# Oriole Resources plc Further Mineralisation at MB01-S Gold Deposit

- Link: https://www.directorstalkinterviews.com/oriole-resources-plc-further-mineralisation-at-mb01-s-gold-deposit/4121255237
- Published: 2026-07-01T07:31:04+01:00
- Author: Ethan Davis

**[Oriole Resources](https://www.directorstalkinterviews.com/company/oriole-resources-plc/orr.l)
PLC** (LON:ORR), the AIM quoted gold exploration and development company focused
on Central and West Africa, has announced further results from the recently completed
step-out diamond drilling programme (the “Programme” or “Phase 3”) at the MB01-S
deposit at its 50% owned Mbe orogenic gold project (“Mbe” or the “Project”) in Cameroon.
The total JORC Inferred Mineral Resource Estimate (“MRE”) at Mbe currently stands
at 1.23 million oz contained gold (“Au”) across both the MB01-S and MB01-N deposits.
The results reported today underpin the potential for an increase in the resource
at MB01-S when the updated MRE is published later in Q3.

### Highlights

·    Results for holes MBDD045 to MBDD047 have returned 34 mineralised gold intersections,
including:

o  MBDD045

▪    6.00m at 2.41g/t Au from 84.60m depth, including 1.00m at 13.00g/t Au

▪    4.00m at 2.73g/t Au from 32.40m depth, including 1.00m at 8.42g/t Au

▪    4.00m at 1.68g/t Au from 63.50m depth, including 1.00m at 2.73g/t Au and 1.00m
at 2.65g/t Au

▪    4.00m at 0.84g/t Au from 76.60m depth, including 1.00m at 2.80g/t Au

▪    6.00m at 0.64g/t Au from 136.80m depth, including 1.00m at 1.78g/t Au

o  MBDD047

▪    3.00m at 4.16g/t Au from 123.30m depth, including 1.00m at 12.00g/t Au

▪    4.00m at 2.43g/t Au from 52.30m depth, including 1.00m at 6.65g/t Au

▪    1.00m at 5.37g/t Au from 216.50m depth

o  MBDD046

▪    7.30m at 0.48g/t Au from 23.10m depth

·    Hole MBDD045 was drilled into the westernmost soil anomaly at MB01-S and has
underpinned the depth extension of mineralisation over that area.    

·    Mineralisation in MBDD047 correlates well with key mineralised intervals previously
reported for holes MBDD024 and MBDD044, with that north-west trending zone extending
over a 300m strike length.

·    Results for the two final holes, MBDD048 and MBDD049, are awaited.  Once received,
an updated MRE for MB01-S will be prepared for publication in early Q3-2026.

Chief Executive Officer of Oriole Resources, Martin Rosser, said: “The latest batch
of step-out drilling results for MB01-S have returned yet more encouraging mineralised
intersections which provide support for a westward and southward extension of the
deposit.  We hope that this should lead to an expansion of the current MRE for MB01-
S when it is reported later in Q3.  We eagerly await the results from the remaining
two holes in the Programme so that the independent geological consultant can complete
the remodelling work.”

![Oriole Resources MB01-S ](https://www.directorstalkinterviews.com/wp-content/uploads/
2026/07/oriole1.jpg "Oriole Resources plc Further Mineralisation at MB01-S Gold 
Deposit (ORR)")

Figure 1. Plan view of MB01-S showing the step-out programme drill hole collar locations,
selected best results from MBDD045 to MBDD047, previously reported best intersections
from MBDD040 to MBDD044, drill collars from Phase 1 drilling and gold mineralised
wireframes for the current 870koz Au MRE within a US$3,200/oz pit shell.

### Further Details

Last month, a step-out diamond drilling programme at the MB01-S deposit was completed
for 2,476.80m in 10 holes (see announcement dated 08 June 2026).  It was designed
to expand the existing 870,000oz contained gold JORC MRE at MB01-S, by testing the
potential extension of the mineralised system.  All holes were drilled towards the
west (at an azimuth of 270˚) and at an inclination of -50˚ degrees, therefore in
the same orientation as the majority of holes in the Phase 1 drilling programme (
see announcement dated 2 September 2025).

The Company today reports results for holes MBDD045 to MBDD047, which targeted the
western and southwestern extension of MB01-S.  MBDD045 was completed on existing
fence line N872382 (approximately 230m west of the previous drilling, and 90m southwest
of Phase 1 hole MBDD024).  MBDD046 and MBDD047 were drilled on a new fence line,
N872306, the southernmost fence line to date.

Table 1. Calculated intersections from Phase 3 holes MBDD045 and MBDD047, using 
a 0.20g/t Au lower cut-off grade.  Results greater than 1.00g/t Au are in bold and‘
including’ intervals are in bold italics.

| Hole ID | From (m) | To (m) | Au grade (g/t) | Intersection* | 
| MBDD045 | 26.20 | 28.20 | 0.37 | 2.00m at 0.37g/t Au | 
| **and** | **32.40** | **36.40** | **2.73** | **4.00m at 2.73g/t Au** | 
| **_including_** | **_32.40_** | **_33.40_** | **_8.42_** | **_1.00m at 8.42g/t Au_** | 
| **and** | **57.30** | **58.30** | **1.56** | **1.00m at 1.56g/t Au** | 
| and | 59.50 | 60.50 | 0.40 | 1.00m at 0.40g/t Au | 
| **and** | **63.50** | **67.50** | **1.68** | **4.00m at 1.68g/t Au** | 
| **_including_** | **_64.50_** | **_65.50_** | **_2.73_** | **_1.00m at 2.73g/t Au_** | 
| **_including_** | **_66.50_** | **_67.50_** | **_2.65_** | **_1.00m at 2.65g/t Au_** | 
| and | 76.60 | 80.60 | 0.84 | 4.00m at 0.84g/t Au | 
| **_including_** | **_76.60_** | **_77.60_** | **_2.80_** | **_1.00m at 2.80g/t Au_** | 
| **and** | **84.60** | **90.60** | **2.41** | **6.00m at 2.41g/t Au** | 
| **_including_** | **_87.60_** | **_88.60_** | **_13.00_** | **_1.00m at 13.00g/t Au_** | 
| and | 100.50 | 101.50 | 0.23 | 1.00m at 0.23g/t Au | 
| and | 103.50 | 114.50 | 0.36 | 11.00m at 0.36g/t Au | 
| and | 126.50 | 127.50 | 0.59 | 1.00m at 0.59g/t Au | 
| and | 136.80 | 142.80 | 0.64 | 6.00m at 0.64g/t Au | 
| **_including_** | **_137.80_** | **_138.80_** | **_1.78_** | **_1.00m at 1.78g/t Au_** | 
| and | 146.00 | 149.20 | 0.28 | 3.20m at 0.28g/t Au | 
| and | 152.30 | 153.30 | 0.27 | 1.00m at 0.27g/t Au | 
| **and** | **186.80** | **187.80** | **1.33** | **1.00m at 1.33g/t Au** | 
| and | 190.80 | 191.80 | 0.37 | 1.00m at 0.37g/t Au | 
| and | 193.80 | 195.80 | 0.28 | 2.00m at 0.28g/t Au | 
| MBDD046 | 23.10 | 30.40 | 0.48 | 7.30m at 0.48g/t Au | 
| and | 77.70 | 78.70 | 0.29 | 1.00m at 0.29g/t Au | 
| MBDD047 | 13.40 | 17.90 | 0.26 | 4.50m at 0.26g/t Au | 
| and | 20.00 | 21.10 | 0.30 | 1.10m at 0.30g/t Au | 
| **and** | **24.40** | **25.50** | **1.33** | **1.10m at 1.33g/t Au** | 
| **and** | **28.90** | **30.00** | **1.10** | **1.10m at 1.10g/t Au** | 
| and | 48.30 | 49.30 | 0.37 | 1.00m at 0.37g/t Au | 
| **and** | **52.30** | **56.30** | **2.43** | **4.00m at 2.43g/t Au** | 
| **_including_** | **_53.30_** | **_54.30_** | **_6.65_** | **_1.00m at 6.65g/t Au_** | 
| and | 61.50 | 62.60 | 0.54 | 1.10m at 0.54g/t Au | 
| and | 70.30 | 71.40 | 0.62 | 1.10m at 0.62g/t Au | 
| **and** | **123.30** | **126.30** | **4.16** | **3.00m at 4.16g/t Au** | 
| **_including_** | **_125.30_** | **_126.30_** | **_12.00_** | **_1.00m at 12.00g/t Au_** | 
| and | 158.50 | 159.50 | 0.41 | 1.00m at 0.41g/t Au | 
| and | 166.90 | 171.30 | 0.36 | 4.40m at 0.36g/t Au | 
| and | 184.50 | 185.50 | 0.47 | 1.00m at 0.47g/t Au | 
| and | 206.00 | 208.20 | 0.22 | 2.20m at 0.22g/t Au | 
| and | 214.10 | 215.30 | 0.20 | 1.20m at 0.20g/t Au | 
| **and** | **216.50** | **217.50** | **5.37** | **1.00m at 5.37g/t Au** | 
| and | 221.00 | 223.30 | 0.39 | 2.30m at 0.39g/t Au | 
| *Intervals greater than 1.00m, calculated using a 0.20g/t Au lower cut-off grade and no more than 5.00m consecutive dilution or 35% total internal dilution.  True widths are not currently known. |

All holes returned gold-mineralised intersections, related to sulphide-telluride
veinlets and breccias, with the best grades being from MBDD045 and MBDD047.  Both
holes continue to demonstrate narrow higher gold grade zones within wider envelopes
of lower grade mineralisation, for example 6.00m at 2.41g/t Au, including 1.00m 
at 13.00g/t Au (MBDD045), and 3.00m at 4.16g/t Au, including 1.00m at 12.00g/t Au(
MBDD047).  They are expected to extend the limits of the current MRE to the west
and south respectively.

![Oriole Resources](https://www.directorstalkinterviews.com/wp-content/uploads/2026/
07/oriole2.jpg "Oriole Resources plc Further Mineralisation at MB01-S Gold Deposit(
ORR)")

Figure 2. Core box photograph showing the higher grading portions of the 6.00m at
2.41g/t Au intersection from hole MBDD045, and the 3.00m at 4.16g/t Au intersection
from hole MBDD047.  The red lines on the core mark the start and finish of the respective
mineralised intervals.

![Oriole Rescources](https://www.directorstalkinterviews.com/wp-content/uploads/
2026/07/oriole3.jpg "Oriole Resources plc Further Mineralisation at MB01-S Gold 
Deposit (ORR)")

Figure 3. Simplified cross section of fence line N872382, with newly reported results
from MBDD045.  Previously reported best results from holes MBDD021 to MBDD023 and
trench line MBT009 are also presented.  MBT009 is located approximately 50m south
of the fence line.

![Oriole Resources](https://www.directorstalkinterviews.com/wp-content/uploads/2026/
07/oriole4.jpg "Oriole Resources plc Further Mineralisation at MB01-S Gold Deposit(
ORR)")

Figure 4. Simplified cross section of fence line N872306, with newly reported results
for holes MBDD046 and MBDD047.  Previously reported best results from trench line
MBT009, located approximately 10m north of the fence line.  Final interpretation
of this fence line is subject to receipt of the results from holes MBDD048 and MBDD049.

MBDD045 was drilled through a zone of mineralisation that previously only had trenching
data and the results have therefore underpinned the depth extension of mineralisation
over that area.   

Mineralisation in MBDD046, albeit limited, potentially represents the along-strike
extension of mineralisation previously reported in MBDD023 (100m to the northwest;
see announcement dated 22 September 2025).  Likewise, MBDD047 likely represents 
the along-strike extension of mineralisation in MBDD024 (which reported 29.80m at
0.79g/t Au from 116.90m, including 13.70m at 1.36g/t Au; see announcement dated 
22 September 2025), located 100m to the northwest, and indeed MBDD044, located 200m
to the northwest, which earlier this month returned 27.20m at 1.69g/t Au from 96.00m
depth, including 6.00m at 5.81g/t Au, 1.00m at 2.19g/t Au and 1.00m at 2.09g/t Au(
see announcement dated 8 June 2026). 

As previously announced, the MRE wireframes will be rotated from a N-S to NNW-SSE
orientation (see announcement dated 08 June 2026), as a result of more structural
data since the maiden MRE.  In this context, the northwest trending zone linking
holes MBDD044, MBDD024 and MBDD047 extends over an approximate 300m strike length.

Results for the remaining two holes in the Programme are anticipated early this 
month.  Thereafter, Oriole will engage its independent consultant to prepare an 
updated JORC MRE for the deposit, which currently stands at 870koz contained Au 
and remains open in all directions, with the publication of the updated MRE expected
in early Q3-2026.  Any increase to this MRE will also increase the current 1.23Moz
total resource base at Mbe.

Further information can be found in the Mbe JORC Table 1 disclosure on the following
page of the Company’s website: https://orioleresources.com/projects/mbe/ 

Competent Persons’ Statement

The information in this announcement that relates to the MREs are based on data 
compiled by Robert Davies, EurGeol, CGeol, an independent consultant to Oriole. 
Mr Davies is a Director of Forge International Limited.  Mr Davies has sufficient
experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person
as defined in the JORC Code.  Mr Davies consents to the inclusion in the report 
of the matters based on his information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially
affects the MREs, and that all material assumptions and technical parameters underpinning
the MREs continue to apply.

The technical information in this release that relates to exploration results and
any planned exploration programme(s) has been compiled by Claire Bay (Executive 
Director).  Claire Bay (MGeol, CGeol) is a Competent Person as defined in the JORC
code and takes responsibility for the release of this information.  Claire has reviewed
the information in this announcement and confirms that she is not aware of any new
information or data that materially affects the information reproduced here.

Share on:
