**[Fresnillo plc](https://www.directorstalkinterviews.com/ftse-company/fresnillo-plc/fres.l)**(
LON:FRES) has provided its third quarter production report for the three months 
ended 30 September 2020.

> **Octavio Alvídrez, Chief Executive Officer, said:**
> “The health and safety of our people remains our number one priority, in particular
> during these challenging times in the face of a global pandemic. I remain both
> proud and grateful for the efforts our people across all our sites have made and
> the resilience they have shown in adapting so quickly to the many measures we 
> have put in place to limit the spread of the virus. The progress we have made 
> at our Juanicipio development project in the Fresnillo district is testament to
> this. In the quarter, the first production stope at Juanicipio was completed on
> time and, as expected, we are now processing development ore at the Fresnillo 
> plant. We continue to implement the mine improvement initiatives we have previously
> outlined. Our silver mines are performing in line with the forecasts we set out
> at the beginning of the year and our silver production outlook is unchanged, despite
> the disruption of this pandemic. As we set out at our half-year results, we have
> seen some impact as a result of the additional working restrictions in place at
> the open-pit mines and this has affected our gold production, so we have marginally
> reduced our full-year guidance for gold. Our development projects remain on track,
> with the Pyrites Plant and optimisation of the beneficiation plant, both at Fresnillo,
> due for completion this year. Overall, Fresnillo has made good progress this year.”

_**COVID-19 UPDATE**_

We continue to closely monitor the spread of the virus and implement a range of 
safety measures across our business, following guidelines in accordance with the
World Health Organisation and Mexican authorities. This includes stringent monitoring&
hygiene, temperature screening, social distancing, and working from home for all
office-based colleagues. Those measures are ongoing and we remain vigilant to any
localised increase in COVID cases. Testing and contact tracing have proven to be
successful measures to identify potential cases and prevent the spread of the virus.
We continue to support our communities by providing food and personal protective
equipment. Fresnillo maintains an open dialogue with government officials at both
the Federal and local level.

**TOTAL PRODUCTION**

**HIGHLIGHTS**

**Silver**

•    Quarterly attributable silver production of 13.3 moz (including Silverstream),
down 2.3% vs. 2Q20 driven by a lower ore grade and volume of ore processed at Fresnillo,
mitigated by a higher ore grade at San Julián Disseminated Ore Body (DOB) and development
ore from Juanicipio being processed for the first time.

•    Quarterly attributable silver production (including Silverstream) remained 
flat vs. 3Q19 due to the higher ore grade at San Julián (DOB) and development ore
from Juanicipio being processed for the first time, offset by the lower volume of
ore processed at Fresnillo.

•     Year-to-date attributable silver production of 40.1 moz (including Silverstream),
down 1.8% vs. YTD19 due to the expected lower ore grade at Saucito, and to a lesser
extent, a decrease in volume of ore processed and lower ore grade at San Julián 
Veins and a lower contribution from the Silverstream, mitigated by the higher ore
grade at San Julián DOB and development ore from Juanicipio being processed for 
the first time.

**Gold**

•    Quarterly attributable gold production of 172.7 koz, down 6.3% vs. 2Q20, due
to the lower overall speed of recovery and ore grade at both Herradura and Noche
Buena. This resulted from the lower volumes of ore deposited in 2Q20 following the
COVID-19 operational restrictions, which affected the recovery cycle at the leaching
pads.

•    Quarterly and year-to-date attributable gold production decreased 17.7% and
13.7% vs. 3Q19 and YTD19 respectively due to a lower volume of ore processed at 
Herradura and Noche Buena as a result of COVID-19 related restrictions, as described
in the previous quarter.

**By-Products**

•    Quarterly attributable by-product lead and zinc production decreased 6.4% and
1.5% respectively vs. 2Q20, driven primarily by lower ore grades at Fresnillo, mitigated
by higher ore grades at Saucito.

•    Quarterly attributable by-product lead production decreased 2.7% vs. 3Q19 due
to a lower ore grade and volume of ore processed at Fresnillo, mitigated by a higher
ore grade at Saucito.

•    Quarterly attributable by-product zinc production increased 3.9% vs. 3Q19 due
to a higher ore grade at Saucito, offset by a lower volume of ore processed and 
ore grade at Fresnillo.

•     Year-to-date attributable by-product lead and zinc production increased 11.1%
and 11.7% vs. YTD19 respectively, mainly due to a higher ore grade at Saucito.

| Attributable | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| Silver (koz) | 12,572 | 12,944 | -2.9 | 12,624 | -0.4 | 38,063 | 38,633 | -1.5 | 
| Silverstream  (koz) |             709 |             648 | 9.4 | 659 | 7.6 | 2,037 | 2,207 | -7.7 | 
| Total Silver  (koz) | 13,281 | 13,592 | -2.3 | 13,283 | -0.0 | 40,100 | 40,840 | -1.8 | 
| Gold (oz) | 172,718 | 184,356 | -6.3 | 209,752 | -17.7 | 554,037 | 642,169 | -13.7 | 
| Lead (t) | 15,144 | 16,180 | -6.4 | 15,561 | -2.7 | 45,229 | 40,725 | 11.1 | 
| Zinc (t) | 26,320 | 26,726 | -1.5 | 25,340 | 3.9 | 75,701 | 67,746 | 11.7 |

**DEVELOPMENT PROJECTS**

•    As expected, Juanicipio concluded the preparation of its first production stope
and development ore was processed at the Fresnillo plant during the third quarter.
Further progress was achieved on the construction of the Juanicipio processing plant,
which is expected to start commissioning by mid-2021.

•    Construction of the Pyrites plant (phase II) at the Fresnillo district is almost
concluded. However, as previously announced, there could be a possible delay in 
final inspections by the authorities due to COVID-19 restrictions, which could defer
start-up to the end of 2020.

•     The Fresnillo flotation plant optimisation to cope with higher content of 
lead and zinc is progressing according to plan and is expected to be concluded on
time during 4Q20.

**2020 OUTLOOK**

2020 silver production guidance remains in the range of 51 to 56 moz (including 
Silverstream) while gold production is now expected to be in a range of 745 to 775
koz (previously 785 to 815 koz) as a result of the reduced number of mine operators
at Herradura due to COVID-19 preventive measures to protect the vulnerable personnel
and lower than expected ore grades at the Dynamic Leaching Plant, together with 
restricted access to deeper areas at the Noche Buena mine.

**MINING OPERATIONS**

**FRESNILLO MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed** (t) | 551,589 | 596,115 | -7.5 | 648,646 | -15.0 | 1,746,494 | 1,842,845 | -5.2 | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Silver (koz) | 3,085 | 3,611 | -14.6 |  3,408 | -9.5 | 9,841 |  9,815 | 0.3 | 
| Gold  (oz) | 9,295 | 10,828 | -14.2 |  15,601 | -40.4 | 28,903 |  40,535 | -28.7 | 
| Lead (t) | 4.588 | 6,860 | -33.1 |  7,037 | -34.8 | 16,065 |  15,806 | 1.6 | 
| Zinc (t) | 7,328 | 10,978 | -33.3 |  10,225 | -28.3 | 25,064 |  22,182 | 13.0 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Silver (g/t) | 193 | 209 | -7.5 | 183 | 5.7 | 195 | 186 | 5.2 | 
| Gold (g/t) | 0.77 | 0.79 | -2.8 | 0.99 | -22.5 | 0.73 | 0.91 | -19.1 | 
| Lead (%) | 0.95 | 1.33 | -28.3 | 1.24 | -23.2 | 1.08 | 0.99 | 9.0 | 
| Zinc (%) | 1.83 | 2.55 | -28.0 | 2.14 | -14.3 | 2.03 | 1.70 | 19.3 |

Quarterly silver production was down 14.6% vs. 2Q20 as a result of a decrease in
the volume of ore processed driven by a reduced number of personnel on site following
COVID-19 preventive measures, which has affected development rates and equipment
availability.  Silver production was also impacted by the expected lower ore grade,
in accordance with the mine plan.

Quarterly silver production decreased 9.5% vs. 3Q19 driven by a lower volume of 
ore processed for reasons mentioned above, mitigated by a higher ore grade resulting
from a combination of incremental improvements achieved following the implementation
of our action plan, as set out at the end of last year and further described below.

Year-to-date silver production remained flat vs. YTD19 due to the higher ore grade
for reasons mentioned below, offset by a lower volume of ore processed due to COVID-
19 preventive measures.

Our performance improvement plan, as set out on the Capital Markets Day in December
2019, continues to be implemented, focusing on controlling dilution and enhancing
blasting and drilling techniques to cope with the narrower veins.

Development rates decreased to an average of 2,878m per month in 3Q20 (2Q20: 3,118m
per month), due to absenteeism resulting from COVID-19 preventive measures. Year
to date, development rates remained at a similar level vs. YTD19 (3,060m per month
vs. 3,071m per month) as the contractor hired at the end of 2019, together with 
the start-up of the tunnel boring machine, have mitigated the negative impact of
the higher absenteeism. We expect an increase in development rates from current 
levels to approximately 3,300m per month by the end of 2020 as absenteeism decreases
but at a slower rate than anticipated.

Quarterly by-product gold production decreased 14.2% vs. 2Q20 driven by a lower 
volume of ore processed and, to a lesser extent, lower recovery rate.

Quarterly and year-to-date by-product gold production decreased 40.4% and 28.7% 
vs. 3Q19 and YTD19 respectively due to lower ore grades, lower volumes of ore processed
and lower recovery rates.

The silver ore grade for 2020 continues to be in the range of 185-200 g/t, while
the gold ore grade is estimated to remain around 0.7 g/t.

**SAUCITO MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed **(t) | 710,618 | 715,338 | -0.7 | 703,002 | 1.1 | 2,096,003 | 2,030,675 | 3.2 | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Silver (koz) | 3,963 | 4,098 | -3.3 |  4,040 | -1.9 | 12,104 |  12,879 | -6.0 | 
| Gold (oz) | 20,105 | 20,398 | -1.4 |  21,096 | -4.7 | 61,679 |  57,812 | 6.7 | 
| Lead (t) | 7,267 | 6,255 | 16.2 |  4,906 | 48.1 | 19,239 |  15,345 | 25.4 | 
| Zinc (t) | 10,993 | 8,842 | 24.3 |  6,655 | 65.2 | 28,736 |  21,707 | 32.4 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Silver (g/t) | 207 | 207 | 0.2 | 207 | 0.3 | 209 | 230 | -9.0 | 
| Gold (g/t) | 1.14 | 1.15 | -0.7 | 1.22 | -6.0 | 1.18 | 1.16 | 1.7 | 
| Lead (%) | 1.21 | 1.04 | 15.9 | 0.84 | 43.9 | 1.08 | 0.90 | 20.5 | 
| Zinc (%) | 2.24 | 1.82 | 23.2 | 1.38 | 63.0 | 1.98 | 1.55 | 27.8 |

Quarterly silver production decreased 3.3% vs. 2Q20 due to a marginally lower recovery
rate.

Quarterly silver production decreased 1.9% vs. 3Q19 as a result of a slightly lower
recovery rate, mitigated by a marginally higher volume of ore processed.

As seen in previous quarters and in line with our expectations, year-to-date silver
production decreased 6.0% vs. YTD19 as a result of the gradual depletion of higher
ore grade areas at the Jarillas vein. This decline was mitigated by a higher volume
of ore processed.

Quarterly by-product gold production decreased 1.4% and 4.7% vs. 2Q20 and 3Q19 mainly
due to a lower ore grade.

Year-to-date gold production increased 6.7% vs. YTD19 due to a higher volume of 
ore processed, and to a lesser extent, higher ore grade and recovery rate.

The silver ore grade is expected to decrease significantly in 4Q20 in accordance
with the mine plan as a higher portion of material will be processed from several
Western areas with lower silver grade. However, the silver ore grade for 2020 continues
to be in the range of 200-220 g/t, while the gold ore grade is now estimated to 
be around 1.2 g/t.

**PYRITES PLANT (PHASE I)**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Iron Concentrates Processed **(t) | 43,871 | 39,049 | 12.6 | 38,572 | 13.7 | 124,373 | 125,557 | -1.0 | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Silver (koz) | 221 | 249 | -11.2 | 285 | -22.3 | 726 | 923 | -21.3 | 
| Gold (oz) | 837 | 924 | -9.4 | 954 | -12.3 | 2,632 | 3,270 | -19.5 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Silver (g/t) | 212 | 261 | -18.7 | 314 | -32.4 | 238 | 308 | -22.6 | 
| Gold (g/t) | 1.87 | 2.10 | -11.0 | 2.44 | -23.2 | 2.02 | 2.35 | -13.8 |

Quarterly silver and gold production decreased 11.2% and 9.4% vs. 2Q20 respectively
due to a lower ore grade of iron concentrates produced by Saucito and to a lesser
extent, lower recovery rate, mitigated by a higher volume of iron concentrates processed.

Quarterly silver and gold production decreased 22.3% and 12.3% vs. 3Q19 respectively
as expected and as seen in the prior quarter. This was primarily due to a lower 
ore grade from Saucito’s flotation plant, as material from the pre-operative high
grade stockpile was depleted following the plant’s start-up in mid-2018, mitigated
by a higher volume of iron concentrates processed.

Year-to-date silver production decreased 21.3% vs. YTD19 due to a lower ore grade
of iron concentrates produced by Saucito.

Similarly, year-to-date gold production decreased 19.5% vs. YTD19 as a result of
a lower ore grade and lower recovery rate.

We continue to expect this plant to recover around 1 moz silver and 3 koz gold from
the ongoing Saucito tailings during 2020.

**CIENEGA ****MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed **(t) | 325,392 | 331,543 | -1.9 | 335,493 | -3.0 | 983,285 | 985,600 | -0.2 | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Gold  (oz) | 18,122 | 15,948 | 13.6 | 17,858 | 1.5 | 50,496 | 47,615 | 6.1 | 
| Silver (koz) | 1,522 | 1,573 | -3.3 | 1,384 | 9.9 | 4,491 | 4,304 | 4.3 | 
| Lead (t) | 1,536 | 1,489 | 3.1 | 1,826 | -15.9 | 4,772 | 4,160 | 14.7 | 
| Zinc (t) | 2,275 | 2,324 | -2.1 | 2,755 | -17.4 | 7,185 | 6,597 | 8.9 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Gold (g/t) | 1.85 | 1.61 | 15.4 | 1.78 | 4.2 | 1.72 | 1.63 | 5.5 | 
| Silver (g/t) | 169 | 172 | -1.3 | 151 | 12.4 | 165 | 159 | 3.9 | 
| Lead (%) | 0.71 | 0.69 | 4.2 | 0.81 | -11.7 | 0.74 | 0.65 | 13.6 | 
| Zinc (%) | 1.18 | 1.19 | -1.1 | 1.35 | -13.2 | 1.22 | 1.12 | 8.8 |

Quarterly gold production increased 13.6% vs. 2Q20 as a result of a higher ore grade.
This was driven by the higher proportion of material extracted from the Eastern 
zone of the district with higher gold content but lower silver content.

Quarterly silver production decreased 3.3% vs. 2Q20 due to lower volumes of ore 
processed and lower ore grade.

Quarterly gold production increased 1.5% vs. 3Q19 due to a higher ore grade, offset
by a lower volume of ore processed.

Quarterly silver production increased 9.9% vs. 3Q19 as a result of a higher ore 
grade in line with the mine plan.

Year-to-date gold and silver production increased 6.1% and 4.3% vs. YTD19 respectively
primarily due to the higher ore grades.

The gold and silver ore grades for 2020 are expected to remain at around 1.65-1.75
g/t and 155-165 g/t respectively.

**SAN JULIÁN ****MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed  Veins **(t) | 317,134 | 312,796 | 1.4 | 321,798 | -1.5 | 939,107 | 983,478 | -4.5 | 
| **Ore Processed  DOB **(t) | 555,161 | 559,564 | -0.8 | 559,693 | -0.8 | 1,656,650 | 1,667,567 | -0.7 | 
|   |   |   |   |   |   |   |   |   | 
| Total production at San Julián |   |   |   |   |   |   |   |   | 
| Gold (oz**)** | 17,342 | 16,361 | 6.0 | 14,234 | 21.8 | 48,877 | 50,677 | -3.6 | 
| Silver (koz) | 3,298 | 3,104 | 6.3 | 3,080 | 7.1 | 9,576 | 9,622 | -0.5 | 
|   |   |   |   |   |   |   |   |   | 
| Production Veins |   |   |   |   |   |   |   |   | 
| Gold (oz) | 16,426 | 15,658 | 4.9 | 13,711 | 19.8 | 46,667 | 49,010 | -4.8 | 
| Silver (koz) | 944 | 1,047 | -9.9 | 1,035 | -8.8 | 3,065 | 3,365 | -8.9 | 
|   |   |   |   |   |   |   |   |   | 
| Production DOB |   |   |   |   |   |   |   |   | 
| Gold (oz) | 917 | 703 | 30.3 | 523 | 75.2 | 2,209 | 1,666 | 32.6 | 
| Silver (koz) | 2,355 | 2,057 | 14.5 | 2,045 | 15.1 | 6,511 | 6,257 | 4.1 | 
| Lead (t) | 1,676 | 1,576 | 6.3 | 1,792 | -6.5 | 5,076 | 5,413 | -6.2 | 
| Zinc (t) | 5,627 | 4,581 | 22.8 | 5,705 | -1.4 | 14,618 | 17,261 | -15.3 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades Veins |   |   |   |   |   |   |   |   | 
| Gold (g/t) | 1.71 | 1.63 | 5.1 | 1.39 | 23.2 | 1.62 | 1.62 | -0.1 | 
| Silver (g/t) | 100 | 113 | -11.1 | 108 | -7.0 | 110 | 116 | -4.8 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades DOB |   |   |   |   |   |   |   |   | 
| Gold (g/t) | 0.10 | 0.08 | 20.1 | 0.07 | 45.2 | 0.09 | 0.08 | 14.7 | 
| Silver (g/t) | 154 | 134 | 15.3 | 130 | 18.7 | 143 | 135 | 6.0 | 
| Lead (%) | 0.39 | 0.37 | 5.4 | 0.41 | -4.1 | 0.39 | 0.43 | -7.9 | 
| Zinc (%) | 1.27 | 1.08 | 18.0 | 1.35 | -6.1 | 1.16 | 1.38 | -16.1 |

**SAN JULIÁN VEINS**

Quarterly silver production decreased 9.9% and 8.8% vs. 2Q20 and 3Q19 respectively,
primarily due to a lower ore grade resulting from the depletion of high ore grade
areas at San Julián and Shalom.

Gold production increased 4.9% vs. 2Q20 driven by a higher ore grade.

Quarterly gold production increased 19.8% vs. 3Q19 mainly due to access to new areas
with higher gold ore grades.

Year-to-date silver and gold production decreased 8.9% and 4.8%, respectively vs.
YTD19 as a result of a lower volume of ore processed following the depletion of 
the stockpile, as described in prior quarters and lower ore grades driven by the
depletion of high ore grade areas at San Julián and Shalom.

We continue to expect the 2020 silver and gold ore grades to remain flat year on
year, averaging 110-120 g/t and 1.6-1.7 g/t, respectively.

**SAN JULIÁN DISSEMINATED ORE BODY (DOB)**

Quarterly and year-to-date silver production increased against all comparable periods
due to a higher ore grade. As previously mentioned, the mine sequencing was changed
in 2019 to maintain the geotechnical stability of some high ore grade stopes. During
3Q20, we regained access to these higher quality areas, resulting in the higher 
ore grades.

The silver ore grade for 2020 is expected to remain within a range of 140-150 g/
t.

**HERRADURA TOTAL MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed** (t) | 4,791,585 | 3,283,104 | 45.9 | 5,591,746 | -14.3 | 12,921,867 | 16,753,610 | -22.9 | 
| **Total Volume Hauled **(t) | 28,017,785 | 18,942,659 | 47.9  | 33,396,651 | -16.1 | 80,801,385 | 94,629,850 | -14.6  | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Gold (oz) | 85,102 | 95,253 | -10.7 | 102,439 | -16.9 | 290,848 | 339,305 | -14.3 | 
| Silver (koz) | 251 | 300 | -16.3 | 412 | -39.1 | 1,075 | 1,045 | 2.8 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Gold (g/t) | 0.72 | 0.90 | -20.1 | 0.71 | 1.9 | 0.78 | 0.79 | -0.5 | 
| Silver (g/t) | 2.18 | 3.28 | -33.3 | 3.27 | -33.1 | 3.21 | 2.89 | 11.3 |

Quarterly gold production decreased 10.7% vs. 2Q20 mainly due to a lower overall
speed of recovery. This resulted mainly from the lower volumes of ore deposited 
in 2Q20 following the COVID-19 operational restrictions, which affected the recovery
cycle at the leaching pads. Additionally, the measures put in place to maintain 
social distancing have resulted in a decreased number of personnel on site, thus
affecting the preparation of the mine. This has limited access to deeper areas of
the pit, thus impacting the mine plan. The lower ore grade and a slowdown in the
leaching kinetic due to the presence of more sulphides in the areas mined further
impacted quarterly gold production. These negative factors were mitigated by the
higher volume of ore processed as operations ramped up in 3Q20 following the COVID-
19 operational restrictions in 2Q20.

Quarterly gold production decreased 16.9% vs. 3Q19 as a result of a lower volume
of ore deposited during the COVID-19 operational restrictions. Additionally, the
previously described effect on the recovery cycle also affected quarterly gold production.
Nevertheless, the aforementioned factors were partially compensated by the higher
ore grade in 3Q20.

Year-to-date gold production decreased 14.3% vs. YTD19 as a result of the lower 
volume of ore processed for reasons explained above. However, these factors were
mitigated by the higher speed of recovery following the commissioning of leaching
pad number 13 in mid-2019 and an increased irrigation in new areas of the pads.

The gold ore grade is expected to remain around 0.75-0.80 g/t during 2020.

**NOCHE BUENA TOTAL MINE PRODUCTION**

|   | 3Q20 | 2Q20 | % Change | 3Q19 | % Change | YTD 20 | YTD 19 | % Change | 
| **Ore Processed **(t) | 1,714,258 | 1,366,909 | 25.4 | 3,215,167 | -46.7 | 5,044,312 | 9,790,495 | -48.5 | 
| **Total Volume Hauled** (t) | 9,937,248 | 5,612,622 | 77.1 | 11,447,273 | -13.2 | 25,654,647 | 37,562,882 | -31.7 | 
|   |   |   |   |   |   |   |   |   | 
| Production |   |   |   |   |   |   |   |   | 
| Gold (oz) | 21,574 | 24,643 | -12.5 | 37,570 | -42.6 | 70,261 | 102,956 | -31.8 | 
| Silver (koz) | 11 | 9 | 19.4 | 14 | -22.4 | 30 | 43 | -30.9 | 
|   |   |   |   |   |   |   |   |   | 
| Ore Grades |   |   |   |   |   |   |   |   | 
| Gold (g/t) | 0.49 | 0.54 | -8.0 | 0.58 | -15.4 | 0.52 | 0.55 | -4.6 | 
| Silver (g/t) | 1.25 | 0.54 | 130.4 | 0.25 | 391.8 | 0.68 | 0.23 | 191.9 |

Quarterly gold production decreased 12.5% vs. 2Q20 due to a lower overall speed 
of recovery. This resulted from the lower volumes of ore deposited in 2Q20 following
the COVID-19 operational restrictions, which affected the recovery cycle at the 
leaching pads. The increased waste material hauled to solve a stability problem 
in the south slope of the pit restricted access to the deeper areas of the mine 
and further impacted gold production. This was mitigated by the higher volume of
ore processed as operations ramped up following the COVID-19 operational restrictions
in 2Q20.

Quarterly and year-to-date gold production decreased 42.6% and 31.8% vs. 3Q19 and
YTD19 respectively driven by the lower volume of ore deposited, for reasons explained
above, in addition to the expected depletion of the mine as it approaches closure.
These were mitigated by the higher speed of recovery due to increased irrigation
on the pads and the installation of the carbon columns in 2019.

The expected gold ore grade is predicted to remain in the range of 0.50-0.55 g/t
in 2020.

**SILVERSTREAM**

Quarterly Silverstream production increased 9.4% vs. 2Q20 due to higher ore grades,
increased ore throughput and an improved recovery rate.

Quarterly Silverstream production increased 7.6% vs. 3Q19 due to a higher recovery
rate and higher volume of ore processed.

Year-to-date Silverstream production decreased 7.7% vs. YTD19 due to lower volume
of ore processed and the expected lower ore grade resulting from narrower veins,
as described in previous quarters, which were partially compensated for by a higher
recovery rate.

Expected silver production in 2020 remains in the range of 2.7-3.0 moz.

**SAFETY PERFORMANCE**

We are deeply saddened to confirm a fatal accident at the Fresnillo mine during 
the quarter. A full independent investigation is being carried out with additional
preventive measures put in place and support offered to family and colleagues. We
remain absolutely committed to instilling a new safety culture across our mines 
and the rolling out of the I Care We Care programme.

**JUANICIPIO**

As planned, development ore from the Juanicipio project began to be processed at
the Fresnillo beneficiation plant, with 42,476 tonnes processed during the quarter.
Total production was 394 thousand silver ounces, 610 gold ounces, 138 tonnes of 
lead and 174 tonnes of zinc (attributable: 220 thousand ounces of silver, 341 ounces
of gold, 77 tonnes of lead and 97 tonnes of zinc).

The preparation of the first production stope was concluded during the quarter and
further progress was achieved in the construction of the beneficiation plant with
the foundations for the milling area.

We expect to process an average of 16,000 tonnes per month through to mid-2021 on
a consolidated basis, at which time we expect to start commissioning the Juanicipio
beneficiation plant.

**UPDATE ON EXPLORATION**

During 3Q20, 132,000 metres of drilling were completed at our operating mines, as
part of the 456,000 metre programme to convert resources into reserves. Additionally,
60,000 metres of exploration drilling were carried out, as part of the 228,000 metre
programme at projects.

Presently, drilling is taking place across ten areas. Interesting results were obtained
at Fresnillo, Guanajuato and Supaypacha (Peru), on the new mineralised zones identified
during the first half of this year; at the San Julián district, drilling continues
on the southern vein system for resource conversion into reserves. In Chile, drilling
resumed focusing on several targets in the Antofagasta and Coquimbo regions. Negotiations
with communities to obtain drilling access permits continues across several projects
in Mexico and Peru in a respectful and fair manner.

A fuller update on our exploration programme, together with the audited reserves
and resources statements, will be provided alongside our preliminary results.