# Georgian Mining Corp Further Drill Results from Kvemo Bolnisi

- Link: https://www.directorstalkinterviews.com/georgian-mining-corp-drill-results-kvemo-bolnisi/412728560
- Published: 2017-05-04T07:25:58+01:00
- Author: Giles Arbor

**Georgian Mining Corp** (LON:GEO) has today announced further results from the 
drill programme currently underway to establish an initial resource at Gold Zone
2, one of three targets currently being developed at Kvemo Bolnisi East (‘KB’). 
The results of the drilling programme further support GEO’s belief that the three
zones currently being targeted at KB (Copper Zone 1, Gold Zone 1 and Gold Zone 2)
are part of one large epithermal copper/gold unit.

The drill programme at Gold Zone 2, including today’s latest results, is providing
a suite of positive gold (‘Au’) intersections which are expected to generate an 
additional gold oxide Resource. This resource, together with the copper resource
already reported, will be used for proof of concept heap leaching at one of two 
nearby heap leach operations owned by the Company’s JV partner, which is expected
to further de-risk KB.

· Selected Au intercepts include:

o TGD-015: 10m @ 6.36g/t Au from 8.0m

o TGD-026: 10m @ 0.90g/t Au from 10.0m

o TGD-030: 6.0m @ 1.55g/t Au from 0.0m

o TGD-034: 30.6m @ 1.31g/t Au from 1.0m

o TGD-036: 1.0m @ 6.17g/t Au from 3.0m

o TGD-037: 6.0m @ 4.63g/t Au from 5.0m

o TGD-038: 25m @ 2.71g/t Au from 0.0m

o TGD-045: 17m @ 0.8g/t Au from 24m

In addition to delineating gold oxide mineralisation, this programme has discovered
an extension of the copper – gold sulphide mineralisation initially found to the
south of Gold Zone 2 with significant copper intercepts commencing from the base
of the gold oxide zone. The ongoing Resource development programme will continue
to build a gold oxide Resource but, the discovery of underlying copper-gold sulphide
mineralisation warrants testing both the depth of this new copper discovery and 
whether the gold oxide and copper-gold sulphide mineralisation extends to the south
and may potentially link up with the copper-gold JORC Resource announced in early
April 2017. Many of the holes intersecting copper sulphides below the gold oxides
were stopped in mineralisation and so this new zone of copper-gold sulphides is 
open at depth as well.

· Selected copper (‘Cu’) intercepts include:

o TGD-038: 34m @ 1.54% Cu from 56m

o TGD-041: 19m @ 1.1% Cu from 34m

o TGD-045: 17m @ 0.95% Cu from 24m

Further announcements will be made as additional gold and copper assay results are
received from the external laboratory over the next few weeks. When sufficient data
has been accumulated, the Company will complete a JORC Resource estimate for Gold
Zone 2 and an updated Copper Zone JORC Resource estimate that will include the latest
intersections.

> **Georgian Mining Corp Managing Director Greg Kuenzel said,** “The results from
> these 30 drill holes support our view that the three zones currently being targeted
> at KB are part of a much larger mineralised system. We have proven that gold mineralisation
> amenable to heap leach processing is present from surface to the base of oxidation
> down to 70m depth. Now we have also discovered a new copper sulphide mineralisation
> directly beneath the gold oxides. We anticipate being able to mine and treat the
> gold oxides which will expose the underlying copper sulphides, as we establish
> that the KB resources are part of a large epithermal copper-gold deposit.”

This campaign focused on the gold oxides is ongoing in parallel with Resource development
drilling of Copper Zone 1, where the Company recently announced a JORC compliant
resource estimate of 2.22 million tonnes @ 0.8% Cu and 0.1 g/t Au at a 0.3% Cu cut-
off.

Further Resource development will continue at KB with testing of possible extensions
to gold oxide mineralisation to the north and northeast and testing for further 
copper sulphide mineralisation beneath the oxides. There are also indications from
channel sampling and soil geochemistry that the original Copper Zone discovery and
the latest intersections at Gold Zone 2 may be joined at depth and part of a much
larger mineralised system. This will also be tested with further drilling to unite
the two mineralised bodies.

**Table 1: Gold Intersections for KB Gold Zone 2 Drill Programme**

  |  ID |  From (m) |  To (m) |  Interval (m) |  Au gt |  
 |  TGD001 |  1 |  8 |  7 |  0.71 |  
 |  TGD001 |  16 |  19.2 |  3.2 |  0.55 |  
 |  TGD002 |  5 |  19.2 |  14.2 |  2 |  
 |  TGD003 |  8 |  20 |  12 |  1.29 |  
 |  TGD004 |  9.5 |  12.3 |  2.8 |  0.27 |  
 |  TGD004 |  17 |  19 |  2 |  0.43 |  
 |  TGD005 |  no significant intervals |   |   |   |  
 |  TGD006 |  0 |  20 |  20 |  0.74 |  
 |  TGD007 |  0 |  20 |  20 |  2.2 |  
 |  TGD008 |  0 |  18 |  18 |  0.73 |  
 |  TGD009 |  0 |  4 |  4 |  1.07 |  
 |  TGD010 |  8.8 |  15 |  6.2 |  1.3 |  
 |  TGD011 |  0 |  20 |  20 |  0.63 |  
 |  TGD012 |  5.7 |  9.6 |  3.9 |  0.35 |  
 |  TGD013 |  0 |  20 |  20 |  0.22 |  
 |  TGD014 |  0 |  4 |  4 |  0.87 |  
 |  TGD014 |  11 |  13.2 |  2.2 |  0.35 |  
 |  TGD015 |  8 |  18 |  10 |  5.36 |  
 |  TGD016 |  0 |  3 |  3 |  0.2 |  
 |  TGD016 |  8 |  11 |  3 |  0.27 |  
 |  TGD017 |  0 |  3 |  3 |  2.04 |  
 |  TGD017 |  10 |  11.7 |  1.7 |  1.24 |  
 |  TGD017 |  17 |  19 |  2 |  0.18 |  
 |  TGD018 |  0 |  2 |  2 |  0.15 |  
 |  TGD019 |  4 |  8 |  4 |  0.53 |  
 |  TGD019 |  11 |  13 |  2 |  0.7 |  
 |  TGD019 |  15 |  20 |  5 |  0.93 |  
 |  TGD020 |  3 |  11 |  8 |  0.27 |  
 |  TGD021 |  4 |  17 |  13 |  0.25 |  
 |  TGD022 |  0 |  2 |  2 |  0.38 |  
 |  TGD022 |  14.2 |  19 |  4.8 |  0.31 |  
 |  TGD023 |  4 |  20 |  16 |  0.68 |  
 |  TGD024 |  4 |  7 |  3 |  0.37 |  
 |  TGD025 |  1 |  11.2 |  10.2 |  0.54 |  
 |  TGD026 |  0 |  7 |  7 |  0.2 |  
 |  TGD026 |  10 |  20 |  10 |  0.89 |  
 |  TGD028 |  no significant intervals |   |   |   |  
 |  TGD029 |  no significant intervals |   |   |   |  
 |  TGD030 |  0 |  6 |  6 |  1.55 |  
 |  TGD030 |  16 |  27 |  11 |  0.29 |  
 |  TGD031 |  8 |  18 |  10 |  0.18 |  
 |  TGD031 |  19 |  23.7 |  4.7 |  0.6 |  
 |  TGD031 |  27 |  33 |  6 |  0.85 |  
 |  TGD031 |  34.9 |  56 |  21.1 |  0.14 |  
 |  TGD032 |  2 |  21 |  19 0 |  0.74 |  
 |  TGD033 |  5 |  21 |  16 |  0.27 |  
 |  TGD033 |  21 |  30 |  9 |  0.57 |  
 |  TGD033 |  37 |  49 |  12 |  0.5 |  
 |  TGD033 |  50 |  70 |  20 |  0.23 |  
 |  TGD034 |  1 |  31.6 |  30.6 |  1.31 |  
 |  TGD035 |  15 |  16 |  1 |  0.43 |  
 |  TGD036 |  3 |  4 |  1 |  6.17 |  
 |  TGD037 |  5 |  11 |  6 |  4.63 |  
 |  TGD038 |  0 |  25 |  25 |  2.71 |  
 |  TGD038 |  37 |  46 |  9 |  0.52 |  
 |  TGD039 |  Not sampled |   |   |   |  
 |  TGD040 |  0 |  52 |  52 |  0.65 |  
 |  TGD042 |  6 |  8 |  2 |  1.19 |  
 |  TGD043 |  Results Pending |   |   |   |  
 |  TGD044 |  1 |  25 |  24 |  1.58 |  
 |  TGD044 |  30 |  46 |  16 |  0.71 |  
 |  TGD044 |  47 |  63 |  16 |  0.3 |

**Table 2: Copper Intersections for KB Gold Zone 2 Drill Program**

     |  ID |  From (m) |  To (m) |  Interval (m) |  Cu (%) |  
 |  TGD004 |  9.5 |  12.3 |  2.8 |  0.45 |  
 |  TGD011 |  0 |  20 |  20 |  1.13 |  
 |  TGD015 |  8 |  18 |  10 |  0.65 |  
 |  TGD031 |  34.9 |  56 |  21.1 |  0.15 |  
 |  TGD032 |  2 |  21 |  19 0 |  0.25 |  
 |  TGD032 |  38 |  57 |  19 |  0.19 |  
 |  TGD032 |  79 |  91 |  12 |  0.4 |  
 |  TGD034 |  52 |  75 |  23 |  0.4 |  
 |  TGD038 |  0 |  25 |  25 |  0.16 |  
 |  TGD038 |  25 |  47 |  22 |  0.23 |  
 |  TGD038 |  56 |  90 |  34 |  1.54 |  
 |  TGD038 |  100 |  111 |  11 |  0.84 |  
 |  TGD041 |  34 |  53 |  19 |  1.10 |  
 |  TGD044 |  47 |  63 |  16 |  15.36 |  
 |  TGD044 |  72 |  90 |  18 |  0.88 |  
 |  TGD044 |  99 |  102 |  3 |  0.44 |  
 |  TGD044 |  110 |  119 |  9 |  0.51 |

Share on:
