Chairman and Chief Executive Officer Peter Levine caught up with DirectorsTalk for
an exclusive interview to discuss their latest drilling update and what we can expect
in terms of news flow in the coming weeks and months.

**Q1: ****Now you’ve announced a testing success at Las Bases field in Argentina
this morning. Peter, how does this impact on President Energy?**

**A1**: Well, we need to look at the history first. We drilled and we announced 
very recently, in October, Las Bases 1001, it’s a new development gas well and we
achieved a good result, we announced that on the 26th of October which achieved 
a good result, both from the electric logs and testing.

Now those logs showed several pay zones, one of which was a cretaceous formation
called the Centenario which was a shallow interval i.e. less than 1000 meters. Now,
in Las Bases 1001 because our logs showed we had several intervals, as is normal
we tested from the bottom up. Now, we happen to have a very good result from the
lowest interval and therefore we decided to produce from that zone and leave the
testing and production of a higher intervals until later. What we then did with 
the logs from the recently drilled well of Las Bases 1001, we then read across and
considered the logs of the well drilled by our predecessors Chevron, called Las 
Bases 1, which they drilled in 1999.

It identified the same scenario, but it was present but they never produced from
that, they produced from a lowest zone, a deeper zone, they prolifically produced
gas but then it watered out. So, they shut in the well and that’s where it lay for
several years until we decided to take a chance card from the monopoly pack and 
re-enter the well and perforate it, which we’ve now done, and test that Centenario
section which had been, up till the time we tested it, completely undrained.

The results of such test is the result we’ve just announced and whilst it’s perhaps
a tighter formation, even allowing for this, we tested a good commercial flow of
gas as indicated in recent announcement today. It will be put on production by the
year end and so Las Bases 1 will once again, after many years, be back onto production,
albeit from a different level.

Now, as we can’t see any water nearby, it will be certainly a candidate for artificial
stimulation which we expect would further significantly enhance the flow rigs. However,
this is a test of an old well, it’s an intervention, it’s a well which hasn’t been
produced, I’s a workover.

What is the importance of this? Well, the importance of this test is the read across
because at this interval is widely present in the Las Bases field, it’s shallow,
can therefore can be drilled quickly, for example, in 7-10 days, economically will
cost us less to drill and we have all our infrastructure to plug in the new found
production. So, it will have a significant impact.

Furthermore, there are no reserves currently booked for this interval so most certainly
we will see in this year’s results report, which is due out in February, with an
effective date of 31 December, a positive addition of both proved and probable reserves.

So, what does this demonstrate? This demonstrates the running room and the potential
in our existing fields and that’s very important. The two wells that we’ve drilled,
both successful, one, an exploration well which is EVN -x which we’re putting into
production in the next few days and the other one, Las Bases 1001 combined with 
this test has demonstrated the fact that we have ample scope here for low cost, 
good margin production, onshore from our existing fields.

Wrap that all in one package and you can see that the test result have slightly 
more importance than a normal test result for perforating an old shutting well, 
hence the announcement that we just made.

**Q2: So, what’s next and what news can we expect coming out over the next few weeks
and months?**

**A2**: Well, I’ve alluded to the fact that we are starting to produce from the 
two wells that we just drilled which is Las Bases 1001 and EVN-x1, the latter being
an oil well and the former being a gas. So, the next piece of news that we see will
be to look at the initial production figures from those wells, we’ve got test production
figures which we announced but not when we put these in line in production.

We anticipate being able to say something in the relatively near future and then
we would be looking at announcing our plans for the forthcoming year a bit later
on towards the end of this year.

So, in important terms, I think the next most important announcement will be showing
the initial online production, taking into account the gas wells, taking into account
the commissioning of the compressor, effectively bringing you on stream the Estancia
Vieja well and the Las Bases well. Also, of course, the increase in oil, we hope,
from EVN-x1 well, which as I said is, as we speak now being put into production.

In a nutshell, that’s where President Energy is at.