# Powerhouse Energy Group PLC Q&A with CEO Keith Allaun (LON:PHE)

- Link: https://www.directorstalkinterviews.com/powerhouse-energy-group-plc-qa-ceo-keith-allaun-lonphe/412740967
- Published: 2017-11-28T13:09:55+00:00
- Author: Amilia Stone

**Powerhouse Energy Group Plc **(LON:PHE) Chief Executive Officer Keith Allaun caught
up with DirectorsTalk for an exclusive interview to discuss what’s happened over
the last month, the importance in reaching their first major milestone, the growing
awareness in the sector and what’s next for the company

 

**Q1: Now Keith, when we last spoke, at the end of October, it was regarding the
open days at the Thornton Science Park in Chester, can you tell us what’s been happening
since then?**

**A1**: Well, quite a bit, to be honest. One of the things that had happened at 
the beginning of October of course was the appointment of our new Chairman of the
Board, Cameron Davies, who has joined us from Alkane Energy where he had been Founder,
Chairman, CEO and built the company into a very successful publicly trading company
and sold it on. We’re very fortunate to have Cameron join our Board and help provide
us guidance in this next phase of development of the company.

So, what’s been going on since the open days is open days were, in our minds, a 
tremendous success. We had over 100 visitors come through the Thornton Science Park
facility, take a look at the demonstrator G3 unit, see the operation in operation,
get a sense of what was going on there, recognise that this production demonstration
machine was doing everything we had originally hoped we’d do. This was the conversion
of waste into a clean synthesis gas that we’ve subsequently determined can be turned
into 99.999% road-fuel quality hydrogen.

So, since October, we’ve continued our testing programme, we’ve continued our demonstration
and development programme and we’ve continued taking the data required through all
of those programmes and feeding that into the early phases of our commercial design
engineering programme. Recently, just last week, we announced the achievement of
the first substantive engineering milestone which was the completion of the pre-
Front End Engineering and Design (pre-FEED) component of the commercial engineering
project.

I think that a lot of people don’t understand the vocabulary that’s associated with
engineering, you have things like feasibility studies that aren’t even slightly 
about the actual feasibility of the project, what a feasibility study does is it
allows you to determine what is feasible in the delivery of a project, not whether
or not a project is feasible. The front end, when you talk about the front end in
engineering and design, what you’re doing is you’re taking about 60% or 70% of the
work off the table by getting all of the data together and getting all of the information
aggregated that is necessary to determine what are the components that you then 
need to knit together to create your final system.

So, we’ve designed, over the past number of years, the Distributed Modular Gasification
System utilising our ultra-high temperature gasification unit, the G3, and we now
based on our pre-FEED completion are absolutely confident in both the design specs
and in our claims for its abilities to deliver really pioneering waste to hydrogen
solutions in the UK and elsewhere throughout the world.

 

**Q2: The announcement that you made last week, what does it mean for Powerhouse
Energy Group, why is it such an important milestone?**

**A2**: Again, I think that there’s a couple of reasons why it’s an important milestone.
One is it shows we can actually engage in legitimate, substantive, robust engineering.
This is no longer whipping something up on the back of a napkin, this is a significant
engaged engineering project run by commercial engineers who are experts in the energy
waste industry, are experts in feedstock management and are experts in process design.
They’re bringing the knowledge that we’ve acquired through the PHE programme over
the past dozen years and they’re bringing that into a focal point which is this 
pre-FEED design process which gives us really the target at which we are now aiming.

So, we’ve got, as I’ve said, the pre-FEED design really takes about 70% of the work
off the table and now the rest of it is, as I like to say, it’s just an engineering
challenge. The rest of it is how do you integrate these various components from 
the feedstock loading process through the gasification, through the gas clean-up,
through the generation of electricity, through the acquisition and separation of
hydrogen through the PSA, through the compression of hydrogen in synthesis gas for
the delivery of various components, whether that’s distribute electricity or distribute
hydrogen.

So, being able to say that we’ve stuck this flag in the ground and achieved this
is truly the most advanced that the company has ever been in the history of Powerhouse
Energy Group. So, we’ve actually achieved this, what is considered a legitimate 
engineering accomplishment which allows us to now move very aggressively into the
Front-End Engineering and Design component. This is, again, the acquisition of various
components that we are going to be integrating into the Distributed Modular Gasification,
into the DMG system, and ensuring that those work together as advertised and allowing
us to deliver on time, on budget in the timeframes that we had envisioned and that
we had previously announced.

So, the import of this announcement in many ways can’t be underestimated, it’s a
significant achievement by the engineers, by the commercial team in acquiring all
of the external data to ensure that there is indeed a market. If anything has happened
over the last year that has just been incredibly heartening, it is this tremendous
growth of awareness of the burgeoning hydrogen economy and the fact that hydrogen
is being touted as a significant contributor to the world’ greenhouse gas problems.

So, the fact that major transportation companies, like Toyota, Hyundai, BMW, are
all making hundreds of million-dollar investments in their transportation infrastructure.
The fact that they are making huge investments in the hydrogen fuel-cell technology,
all of which requires distributed hydrogen which we can uniquely provide by virtue
of our Distributed Modular Gasification processes, it has been a very interesting
confluence of events, it’s like we are exactly at the right place at the right time.
Recently, Transportation for London (TFL) announced the acquisition of a number 
of hydrogen fuel-cell driven buses, those buses are all going to need distributed
hydrogen to operate and they need hydrogen to operate effectively at the cost of
diesel and current mechanisms by which hydrogen is produced are substantially more
expensive than standard diesel production.

Our DMG process allows us to produce hydrogen at a cost that is equivalent or lower
than the existing cost of diesel, making this not only a viable process environmentally
of course but making it a viable process economically. You can’t underestimate the
value of having achieved this status of having completed the pre-FEED component 
of this process.

 

**Q3: Just coming back to the point of awareness, we saw an interesting letter in
the Sunday Telegraph regarding supermarket wrappings, landfill and the hauling of
trees, some 3,000 miles across the Atlantic. Now, I know you’ve seen this letter,
what are your thoughts on it?**

**A3**: Really to my last point there, awareness is growing. People are cognising
to the fact that only 9% of the plastic in the world is recycled, I was just watching
on the BBC last night, Blue Planet 2 and they were talking about the continued degradation
of our ocean from plastics and the fact that those plastics are being reduced smaller
and smaller into micro-plastics that are being ingested in the oceans food chain
which is then coming back into the human food chain and we do not yet know what 
these significant health consequences are going to be of that.

So, when I see somebody write a letter to the Sunday Telegraph touting the value
of converting these waste plastics into a high-calorific value fuel from which we
can extract the energy value and we can return it as hydrogen to the environment.
That hydrogen, when used as a fuel, becomes a carbon-negative fuel, it eliminates
plastic from the waste stream, it eliminates the use of fossil fuels, it reduces
co2 emissions by many fold, the current method in which hydrogen is produced is 
generating something in the neighbourhood of 12-16 times more co2 than it produces
hydrogen, our process generates almost no co2 in the production of hydrogen.

So, DMG has an extremely bright future and we’re now at the point where we’re at
the pointy end of the stick, one of the things that we’ve glossed over from last
week’s announcement is the fact that we’ve been introduced to five potential sites
by Peel Environmental as initial sites in which we’d want to site our first commercial
DMG facility. We’ve reduced that down to two and it’s likely in the next few weeks
we’re going to be signing the heads of terms to select one of those sites for our
first commercial offering.

The importance of doing that is it gives us the opportunity to begin the site civil
engineering, the surveys, the evaluations, completing the planning permitting processes
etc. that are necessary for us to move to the final stages. All of this stuff is
happening in the timeframe and with a wind at our back, if you will, as the hydrogen
economy is gaining visibility.

So, the letter to The Telegraph simply reinforces the fact that the average consumer
is starting to recognise that there is value that needs to be extracted from these
waste streams, there is a component of every waste stream that is not recyclable,
it’s not reusable so we cannot allow it to go to incineration and we cannot allow
it to go to landfills. It needs to go through the DMG process where we’re extracting
the energy value of that as hydrogen which can then be used as a carbon-negative
fuel to road transportation.

 

**Q4: It really is a truly amazing technology! What should potential investors be
looking out for going into 2018? What’s next for Powerhouse Energy Group Plc?**

**A4**: Really, it’s a continuation of this process that we launched at the beginning
of this year which is moving aggressively towards commercialisation. People don’t
realise that the first of its kind of anything is an arduous and uphill battle, 
that said we’ve got a tremendous team that has overcome significant obstacles, we’ve
overcome technical challenges and we’ve overcome logistical challenges.

Now, as we look towards the signing of the lease for our first commercial facility,
what investors can be looking at is that we are indeed going to be breaking ground.
We are indeed going to be looking at our first commercial facility being operational
in the year 2018 and that everything that we’ve been saying about the UK pioneer
of waste to hydrogen technology and in fact, to our knowledge, the pioneer of waste
to hydrogen technology worldwide, certainly in terms of a distributed modular mechanism
by which our DMG can operate in a small footprint.

We can bring the solution to where the problem exists, we can start intervening 
in difficult, hazardous challenging waste streams that have heretofore had no solution
and we have the solution. So, I believe that investors will see the commercial progress
that we’re going to be making, we’re going to be publishing a set of goals and milestones
that investors are going to be able to track and hold us accountable for tracking
our process, and we’re going to be seeing the fact that the hydrogen economy is 
going to gain even more visibility and there’s going to be more worldwide investment
in the hydrogen economy and a number of these opportunities in which we’ve been 
working and competing.

So, in any case, I think it’s an exciting time for investors to be involved.

Share on:
