# How faster refurbishment can reduce project pressure

- Link: https://www.directorstalkinterviews.com/how-faster-refurbishment-can-reduce-project-pressure/4121265672
- Published: 2026-10-08T16:09:00+01:00
- Author: Amilia Stone

Orbis Education & Care operates schools, residential homes and community settings
where the quality and practicality of the physical environment form an important
part of the overall service. Maintaining these spaces can require refurbishment 
work to be completed quickly, particularly where facilities need to be returned 
to use within tight deadlines.

For Orbis, the challenge was not simply finding a suitable bathroom finish. The 
refurbishment projects often needed to be completed within a week, making installation
time a key consideration. Any delay could extend disruption and prevent facilities
from being brought back into service as planned.

The requirement was therefore for a bathroom solution that could be installed quickly
while also meeting the practical demands of everyday use. Hygiene, durability and
ease of maintenance were important considerations, particularly in environments 
where facilities need to remain clean and functional over the long term.

Fibo’s wall panel system provided an alternative to traditional tiling, allowing
the refurbishment work to be completed within the required timeframe. The panels
are designed to offer a grout-free surface that is easier to clean and maintain,
while providing a durable finish for regular use.

Installation speed was a central consideration. Fibo states that its wall panels
can be installed up to five times faster than traditional tiling. For refurbishment
projects operating against a one-week deadline, reducing installation time can help
limit disruption and keep work moving according to schedule. Faster installation
can also reduce the amount of labour required for the project.

The panels are also designed to withstand everyday use while retaining their appearance
and performance over time. For Orbis, this provides a combination of short-term 
installation efficiency and a longer-term approach to maintenance.

The completed refurbishment provided Orbis with a bathroom designed around practical
requirements, combining a durable surface with easier cleaning and a faster installation
process. The approach also avoided the longer installation times associated with
traditional tiling, which was particularly relevant given the requirement to complete
the work within a week.

_**[Norcros plc](https://www.directorstalkinterviews.com/company/norcros-plc/nxr.l)**(
LON:NXR) is a leading B2B producer of branded bathroom and kitchen products for 
its UK, South African and selected export markets. The portfolio is characterised
by strong individual brands, together providing product breadth and channel diversity
from a strong supply chain base._

Share on:
