# Metal Tiger plc Growing Potential Outside Existing Planned Pit

- Link: https://www.directorstalkinterviews.com/metal-tiger-plc-growing-potential-outside-existing-planned-pit/412739843
- Published: 2017-11-14T08:05:52+00:00
- Author: Giles Arbor

**Metal Tiger plc** (LON:MTR), the London Stock Exchange AIM listed investor in 
strategic natural resource opportunities, has today provided the following update
regarding the Company’s Joint Venture (“JV”) project with partner MOD Resources 
Limited (ASX:MOD) in the Kalahari Copper Belt in Botswana (70% MOD Resources/30%
Metal Tiger). Metal Tiger also holds 95,543,934 MOD shares, equivalent to 5.044%
of MOD’s issued share capital and 1,541,667 MOD warrants at an exercise price of
6 cents (Australian).

**Highlights:**

 * Drill core assays along strike from planned T3 open pit confirm high-grade vein
   intersections and build confidence in the conceptual underground mining potential.
 * Mineralised veins now appear to be continuous over an enlarged 1,400m strike 
   length.
 * Headline intersections from the 6 holes received include:
    Hole MO-G-80D 4.5m@
   4.0% Cu & 65 g/t Ag from 254m near western limit of drilling. Hole MO-G-81D 11.0m@
   1.5% Cu & 19 g/t Ag from 186m near eastern limit of drilling.
 * Re-interpretation of Airborne Electromagnetic (AEM) geophysics data with three-
   dimensional (3D) modelling suggests the 200-300m thick T3 mineralisation host
   sequence may continue along strike for up to 11km. Drilling to test the model
   has commenced.

 

> **Michael McNeilly Chief Executive Officer of Metal Tiger Plc commented:** “The
> latest batch of drill core assays from our T3 Copper/Silver project continue to
> build on the potential of the deposit. With all six holes returning significant
> intersections and higher-grade zones, from outside the confines and along strike
> of the current pit shell, the potential for future mining, be that open-pit or
> open-pit and underground, continues to grow.
> The reinterpretation of airborne geophysics in conjunction with the latest understanding
> of the geology derived from drilling results has generated a three-dimensional
> model of the T3 mineralisation host sequence for drill testing. With a potential
> 11km of resulting 3D model strike length to be tested, we are excited by the potential
> of finding further, as-yet hidden, copper mineralisation.
> We look forward to providing further exciting updates as the various work streams
> continue towards the scheduled Prefeasibility Study findings in December.”

For images that may assist readers in the visualisation of the T3 Project area and
drill collars mentioned in this announcement, we would refer to the announcement
released today by MOD Resources Limited (“MOD”). This announcement can be viewed
through the following link:

http://search.asx.com.au/s/search.html?query=mod&collection=asx-meta&profile=web

Shareholders should note that the timing of MOD announcements are outside the control
of MTR, however, MTR does its utmost to announce the drill results and important
updates as soon as practicable after MOD makes its announcement to the ASX. MTR 
are only made aware of drill results and important updates immediately prior to 
the MOD release.

**T3 Drilling Programme Update**

 * Assay results received from a further 6 diamond drill holes located outside and
   along strike from the eastern and western limits of planned T3 Open Pit (MO-G-
   74D, MO-G-76D, MO-G-78D, MO-G-79D, MO-G-80D and MO-G-81D).
 * Assays confirm significant mineralisation continues, and remains open, along 
   strike from planned T3 Open Pit mine. Total strike length of mineralisation now
   circa 1,400m.
 * Four holes MO-G-74D, MO-G-76D, MO-G-79D and MO-G-80D, were reported as having
   visual copper mineralisation intersections in the announcement of 3rd October
   2017.
 * High-grade copper veins, intersected by the 4 holes, are interpreted to correlate
   with extensive shallow-dipping veins (V1 to V4) identified within, below and 
   down-dip of the planned T3 Open Pit.
 * High-grade veins commonly occur above significant widths of Zone 3 generally 
   lower grade but potentially widespread disseminated copper mineralisation. Zone
   3 is approximately 200m below Zone 2 and 300m below the top of the Zone 1 T3 
   Resource.
 * Latest high-grade copper/silver intersections build on the existing high-grade
   vein intersections which are being assessed as a potential underground mining
   target complimentary to the open pit, in the ongoing conceptual underground mining
   study.
 * 36 of the 70 diamond holes scheduled for the current Phase 2 drilling programme
   have now been completed.
 * Key down-hole intersections from the latest batch of diamond drill hole assay
   results, with interpreted mineral zone and vein id, include:
 * Hole MO-G-74D
    4.0m @ 0.8% Cu & 17g/t Ag from 265m (Zone 1 / V1) 5.0m @ 0.9% 
   Cu & 20g/t Ag from 292m (Zone 1 / V2) 5.0m @ 0.7% Cu & 14g/t Ag from 303m (Zone
   1 / V2)
 * Hole MO-G-76D
    8.2m @ 0.7% Cu & 15g/t Ag from 292m (Zone 1 / V1) 1.0m @ 5.8% 
   Cu & 87g/t Ag from 346m (Zone 1 / V2) 50.0m @ 0.5% Cu & 6g/t Ag from 431m (Zone
   3)
 * Hole MO-G-78D
    5.8m @ 1.5% Cu & 28g/t Ag from 235m (Zone 1 / V2)
 * Hole MO-G-79D
    9.0m @ 0.9% Cu & 20g/t Ag from 332m (Zone 1 / V1) 3.1m @ 1.4% 
   Cu & 12g/t Ag from 418m (Zone 2 / V3) 52.5m @ 0.6% Cu & 7g/t Ag from 448m (Zone
   3)
 * Hole MO-G-80D
    3.9m @ 1.6 % Cu & 36g/t Ag from 239m (Zone 1 / V1) 4.5m @ 4.0%
   Cu & 65g/t Ag from 254m (Zone 1 / V2) 2.2m @ 1.9% Cu & 31g/t Ag from 264m (Zone
   2 / V3) 6.0m @ 1.8% Cu & 41g/t Ag from 272m (Zone 2 / V4) 10.0m @ 0.7% Cu & 7g/
   t Ag from 492m (Zone 3)
 * Hole MO-G-81D
    11.0m @ 1.5% Cu & 19g/t Ag from 186m (Zone 1 / V2)

**T3 Dome Regional Exploration & Geophysics Update**

Current T3 Dome regional exploration targets include Airborne Electromagnetic (AEM)
geophysics anomalies identified from the survey completed in July 2017. The AEM 
anomalies occur within an 8km wide zone extending along the 50km long strike of 
the survey area; together with copper geochemical anomalies identified by systematic
soil sampling.

 * Re-interpretation of the AEM geophysics survey data for the T3 Dome has been 
   completed. This has confirmed the potential of many of the individual AEM targets
   for drill testing (as announced 21 July 2017).
 * Systematic interpretation of the AEM data on 100m spaced T3 Dome cross sections,
   appears to have defined the 3D structural geometry of the T3 host sequence, to
   approximately 500m below surface.
 * A sixth diamond drill rig has arrived onsite and drilling has commenced to determine
   the source of a 11km long, canoe shaped, shallow west plunging conductive anomaly
   which extends 4-5kms either side of the current T3 deposit. With the first hole
   circa 2km east of T3.
 * Drilling has commenced to test the first AEM anomaly ‘A16’ (hole MO-G-106D) circa
   1km north of T3. A16 is located near to the new 3D conductive anomaly and may
   provide further structural information to refine the model.

**The Background**

The T3 Project is located on the Kalahari Copper Belt in northern Botswana and is
part of the MOD/MTR joint venture Botswana Copper/Silver Project. T3 is located 
within the central part of the T3 Dome (approximately 1,000km2), which is the focus
of rapidly increasing exploration activity undertaken by the JV. Two significant
resources have been discovered to date within the T3 Dome: T1 (Mahumo deposit 100%
MOD) and T3 (70% MOD / 30% MTR).

The T3 deposit was discovered in March 2016 when a reverse circulation (“RC”) drill
hole intersected 52m @ 2.0% Cu and 32g/t Ag from shallow depth. The maiden T3 JORC(
2012) compliant Mineral Resource was announced on 26 September 2016 with the first
Resource upgrade announced on 24 August 2017. The results of a Scoping Study for
an open pit mine at T3 with a 2Mtpa processing plant, an indicative mine life of
10 years and an average production rate of 21,800tpa of copper and 665,000oz pa 
of silver was released on 6 December 2016. Work on a Pre-Feasibility Study (PFS)
commenced in January 2017 and additional deeper copper mineralisation was discovered
below the T3 Resource in February 2017.

The T3 Prospect geological data and exploration results have been reviewed and approved
by Jacques Janse van Rensburg, BSc (Hons), Business Development Manager and Competent
Person for MOD Resources Ltd. Mineral Resource estimation and classification of 
the T3 Copper/Silver Project was conducted and approved by Mr A.I. Pretorius, MSc.
Pri.Sci.Nat. an independent consultant to MOD Resources Ltd.

The current phase of drilling at the T3 Copper/Silver Deposit commenced on 7th August
2017, with approval granted for the recommencement of both diamond core (DC) and
reverse circulation (RC) drilling at the T3 Project and its vicinity, through to
December 2018. This includes up to 70 planned diamond core drill holes designed 
to infill the current Resource and test for possible extensions. The objective of
the infill program is to increase geological confidence and upgrade categorisation
of the T3 Resource. The programme also includes grid drilling to investigate the
potential for an underground Resource down-dip and along strike from the planned
open-pit, and to investigate geophysical targets.

The technical information contained in this disclosure has been read and approved
by Mr Nick O’Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who acts
as the Competent Person under the AIM Rules – Note for Mining and Oil & Gas Companies.
Mr O’Reilly has visited the T3 site and reviewed MOD’s drilling and sampling protocols
and procedures. Mr O’Reilly is a Principal consultant working for Mining Analyst
Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

Share on:
