# Georgian Mining Corp Q&A: Initial Mineral Resource at Kvemo Bolnisi (LON:GEO)

- Link: https://www.directorstalkinterviews.com/georgian-mining-corp-qa-initial-mineral-resource-kvemo-bolnisi-longeo/412732031
- Published: 2017-07-17T11:47:25+01:00
- Author: Amilia Stone

**Georgian Mining Corp** (LON:GEO) Managing Director Greg Kuenzel caught up with
DirectorsTalk for an exclusive interview to discuss the initial Mineral Resource
estimate for Gold Zone 2 at Kvemo Bolnisi

 

**Q1: Now Greg, you announced your initial mineral resource estimate for Kvemo Bolnisi,
can you talk us through the highlights?**

**A1**: The announcement today was related to one of three zones that we’ve been
actively exploring and developing over the last 12 months now at Kvemo Bolnisi. 
Kvemo Bolnisi is one of a number of projects we have within our 860-square kilometre
licence in Georgia, which we hold under a 50/50 JV.

The work, earlier this year, was focussed on a target we refer to as Copper Zone
1 and we announced an initial resource on that copper zone earlier in the year, 
now that resource was targeting a 1-2 million tonne resource at greater than 1% 
to allow us to then start mine planning to provide ore to our local partner’s float
plant which is only located 7km away.

Work then moved on to Gold Zone 2, which is slightly to the north of the copper 
sulphide zone, the area is quite interesting in that it generally has this gold 
oxide cap occurring from surface, in most places it’s only several metres from surface
and it’s referred to as a scab for that reason. We started doing work up in Gold
Zone 2 earlier in the year, we commenced with excavation so geochemistry excavations
then we did some drilling which we then expanded as we were discovering that the
gold oxides in that area were occurring a lot deeper so from surface down to around
between 40-50 metres. So, we focussed our drilling on an area of approximately 150
by 150 metres, with the target of achieving an initial 750,000 – 1 million tonne
resource with a grade target of 1 gram per tonne. We’ve exceeded that target with
today’s announcement, we have an overall resource of close to 2.3 million tonnes
at 0.85 with an optimised open pit target within that of 1.14 million tonnes at 
1.1, now that number has been chosen again, our partner operates 2 producing mines
in Georgia, with 2 heap leach plants so that target was defined to basically allow
us to start production and producing ore that was going to be able to supply those
heap leach plants.

So, work is continuing now on an internally-generated scoping study, we’ve almost
completed our metallurgical work, we’re about 95% through that. The met testing 
has all been very positive to date, we’re getting very good recoveries and the ore
is of almost exactly the same type has been processed over the last 30-40 years 
at the local operations so it’s amenable to heap leaching. So, very very positive
result for Georgian Mining Corp.

 

**Q2: You mentioned that the metallurgical test work need to finalise the scoping
study is on the way and nearly complete, what happens next for Georgian Mining?**

**A2**: The next stage is to finalise that met work and finalise the scoping study
document, we expect that to be completed imminently and then the next stage is to
start the detailed negotiations on the timetable and the terms for the production
and processing of the ore. In the meantime, we’re continuing with infill and step-
out drilling, the infill drilling really aimed at increasing the grade and the categories
of that larger global resource of 2.3 million tonnes at 0.85, this has turned out
to be quite a reasonable sized gold oxide deposit. I think one of the important 
things to point out as well is given it occurs from surface, there’s little if any
stripping so as soon as you break ground, you’re effectively producing ore so it’s
a very very positive position to be in. So, we expect the met work to be finalised
imminently, that scoping study will then be finalised and then the next step is 
then to finalise the timetable and the terms for production and processing.

Consecutive to that as well, I mentioned we’re doing infill drilling on the gold
oxide, we’re also doing step-out drilling to the east and to the south to look at
joining up the other zones that we’ve been working on. You might remember, when 
we announced some of the drill results on the gold oxide zone back in early June,
very excitedly for us we discovered that as we broke through the base of the oxide,
we started hitting copper sulphides again as well as a high-grade chalcocite mineralisation
which returned a grade of 16 metres at 15% copper including 5 metres at 40%. More
importantly than that, we’ve intersected copper sulphides at depth, now we believe
that these three zones very likely coalesce and as a result will join together to
form one significantly larger target than the individual targets that Georgian Mining
Corp have been working on to date.

We’re also doing further work up to the north of those three zones; excavations,
channel sampling and we’ll be looking to do some further drilling there later in
the year and this is where we’ve defined the 50 million tonne exploration target.
What we’re looking at now at Kvemo Bolnisi is the total footprint of approximately
1 km by 1.3km which interestingly is the same footprint as the open pit Madneuli
mine which is located only 7km away, which has produced in the vicinity of 80 million
tonnes in its 40-year life and is reported to have another 40 million tonnes, approximately,
in resource.

So, we think there’s potential for Kvemo Bolnisi to grow quite significantly from
where we now have it.