**Savannah Resources plc** (LON:SAV), announced today that it has completed drilling
at the Ravene deposit in Mozambique (Figures 1-3 – [See PDF](https://www.directorstalkinterviews.com/wp-content/uploads/2017/02/6592V_-2017-1-31.pdf)),
which forms part of the Mutamba (mineral sands) Project, being developed by Savannah
and Rio Tinto as part of a consortium agreement (the ‘Consortium’).

HIGHLIGHTS:

· Completed a total of 107 drill holes for a total of 2,914m at the Ravene deposit
over a 21km strike of potentially mineralised sand dunes.
 · Targeted high-grade
zones where past drilling has returned results of up to 14.7% Total Heavy Minerals(‘
THM’). · Drilling was carried out on a 1,000m x 500m grid to infill existing drilling
carried out by Rio Tinto previously. · Results will be used to estimate an initial
inferred resource over the Ravene prospect to potentially increase the Mutamba Project’s
recently defined initial Indicated and Inferred Mineral Resource Estimate of 3.5
billion tonnes at 3.8% THM. · All samples from the drilling are currently being 
analysed for their heavy mineral concentration. · The analysis is expected to be
completed in February with results available thereafter. · The results of the resource
estimation will be fast tracked and included into the commissioned scoping study,
which is currently underway.

> **Savannah Resources Plc CEO, David Archer said:** “The completion of this fast-
> paced resource definition drilling programme highlights the capabilities of Savannah’s
> in-country operations team. The programme was planned to more precisely define
> the high-grade zones of THM at the Ravene deposit, which we believe could increase
> the current global Indicated and Inferred Mineral Resource inventory of 3.5 billion
> tonnes at 3.8% THM at the Mutamba Project North. We look forward to receiving 
> the drill results in the coming weeks, which we intend to include in our scoping
> study for the project, which is underway and continues to progress well.”

Introduction

The Ravene deposit is part of the Mutamba Project and is situated to the northeast
of the Dongane deposit as outlined by previous drilling, and is located on the same
system of sand dunes that host the high concentrations of heavy minerals at Dongane.
The Ravene deposit is relatively under-evaluated and indications suggest that it
has the potential to host significant zones of high-grade heavy minerals, with previous
drilling by Rio Tinto highlighting specific zones of significant heavy minerals 
with values up to 14.7% THM, carried out on a 1,000m x 500m grid. This 1km spacing
of the drill lines is considered too wide to provide enough confidence for an inferred
resource estimation.

The aim of the drilling at Ravene was to infill the original grid on a 500m line
spacing to provide drilling information at a concentration of 500m x 500m. The results
from this programme will be used to as the basis for an anticipated maiden Mineral
Resource Estimate at Ravene, which will feed into the scoping study that is currently
underway.

The Mutamba Project is subject to a consortium agreement between Savannah and Rio
Tinto and is operated by Savannah. The Mutamba Project includes the Mutamba Project
North (consisting of Jangamo, Dongane and Ravene deposits) and the Chilubane deposit
is located 180km to the southwest of the Mutamba Project North. The current resource
statement includes only the Jangamo and Dongane deposits (Figure 1 – See PDF).

Figure 1. Mutamba Project Location Map – [See PDF](https://www.directorstalkinterviews.com/wp-content/uploads/2017/02/6592V_-2017-1-31.pdf)

Figure 2. Mutamba North Project Location Map – [See PDF](https://www.directorstalkinterviews.com/wp-content/uploads/2017/02/6592V_-2017-1-31.pdf)

Ravene Drill Programme

The mineralisation at Ravene is found within an extensive set of dunes that NE-SW
and are found along the entire extent of the Ravene tenement arm. The drilling at
Ravene (Figure 3 – See PDF) was carried out over a 21km extent of these mineralised
dunes, and is targeting specific zones of high-grade mineralisation to add to the
significant resources already outlined at Dongane and Jangamo. Previous drilling
intersected several zones with high concentrations of heavy minerals with grades
of up to 14.7% THM. Other zones of greater than 10% THM were seen in 14 other drill
holes.

Drilling at Ravene started during the middle of December 2016, targeting the mineralised
dunes outlined by the previous drilling. The area drilled is split into two zones,
consisting of a northern and southern zone, separated by a large blow-out of recent
dune cover. The programme was completed in January 2017, with 107 holes drilled 
for a total of 2,914m. Samples from the drilling have been submitted for analysis
to determine the concentration of heavy minerals in each sample interval. All of
the samples are currently in the laboratory and it is expected that the final results
will be available for the resource estimation in February 2017.

Figure 3. Map of the Ravene prospect area with Savannah’s completed drilling (blue)
and existing drilling (black) – [See PDF](https://www.directorstalkinterviews.com/wp-content/uploads/2017/02/6592V_-2017-1-31.pdf)