.  Open-hole petrophysical analysis undertaken during the drilling operations
has further confirmed this gas-bearing Pliocene sand zone.  The Company perforated
the well in three zones to test the Pliocene sand zone prior to completing the well
and subsequently announced that the testing programme was unable to record the flow
of gas in the selected zones.  The Sancrai-1 exploration well will be suspended 
pending further technical studies to better understand the Sancrai structure and
evaluate the options available, given the high total gas readings during drilling.
The well is the final commitment of the third exploration phase on the Satu Mare
Concession and lies approximately 7.8 km to the south of the Moftinu Gas Development
project.   

The project to introduce compression onto the first of two wells on the Moftinu 
gas field is progressing on-schedule and is expected to be undertaken in conjunction
with a planned maintenance shutdown in the third quarter, with the second compressor
to be added early next year.  The project is intended to stabilise the natural decline
of the Moftinu gas field and allow for extended production in the future.

Serinus has accelerated the re-processing of 2D seismic lines on the Satu Mare Concession
Area to enable the use of these legacy assets to design future drilling and development
options more accurately in the Sancrai and Madaras area.

The Company has a deemed 100% working interest in the concession as its partner 
has defaulted on its obligations under the Joint Operating Agreement. The Company
has filed a Request for Arbitration with the Secretariat of the International Court
of Arbitration of the International Chamber of Commerce seeking a declaration affirming
the Company’s rightful claim of ownership of its defaulted partners’ 40% participating
interest and to compel transfer of that interest to the Company.

TUNISIA

The Company currently holds five concession areas within Tunisia.  Of the five concession
areas the Company is currently focused on, three of those areas have discovered 
oil and gas reserves and are currently producing; Sabria, Chouech Es Saida, and 
Ech Chouech.  The largest asset is the Sabria field, which is a large oilfield play
that has been historically under-developed.  Serinus considers this to be an excellent
asset for remedial work to increase production and, in time with proper reservoir
studies, to conduct further development operations.

The first Artificial Lift programme, which will be implemented on the W-1 well in
the Sabria field, has received approval from the field partner and the design, selection
and purchase of pumps has commenced.  The project is expected to continue throughout
the second half of the year.

Despite a more difficult operating environment in Tunisia as a result of the impact
of COVID-19, the Company has conducted further workover operations in the Chouech
area to replace and standardise pumps in order to increase production.

COVID-19

The Company’s top priority remains the health, safety and wellbeing of all our staff.
The Group continues to monitor each jurisdiction closely and updates its working
practices as local situations and rules evolve, following government recommendations
such as enhanced sanitation of work sites, social distancing and wearing of masks.
Our offices in London, Calgary and Bucharest are all currently open and working 
in compliance with local recommendations, however in Tunisia a recent sharp increase
in the infection rate and more limited vaccination coverage has resulted in a return
to more stringent measures and routines to ensure a safe working environment for
staff.  Existing operations have remained in production. The Company has experienced
minor timing delays associated with the movement of staff and services; this has
not affected our operational plans.

FINANCIAL REVIEW

LIQUIDITY, DEBT AND CAPITAL RESOURCES

During the six months ended 30 June 2021, the Company spent a total of $5.9 million(
2020 – $3.1 million) on capital expenditures.  In Romania the Group spent $5.2 million(
2020 – $2.3 million) on the drilling, completion and tie-in of the M-1008 well, 
as well as some drilling costs on the Sancrai-1 well.  In Tunisia, the Company spent
$0.7 million (2020 – $0.8 million) completing workovers on various wells to enhance
production. 

The Company’s funds from operations for the six months ended 30 June 2021 were $
5.3 million (2020 – $4.3 million).  Considering the movement in working capital,
the cash flow generated from operating activities in 2021 was $5.9 million (2020–
$3.1 million).  The Company is now in a strong position to expand and continue growing
production within our existing resource base.  The Company is debt-free and has 
adequate resources available to deploy capital into both operating segments to deliver
growth and shareholder returns.

| (US$ 000s)
**Working Capital** | 30 June2021 | 31 December 2020 | 
| Current assets | 15,718 | 16,037 | 
| Current liabilities | (23,273) | (22,236) | 
| Working Capital deficit | (7,555) | (6,199) |

The working capital deficit at 30 June 2021 was $7.6 million (31 December 2020 –
$6.2 million).  The increase in working capital deficit is primarily a result of
capital expenditures in the period offset by funds from operations.

Current assets as at 30 June 2021 were $15.7 million (31 December 2020 – $16.0 million),
a decrease of $0.3 million. Current assets consist of:

·      Cash and cash equivalents of $5.7 million (31 December 2020 – $6.0 million).

·      Restricted cash of $1.2 million (31 December 2020 – $1.2 million).

·      Trade and other receivables of $8.8 million (31 December 2020 – $8.9 million).

Current liabilities as at 30 June 2021 were $23.3 million (31 December 2020 – $22.2
million), an increase of $1.0 million. Current liabilities consist of:

·      Accounts payable of $14.7 million (31 December 2020 – $14.3 million) which
includes $6.0 million (31 December 2020 – $6.0 million) related to historic work
commitments in Brunei.

·      Decommissioning provision of $7.5 million (31 December 2020 – $7.1 million).

o  Brunei – $1.8 million (31 December 2020 – $1.8 million).

o  Canada – $1.1 million (31 December 2020 – $1.0 million) which are offset by restricted
cash in the amount of $1.2 million (31 December 2020 – $1.2 million) in current 
assets.

o  Romania – $0.7 million (31 December 2020 – $0.6 million).

o  Tunisia – $3.9 million (31 December 2020 – $3.7 million).

·      Income taxes payable of $0.9 million (31 December 2020 – $0.6 million).

·      Current portion of lease obligations of $0.2 million (31 December 2020 – 
$0.2 million).

**NON-CURRENT ASSETS**

Property, plant and equipment (“PPE”) decreased to $75.6 million (31 December 2020–
$77.8 million), primarily due to depletion expense in the period of $5.9 million,
partially offset by capital expenditures in PPE of $4.0 million.  Exploration and
evaluation assets (“E&E”) increased to $1.9 million (31 December 2020 – $0.01 million),
primarily due to expenditures incurred on the Sancrai-1 well.

Share on: