# Helium One Global Completion of 2021 Drilling Campaign, Phase 2 Exploration Begins

- Link: https://www.directorstalkinterviews.com/helium-one-global-completion-of-2021-drilling-campaign-phase-2-exploration-begins/4121019174
- Published: 2021-08-26T07:08:27+01:00
- Author: Giles

**Helium One Global plc** ([LON:HE1](https://www.directorstalkinterviews.com/company/helium-one-global/he1.l))
has announced today the completion of its 2021 exploration drilling campaign with
significant new data to move rapidly to Phase 2 exploration work at its 100% owned
Rukwa Project in Tanzania.

**Highlights**:

·    Definition of a working helium system in the Rukwa Basin, de-risking our 3,500km
^(2) license area

·    Greater knowledge of helium geology allows identification of ‘Shallow’ and ‘
Deep’ target types for Phase 2 Exploration

·    New ‘Shallow’ targets can be investigated by appropriate geophysical techniques
to identify prospects for low-cost drilling

·    New ‘Deep’ structural targets beneath well-developed 130m thick Top Karoo seal
can be investigated by 2D infill seismic on defined gravity targets

·    Company well financed with £10m to advance the Rukwa Basin towards discovery

·    Tai-2, although completed without identifying helium gas, has provided valuable
information on shallow trap and seal potential 

> **Ian Stalker, Non-Executive Chairman, commented:**_ _
> “Work undertaken so far in 2021 has significantly de-risked the Rukwa Basin by
> demonstrating a working helium system.  Helium One maintains 100% ownership of
> licences at Rukwa covering approximately 3,500km^(2) in what must now be considered
> the world’s premier basin for helium exploration.
> “With our maiden exploration campaign clearly demonstrating prospectivty at multiple
> levels across the basin, the Company can now move rapidly to develop a Phase 2
> exploration programme that offers value for money. Using various geophysical techniques,
> we can quickly and cheaply advance both ‘Shallow’ and ‘Deep’ target types to de-
> risk our ability] to make a commercial discovery with Phase 2 drilling.
> “The Company is well financed to deliver Phase 2 with a focus maintained on cost-
> effective exploration as we develop Rukwa towards discovery.”

> **David Minchin, Helium One Global** **Chief Executive Officer, commented:**_ _
> “We are excited by the results of the 2021 exploration drilling campaign which,
> although stopping short of flowing gas to surface, has produced significant information
> enabling Helium One to define a two-track exploration route to develop Rukwa towards
> discovery.
> “Results from Tai-1 have shown a prolific basin with helium shows identified at
> multiple levels from near surface to basement.  Tai-2 has verified the potential
> for development of newly identified ‘Shallow’ traps within the Lake Bed Formation,
> which has the capacity to open a pathway to low cost exploration and development
> of near surface gas deposits.
> “The identification of a 130m thick sealing unit at the top of the Karoo Formation,
> and presence of untested helium shows within Karoo reservoir, demonstrates potential
> for ‘Deep’ structural traps within the Karoo Formation.  The Top Karoo seal is
> predicted to be best developed away from the basin margin, encouraging us to focus
> exploration efforts on improving resolution over already identified Falcon Gravity
> Gradiometry targets to the north of Tai and Itumbula structures.”

**Details**

Helium One has completed its 2021 exploration drilling campaign with the identification
of a working helium system in the Rukwa Basin.  Drilling has demonstrated seal, 
reservoir, and trapping geometries as well as identified a charge mechanism in the
basin away from known surface seeps.  The identification of a well-developed sealing
claystone 130m thick at the top of the Karoo Formation demonstrates sufficient sealing
capacity in the basin to support the trapping of helium gas within the untested 
reservoir formations beneath. Additional helium shows on multiple horizons, including
beneath marginal sealing clays in the Red Sandstone Formation and shallow traps 
in the Lake Bed Formation, indicate potential for multiple prospective intervals
within a productive system.

**Shallow Target Type**

Tai-2, which was completed without identifying helium gas, has provided valuable
information on shallow trapping potential.  The well targeted continuation of a 
2.2% helium show identified in a sandstone interval at 70.5m in Tai-1: A high-grade
gas show which potentially indicates free gas in the subsurface.  Wireline logging
of Tai-2 demonstrated continuous clay over this interval, suggesting that the reservoir
in Tai-1 pinched out against clay, which provides both vertical and lateral seal.

The new Shallow target traps offer an opportunity for a low-cost route to explore
and develop a helium gas deposit.  Current seismic data does not accurately resolve
trapping styles at a shallow depth. Helium One is therefore reviewing several alternative
low-cost geophysical techniques to test over known structures in the Tai area, before
deployment over a wider area in the basin.  Drilling of the shallow traps will be
cheaper than testing deep targets and could potentially be conducted using a light-
weight water-rig, or similar rig capable of producing a stable hole, possibly opening
the option to conduct drilling operations over the wet-season.

**Deep Target Type**

Tai-1 demonstrated good quality sealing units above reservoirs in the Top Karoo,
a factor that was considered to be one of the highest geological risks prior to 
drilling.  Using existing infill 2D seismic data we have been able to accurately
map the continuity of this sealing unit across the Tai prospect, with the thickness
and quality of the sealing unit predicted to increase towards the basin centre.

Helium One have recognised a number of large structures identifiable on Falcon Gravity
Gradiometry data as well as recent and legacy seismic data.  These structures are
onshore northern extensions of the Itumbula and Tai structures and have potential
to demonstrate stacked targets at multiple levels of prospectivity.   The areas 
require further infill seismic to improve resolution and continue mapping of Top-
Karoo seal over these prospects.  Helium One is investigating the potential to mobilise
infill seismic before the wet season, leading to the design of a deep drilling programme
in 2022 to test these targets with an appropriately sized drilling rig.

**Next Steps**

Helium One remains well financed for the proposed exploration programme with a cash
position of ten million pounds.  By focussing on using various geophysical techniques
to reduce geological risk and improve drill targeting, the Company remains committed
to cost-effective exploration.  Helium One plans for rapid deployment of Phase 2
exploration activities and is working to mobilise various geophysical investigations
before the commencement of seasonal rains in November.

Share on:
