# Georgian Mining Corporation Operations Update

- Link: https://www.directorstalkinterviews.com/georgian-mining-corporation-operations-update/412740615
- Published: 2017-11-23T07:15:00+00:00
- Author: Giles Arbor

**Georgian Mining Corporation** (LON:GEO) has today provided an update on the exploration
and mineral resource development programmes underway across multiple targets within
its 860 sq km licence on the Tethyan Belt in Georgia, including the Kvemo Bolnisi
East Project (‘KB’ or the ‘KB Project’). To view the press release with the illustrative
maps and diagrams please use the following link:

[Georgian Mining PDF](https://www.directorstalkinterviews.com/wp-content/uploads/2017/11/2838X_-2017-11-22.pdf)

**Kvemo Bolnisi East Project targeting a 50MT+ copper – gold resource**

· New discovery 150m to the west of the GZ2 Mineral Resource, now called Gold Zone
3 (‘GZ3’) indicates scope for significant growth in tonnage – previously announced
diluted intercept of 0.65g/t Au over 143.8m from 117.20m (TGD093) including:

o 1.2m @35g/t Au from 67.0m

o 75.3m@ 0.46g/t Au from 117.2m

o 56.0m @1.03g/t Au from 205.0m

· Core logging indicates that two additional holes drilled at GZ3 have intersected
the same mineralisation style extending the strike length in the process – assays
underway

· Geochemical multi element data between GZ2 and GZ3 drill holes indicate that the
two zones may be connected at depth

· New linear gold in soil anomaly and drill target that may increase the KB gold
Resource highlighted by gold in soil geochemical surveys to the south of the KB 
Mineral Resource

o KB has a current JORC Resource of 3.154Mt @ 0.82% Cu & 0.14g/t Au and a gold oxide
resource of 2.29Mt @ 0.85g/t Au

· Updated Mineral Resource on gold and copper based on the latest round of drilling
which focused on the immediate environs around the GZ2 mineralisation expected from
external resource consultants within weeks

· Metallurgical test work continues on gold oxide ores from the KB Project

· Negotiations continue in relation to the Company’s proposed KB gold oxide production
and processing agreement and updates will be provided in due course.

Additional targets offer scope to expand the resource beyond the 50MT exploration
target for KB

· IP geophysical surveys at Tamarisi and Dambludka projects continue to generate
new drill targets

· Mapping and soil geochemistry work continues at Dambludka, a base and precious
metal project covering a 2km by 1km area in preparation for a drill programme scheduled
to commence early in the new year

· Historic gold analyses in adit samples at Dambludka are recorded at grades as 
high as 775g/t Au

Georgian Mining Corp Managing Director Greg Kuenzel said, “Whether drilling or geochemical
surveying, the results of our work at KB continue to be consistent with our geological
model: that KB hosts large scale epithermal gold-copper mineralisation. Our three-
phase strategy to prove up our model is well advanced. Having already hit our Phase
2 target of 3-5Mt, we expect to increase this further in the coming weeks with an
updated Mineral Resource on both gold and copper at KB. We continue to identify 
additional targets within KB and at other prospects across the licence, which strengthens
our belief that there remains tremendous scope for us to deliver more than 50Mt 
of copper-gold resources as we look to build another significant copper gold operation
on the prolific Tethyan Belt.”

**Gold Zone 3 Growth**

The initial step-out exploration at KB led to the discovery of Gold Zone 2 (‘GZ2’).
The recently announced GZ3 discovery resulted from a further successful step-out
to the west of GZ2.

Image 1: Plan showing location of Gold Zone 3 – See PDF

Detailed assessment of the mineralisation in drill core suggests a different mineralisation
style to that found at GZ1 and GZ2 based on a review of the lithology, grade distribution
and elemental associations.

The style of mineralisation is similar to a nearby Resource characterised by a gold–
zinc association, interpreted to be part of a carbonate base metal low sulphidation
epithermal deposit model. This new mineralisation style provides scope for the building
of large tonnage. In effect, the KB exploration and drilling programme is potentially
moving from a stage of incremental growth to one of exponential growth in line with
the documented exploration and development strategy.

Two drill holes have been analysed and reported to date, TGD087 and TGD093 with 
encouraging results being achieved particularly in TGD093, where, accepting no limitation
on internal waste in line with the bulk tonnage objective, mineralisation included
an intercept at 117.2m returning a gold grade of 0.64g/t Au over 143.8m.

Two further holes, TGD105 and TGD106 have recently been completed and the core will
be dispatched for analysis. Initial core logging indicates these holes, drilled 
to step-out from TGD093 have intersected the same mineralisation style.

Analysis of multi element geochemistry from the analysed holes at GZ3 with similar
data for GZ2 further to the east indicates that the new mineralisation system extends
eastwards over a minimum strike length of 250m. There is no drilling between these
holes at GZ2 and GZ3 and this represents an obvious target for follow up.

A new drillhole, KWD003 intersected an epithermal quartz breccia returning an intercept
of 59.5m at 88g/t Ag from 7.5m, approximately 700m to the southwest of GZ3. Whilst
this intercept is not gold-rich, it is indicative of the continued exponential growth
potential of the epithermal system. The area between these drill holes has not been
previously tested and represents another obvious drill target.

**New Extension to KB Gold Mineralisation**

A soil geochemical survey has been successfully completed over the KB SW target,
which forms the southern extension of the KB Mineral Resource. The survey identified
a NE-SW oriented linear gold in soil anomaly that appears to be part of an arcuate
regional feature that includes both the KB Mineral Resource and a large linear gold
target situated to the immediate west. Again, KB SW represents an obvious drill 
target offering scope to further expand the KB Au oxide Mineral Resource.

**Metallurgical Test Work**

Further metallurgical test work including additional bottle rolls and column leach
tests are continuing under the supervision of external metallurgical consultant 
Wardell Armstrong International.

**Resource Estimation Update**

A Mineral Resource estimation update is underway with the Company’s external Resource
consultant. The Company expects to provide shareholders with an update in due course.

**Dambludka Soil Survey Defines Larger Target**

Two soil geochemical surveys have been successfully completed at Dambludka. The 
initial survey was confined to an area that overlies high-grade historical gold 
channel sample results from old drives and adits. Historical gold analyses in the
channel samples are recorded at grades as high as 775g/t Au.

Adit 24 records 11 samples with channel grades exceeding 5g/t Au over a maximum 
channel width of 1.2m with peak grades of 16.2 and 14.8g/t Au. Adit 11a reported
5 samples exceeding 100g/t Au with peak grades of 775g/t Au, 679g/t Au and 249g/
t Au over a maximum channel width of 1m and Adit 11 records 7 samples returning 
grades of greater than 70g/t Au over channel widths of 0.5m with peak grades of 
260g/t au, 534g/t Au and 214g/t Au. The accuracy of these historical results will
need to be validated with our own sampling to verify the grades. The initial overlying
soil survey reported gold grades ranging from 0.38 to 1.01g/t Au. A follow up survey
was completed to test the north, east and west extension of mineralisation returning
typical gold in soil grades of between 0.1ppm Au and 1.ppm Au.

The results supported by the unusually high gold channel sample analyses are sufficiently
anomalous to warrant a drill programme. An initial 8-hole programme has been planned
to test the soil anomalies and underlying channel sample gold veins.

A 10km2 area has been identified as being anomalous and a forestry permit has been
applied for in order to support access road and drill pad construction. Drilling
is expected to commence in Q1 2018.

**IP Geophysical Survey Update**

IP geophysical surveys have been conducted over a number of targets within the Licence.
The objectives are twofold, firstly to test for extensions to known mineralisation
and secondly to provide additional data for subsequent interpretation during the
latter part of Q4 to generate additional drill targets for Q1 2018.

**Tamarisi Survey**

The Tamarisi Project is located to the east of Tsitel Sopeli in the southern half
of the Licence. Exploration was conducted by two Soviet expeditions in the late 
60’s and mid-70’s and the most recent work was completed in 1998. The scope of work
conducted is similar to the situation originally found by the Company at Kvemo Bolnisi
and therefore potentially offers an opportunity to find new mineralisation by employing
modern exploration techniques. Historic copper, lead and zinc analysis of drillholes
that extended to 400m depth returned anomalous intercepts for base metals but failed
to demonstrate any continuity of mineralisation compounded by the vertical inclination
of drillholes. It was also reported that core recoveries were frequently less than
50 per cent and the report also comments that areas of mineralisation in the core
were washed out during drilling. In 1998, 14 new holes were drilled and the report
states that “In virtually all cases analysed, gold was found with grades up to 13.6g/
t Au over 10m and to a depth of 350m”.

**Soviet reports estimated that mineralisation occurred over a 2km2 area.**

Other historic drill intercepts included DDH259 returning 4.2g/t Au over 10m from
202m, DDH612 returning 7.85g/t Au and 1.95% Cu over 5m from 384m, DDH614 returning
0.52g/t Au over 21m from 64.5m and, Trench 01B returning 1.07g/t Au over 11m.

GEO has completed a 3 line IP (4.8km) geophysical survey over the target area and
generated both chargeability and resistivity anomalies. The Company’s external geophysical
consultant has been provided with the raw data for interpretation.

The results of the interpretation and possible additional IP survey lines will determine
what follow up will be required.

**Dambludka Survey**

A survey at Dambludka is scheduled to commence in the next few days and will provide
supplementary information to the recently completed soil geochemical survey and 
ahead of the planned drilling programme.

Share on:
