# INTERVIEW: Rainbow Rare Earths Ltd Maiden JORC Mineral Resource Estimate

- Link: https://www.directorstalkinterviews.com/interview-rainbow-rare-earths-ltd-maiden-jorc-mineral-resource-estimate/412763199
- Published: 2018-12-17T07:40:35+00:00
- Author: Giles Arbor

**Rainbow Rare Earths Ltd** (LON: RBW), the rare earth element mining company, has
today announced a maiden Mineral Resource Estimate completed in accordance with 
JORC (2012) in respect of the Company’s Gakara rare earths project in Burundi, East
Africa, which is Africa’s only producing rare earth mine.

CEO Martin Eales talks to DirectorsTalk about its maiden JORC resource at Gakara.
Martin explains what has been found, how this compares to expectations, further 
upside potential, production and the plans for 2019.

 

**Highlights**

· Total Maiden JORC compliant Resource of over 1.2 million tonnes of ore covering
a small fraction of the Gakara Project – confirming for the first time the scale
of the deposit

· Three areas (Gasagwe, Murambi South and Gomvyi Centre) are very high grade vein
stockwork deposits – totalling 12,491 tonnes of Total Mineral Resource at an average
TREO grade of 55% (compared to average rare earth project grades of c.1-4% TREO)

· Kiyenzi is a very large, lower grade mineralised deposit with nearly 1.2 million
tonnes Mineral Resource at an average grade of 2.2% TREO employing a cut-off of 
1% TREO

· The Mineral Resource is based on only four out of the 28 mineralised prospects
across Rainbow’s existing Mining Licence – indicating significant further upside
for future exploration

· The Exploration Target for very high grade vein ore (on a consistent 2016 basis)
has increased by 70% following work undertaken across the deposit since IPO in January
2017

· Rainbow plans to rapidly bring Gomvyi Centre and Kiyenzi into production during
2019

> **Martin Eales, CEO of Rainbow Rare Earths, said: **
> “We are pleased to announce the maiden JORC-compliant Mineral Resource Estimate
> for the Gakara project, on time and on budget. The Mineral Resource, which is 
> based on only four out of the 28 identified targets within our licence, shows 
> over 1.2 million tonnes of ore, a considerable deposit in its own right, and provides
> further evidence that the Gakara deposit is a world-class source of rare earth
> oxides.
> “Three of the areas are high-grade vein stockworks, and include 12,491 tonnes 
> of ore Resource at 55% TREO. These alone will provide over two years’ head feed
> for our planned ramp-up to 5,000t concentrate, and we will of course continue 
> to explore these deposits further.
> “The Kiyenzi deposit has been confirmed as a very large, lower grade deposit, 
> which ties in with the airborne and ground gravity results previously announced.
> The currently modelled deposit amounts to nearly 1.2 million tonnes of ore at 
> 2.2% TREO, and may well be related to a carbonatite source. This deposit is open
> in all directions and is an extremely exciting prospect as it presents a new opportunity
> for Rainbow to further develop its mining and processing capabilities.
> “These results will provide us with confidence in our ability to obtain near and
> medium-term sources of ore, but more importantly point to the existence of a truly
> unique deposit, which we will continue to explore in the future.”

 

**JORC 2012 Maiden Mineral Resource Estimate**

Earlier in the year, Rainbow announced that it was working towards the completion
of a maiden code-compliant Mineral Resource estimate for its Gakara Rare Earths 
project, to be published by the end of 2018. This maiden Mineral Resource estimate,
which is now complete, was undertaken on behalf of Rainbow by Benzu Minerals (Pty)
Ltd , and has been reported in accordance with the guidelines of the Joint Ore Reserve
Committee (JORC) 2012 code.

The most recent previously-published technical report relating to the project by
Rainbow was the ‘JORC Competent Person’s Report for the Gakara REE Project, Burundi’
compiled by The MSA Group (Pty) Ltd (‘MSA’) and dated 30 September 2016, which was
included in the Prospectus published in connection with the Company’s IPO on the
London Stock Exchange in January 2017.

Since then, a considerable amount of work has been carried out at the Project, including
greenfields and brownfields exploration, drilling, mining, ore processing testwork,
modelling, and ore processing and concentrate production. This work has produced
a significant amount of new technical information and data that have materially 
changed the understanding of the ore deposit and the REE mineralisation it contains,
and has enabled the calculation of a maiden Mineral Resource estimate.

Since 2011, Rainbow has kept detailed maps of over one thousand REE vein occurrences
across its mining licence, from which it has defined 28 “prospects” or “targets”(
which have typically been named after the nearest village or other geographic features).

The maiden Mineral Resource estimate has been based on just four of these 28 mineralised
targets, and therefore represents only a small portion of the mining licence area
that the Company will seek to exploit in the coming years.

 

  |

Deposit Name

  |

Mineral Resource

 

  |  
 |

Measured (t)

  |

Indicated (t)

  |

Inferred (t)

  |

Total Ore (t)

  |

TREO Grade %

  |

Contained TREO (t)

  |  
 |

Gasagwe

  |

153

  |

273

  |

570

  |

996

  |

58.7

  |

585

  |  
 |

Murambi South

  |

972

  |

2,917

  |

4,480

  |

8,369

  |

54.8

  |

4,586

  |  
 |

Gomvyi Centre

  |

–

  |

861

  |

2,265

  |

3,126

  |

54.0

  |

1,688

  |  
 |

Total high grade deposits

  |

1,125

  |

4,051

  |

7,315

  |

12,491

  |

   54.9

  |

6,859

  |  
 |

 |

 |

 |

 |

 |

 |

 |  
 |

Kiyenzi*

  |

58,671

  |

297,274

  |

837,033

  |

1,192,978

  |

2.2

  |

26,570

  |  
 |

Total

  |

59,796

  |

301,325

  |

844,348

  |

1,205,469

  |

2.8

  |

33,429

  |

 

*Kiyenzi shown at 1% cut off grade. For detail on Kiyenzi Resources at higher cut-
off grades see below.

For each of these four areas, further tonnages can be classified under JORC as ‘
Target’ additional to the Resource figures. Based on standard JORC methodology these
Target tonnes are as follows:

  |

Deposit Name

  |

Exploration Target

(t)

 

  |  
 |

Gasagwe

  |

1,026

  |  
 |

Murambi South

  |

6,622

  |  
 |

Gomvyi Centre

  |

5,132

  |  
 |

Kiyenzi

  |

1,065,170

  |  
 |

 

Total

  |

 

1,077,950

  |

 

The 6,859 tonnes of TREO Resource contained in the Gasagwe, Murambi South and Gomvyi
Centre deposits alone, all of which the Company expects to be mining in 2019, would
provide more than two years’ of concentrate production at 58% TREO based on the 
Company’s target run rate of 5,000 tonnes of concentrate per annum, even before 
including any production from the much larger Kiyenzi body.

More detail on each of the four prospect areas is included below.

**Revised Exploration Target**

An Exploration Target is a statement of the exploration potential of a mineral deposit
in a defined geological setting for which there has been insufficient exploration
to estimate a Mineral Resource. In the CPR contained in Rainbow’s 2017 IPO Prospectus,
MSA estimated that Rainbow’s entire Gakara Project had an Exploration Target range
of between 20,000 – 80,000 tonnes of in situ high grade vein ore.

Following further regional mapping work carried out since the publication of the
CPR, Rainbow’s REE occurrence database has increased from approximately 800 records
to over 1,200 records. Of these c.1,200 occurrences, some 840 are in-situ, an increase
of some 320 records from the 520 data points used by MSA.

Employing a consistent methodology and estimation criteria to that which was used
by MSA on the enlarged data set has allowed Benzu to update the Exploration Target
to between 34,400 to 137,500 tonnes, representing an increase of over 70%.

The four project areas included in the Mineral Resource estimate comprise 8,290 –
33,161 tonnes of this revised Exploration Target for high grade vein ore, representing
only 24% of the upper and lower tonnage figures.

Brownfields exploration is being carried out on an ongoing basis by Rainbow’s geology
team, with the potential for further uplifts to the Exploration Target. However,
the focus of Rainbow’s exploration programmes is on converting the Exploration Target
tonnage into Resources to ensure continuous replenishment of the resource pipeline
and hence the medium to long term life of mine.

**Kiyenzi**

The Kiyenzi deposit is characterised by the presence of REE mineralisation in the
form of breccias. Kiyenzi can in simple terms be described as a lower grade but 
large volume deposit.

The REE-bearing bastnaesite/monazite are present in large breccia units, but also
as large cleaner veins, as thin to microscopic veins and perhaps as xenocrysts within
the host rocks. The ‘invasion’ of REE-rich fluids in the aplites and gneiss has 
generated a large mineralised body, in the form of a voluminous intrusion such as
a pipe. The host rocks (gneiss and aplite) are hard, but heavily fractured, such
fragmentation being likely the effect of a violent hydrothermal or phreatomagmatic
process which would have also caused the formation of the breccias. The morphology
of such complex deposit can be visualised as a ‘breccia pipe’, commonly described
in the literature as a form of manifestation of a carbonatite system.

At present, Rainbow has identified this deposit type only at Kiyenzi within the 
mining licence area.

Diamond Drilling of the Kiyenzi target was carried out in two phases. Following 
the positive intersection of mineralised breccia in phase one (464m), the second
phase of the drilling work (964m) was carried out between July and September 2018
with the objective of establishing the lateral and vertical extents of the REE-mineralised
intersections and ultimately to model the orebody.

Following the grade assays obtained from selected core samples of the host rocks
facies and also from cores for entire drill holes it became evident that the aplites
and the gneiss also had the potential to be mineralised, especially in the drill
sections surrounding the breccias. TREO grades of 1% to 5% in units logged as aplites
as well as in gneisses can only be explained if some form of bastnaesite/monazite
mineralisation has occurred.

Owing to the complexity and variability of the mineralisation, the calculations 
of the Mineral Resource estimate was performed based on grades and not only on the
modelling of the geology. All models were carried out using the ‘Implicit Modelling’
algorithm of the Micromine software. The grade model was performed using the ‘Inverse
Distance Weighting’ interpolation also run in Micromine. Both models were achieved
by an independent consultant of Micromine.

Kiyenzi mineral resource estimate at differing cut off grades

  |

TREO Cut off grade %

  |

Measured Resource (t)

 

  |

Indicated Resource (t)

  |

Inferred Resource (t)

  |

Total Resource (t)

  |

TREO Grade %

  |

Contained TREO (t)

 

  |  
 |

1.0

  |

58,671

  |

297,274

  |

837,033

  |

1,192,978

  |

2.23

  |

26,570

  |  
 |

2.0

  |

26,523

  |

146,087

  |

339,250

  |

511,860

  |

3.27

  |

16,716

  |  
 |

3.0

  |

13,138

  |

90,921

  |

128,354

  |

232,413

  |

4.29

  |

9,970

  |  
 |

4.0

  |

7,511

  |

60,734

  |

37,069

  |

105,314

  |

5.31

  |

5,591

  |  
 |

5.0

  |

4,139

  |

35,012

  |

3,093

  |

42,244

  |

6.77

  |

2,859

  |

 

The Mineral Resource tonnage estimate is highly sensitive to the grade cut-off employed.
This indicates the presence of a considerable quantity of mineralisation within 
the deposit. It is possible that Kiyenzi is connected to the carbonatite source,
conjectured to be the motherlode of the vein stockworks found across the mining 
licence area, and warrants further investigation. Indeed, the latest mineralogy,
petrography, geochronology, structural and fluid inclusions data from a PhD study(
in preparation) have finally confirmed that the Gakara REE mineralisation is derived
from a carbonatitic source.

Rainbow has already achieved some encouraging yields and recoveries from test processing
of Kiyenzi ore and intends to commence exploitation of this deposit during 2019.
It is therefore intended to process the Kiyenzi material through the existing processing
plant – however the larger, lower grade ore body may well be amenable to further
beneficiation, if further testwork and mineralogical tests prove positive. Furthermore,
the large volume, lower grade resource will likely require a mining methodology 
very different to the methodology adopted to date to mine very high-grade veins 
within a friable, free-digging saprolitic country rock.

**Gasagwe**

The Gasagwe deposit is the area within the licence area where mining began during
2017. As such, much more is known about this deposit, and it therefore represents
a fundamental benchmark for the delineation of JORC compliant Mineral Resource estimates
in other vein stockwork prospects within the mining licence. The vast amount of 
geological data acquired during the past 1.5 years of mining has been applied to
other deposits, allowing the degree of confidence to be considered sufficient to
satisfy their classifications into Inferred, Indicated or Measured Resources.

The knowledge in relation to the Gasagwe vein structures and their mineralisation
include the following:

**\* Vein Thicknesses:** 2,181 channel samples were cut at Gasagwe using 2m spacing
per 1m level of exploitation. The thicknesses of each channel sample were measured
using DGPS. The variation of the vein widths over tens of vertical metres have now
been established and are well understood.

**\* Vein Morphology:** the channel samples have allowed for a greater understanding
of the morphology of every vein (with cm accuracy), their continuation (and lack
of continuation) laterally and at depth, and have enabled the creation of a model
that can be applied with confidence to other similar stockworks in the licence.

**\* Grade**: with some 183 samples analysed from all mining levels (from initial
surface to current mine level, c.40m below surface), the consistency of grades between
surface and samples at depth has been clearly established.

**\* Density (or SG):** in all previous, historic tonnage calculations, an assumed
SG of 4t/m3 was used. With the treatment of the Gasagwe ore at the Kabezi plant,
real SG data have been determined, that can now be applied to volumes at Gasagwe
but also on ores from other sites of the same type.

**\* Ore Processing:** all the ore mined at Gasagwe has been processed through the
Kabezi plant. The final concentrate for every single batch exported has been sampled
and the grade has proved to be consistently above the specified tenor of 54% TREO.
Criteria such as recovery, yield, losses, mass balance, tailings etc. are now well
established and can be used for ore from other mine sites.

**\* Mining:** the exploitation of the Gasagwe resource started in April 2017. Rainbow
has reviewed the mining methods on several occasions with the aim of optimising 
the process. Such reviews are ongoing. The mining experience gained at Gasagwe, 
which include other key aspects such as the emplacement of waste dumps, the construction
of access roads, the establishment of mining infrastructure, the process of expropriating
land for mining purpose and the environmental measures applicable to the mining 
processes will all be applied to future mine sites.

**Murambi South**

The Murambi mine site was opened in August 2018, and the trial mining and brownfields
exploration exploration undertaken to date have been very effective in providing
high-quality geological and resource data that have delivered a code compliant Mineral
Resource estimate.

Some 53 REE veins have been uncovered by the development works (trenching, trial
mining). Most of the occurrences have been sampled as well as mapped (thicknesses,
directions, dips, appearances etc.). The recorded lateral extents of the veins vary
from a mere metre up to 45m, the average being approximately 9m at this stage. Similarly,
the thicknesses of every vein have been measured (from some 452 precise channel 
sampling data points) and vary from 1cm up to 24cm, the present average being c.
7cm.

A detailed ground gravity survey covering the southwestern half of the mining block
has generated a series of NW-SE lineaments some of which having been confirmed to
be coinciding with bastnaesite/monazite veins, generally trending in the same direction
as the gravity lineaments. If such correlation can be further proved through more
trenching, then some of the veins could have strike lengths of over 125-150m. Such
possibility was used in the calculation of the ‘Exploration Target’ tonnage at Murambi
South.

**Gomvyi Centre**

The Gomvyi Centre prospect was selected as a potential near-future mine site because
of the following factors:

* The bastnaesite/monazite veins indentified are of high grade and, more importantly,
there is a population of large veins (>50cm) for which an in-situ source has not
been established yet

* The veins appear to be structurally controlled and continuous over significant
distances (50-100m if not more)

* The site is easily accessible as it is situated a mere 300m from an existing road

* The outlined mine site is sparsely populated, which should result in lower compensation
costs

At the time of completing the Mineral Resource estimate the mine development and
exploration works were ongoing. Further trenching is intended to help confirm some
of the very long vein extensions referred to above which would materially increase
the Resource that can be declared for this prospect area.

Rainbow’s current plan is also to commence exploitation of the Gomvyi Centre prospect
in 2019.

Share on: