# Fresnillo PLC robust production performance

- Link: https://www.directorstalkinterviews.com/fresnillo-plc-robust-production-performance/412755384
- Published: 2018-07-25T11:19:02+01:00
- Author: Charlotte Edwards

**[Fresnillo PLC](https://www.directorstalkinterviews.com/ftse-company/fresnillo-plc/fres.l)**(
LON:FRES), production report for the three months ended 30th June 2018

**Overview**

· Quarterly and first half silver production (including Silverstream), up 5.7% and
9.7% respectively over the corresponding periods in 2017 primarily due to the start
up of operations at San Julián JM (Phase II) in July 2017.

· Quarterly gold production of 234 koz, up 4.6% vs. 2Q17 due to the higher ore grade,
throughput and recovery rate at Saucito and the higher ore grades at Noche Buena,
Herradura and Fresnillo.

· First half gold production of 465 koz up 4.4% vs. 1H17, due to the ongoing decrease
in gold inventories and higher ore grade at Herradura and higher volume of ore processed
and ore grade at Saucito.

· Ongoing tests at the Herradura leaching pads have resulted in an increase of 98.9
koz of gold in the inventory as of 1 January 2018.

· Full year consolidated production guidance has been revised marginally: total 
gold production to 900 – 930 koz (previously 870 – 900 koz) and total silver production
to 64.5 – 67.5 moz (previously 67 – 70 moz) including Silverstream.

> **Octavio Alvídrez, Chief Executive Officer, said:**
> “I am pleased to report a robust production performance in the first half. In 
> line with our strategy, we continue to actively manage and strengthen our asset
> portfolio. In particular during the period we have successfully ramped up our 
> new San Julián JM mine to full capacity which has made a significant contribution
> to overall production. We have also made good progress with our development pipeline,
> with our two main projects now complete. The Pyrites Plant has been commissioned
> and final testing at the Second Dynamic Leaching Plant is on track. Both projects
> will make a meaningful contribution to overall 2018 production.
> We have adjusted our full year production guidance to reflect a better than anticipated
> gold performance due mainly to the ongoing reduction of inventories at Herradura
> and slightly lower than expected silver production due mainly to issues associated
> with less availability of process water at San Julián. Overall however, our full
> year consolidated guidance in silver equivalent ounces remains unchanged”.

**Total Production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Silver (koz)

  |

14,459

  |

13,328

  |

8.5

  |

14,235

  |

28,694

  |

25,752

  |

11.4

  |  
 |

Silverstream  (koz)

  |

884

  |

1,188

  |

-25.6

  |

1,186

  |

2,070

  |

2,292

  |

-9.7

  |  
 |

Total Silver  (koz)

  |

15,343

  |

14,515

  |

5.7

  |

15,421

  |

30,764

  |

28,044

  |

9.7

  |  
 |

Gold (oz)

  |

233,841

  |

223,479

  |

4.6

  |

231,458

  |

465,299

  |

445,769

  |

4.4

  |  
 |

Lead (t)

  |

13,223

  |

11,385

  |

16.1

  |

11,629

  |

24,853

  |

22,846

  |

8.8

  |  
 |

Zinc (t)

  |

22,014

  |

14,919

  |

47.6

  |

19,040

  |

41,054

  |

28,725

  |

42.9

  |

 

**Silver**

Quarterly and first half silver production (including Silverstream) increased 5.7%
and 9.7% vs. the corresponding periods in 2017 mainly as a result of the start of
operations at San Julián JM (Phase II) in July 2017. This was partially offset by
lower ore grades at Fresnillo and Saucito and the expected lower ore grade at the
San Julián Veins (Phase I).

The Silverstream contribution decreased as expected due to the lower silver ore 
grade at the Sabinas mine.

Quarterly silver production increased 1.6% vs. 1Q18 as a result of the higher volume
of ore processed at Saucito and the higher grades at Ciénega and San Julián JM (
Phase II). These factors compensated for the lower ore grades at the San Julián 
Veins (Phase I) and at Fresnillo.

**Gold**

Quarterly gold production increased 4.6% vs. 2Q17 as a result of the higher ore 
grade, volume of ore processed and recovery rate at Saucito and the higher ore grades
at Noche Buena, Herradura and Fresnillo. These were partially offset by the lower
ore grade at Ciénega.

First half gold production increased 4.4% vs. 1H17 as a result of the ongoing decrease
of inventories and higher ore grade at Herradura in addition to higher ore grade
and volume of ore processed at Saucito. These factors more than compensated for 
the lower ore grade at Ciénega and San Julián Veins (Phase I).

Quarterly gold production remained broadly flat vs. 1Q18 (+1.0%) as a result of 
the higher ore grade, volume of ore processed and recovery at Saucito and the marginally
higher volume of ore processed and ore grade at Noche Buena which compensated for
the lower volume of ore processed and speed of recovery at Herradura.

**Outlook**

2018 full year consolidated production guidance has been revised marginally: total
gold production guidance is now 900-930 thousand ounces compared to our original
guidance of 870-900 thousand ounces and total silver production guidance (including
Silverstream) is 64.5-67.5 million ounces compared to our original guidance of 67-
70 million ounces. In the case of gold production, we are slightly increasing our
guidance to align production rates to the ongoing reduction of inventories at Herradura’s
leaching pads. In the case of silver production, we are marginally decreasing guidance
to reflect the now expected lower production from San Julián resulting from a temporary
re-sequencing of the production plan and higher input of stockpile ore to deal with
issues associated with less availability of process water. The construction of the
water reservoir, aimed at providing a consistent source of water to reduce this 
risk, has been delayed as a result of a longer than expected permitting process.
Full year consolidated production guidance, in equivalent silver ounces, remains
broadly the same as our original guidance.

**By-products**

Quarterly by-product lead production increased 16.1% vs. 2Q17 as a result of the
start up of operations at San Julián JM (Phase II) in July 2017 and the higher volume
of ore processed and ore grade at Saucito which compensated for the lower ore grade
and recovery rate at Ciénega.

Year to date by-product lead production increased 8.8% vs. 1H17 as a result of the
start up of San Julián JM (Phase II) and the higher ore grade at Fresnillo. These
factors more than offset the lower ore grade and recovery rate at Ciénega and the
lower ore grade at Saucito.

Quarterly by-product lead production increased 13.7% vs. 1Q18 as a result of the
higher volume of ore processed, ore grade and recovery rate at Saucito which partially
offset the lower ore grade at Fresnillo.

Quarterly by-product zinc production increased 47.6% vs. 2Q17 as a result of San
Julián JM (phase II) commencing operations in July 2017, and a higher ore grade,
recovery rate and volume of ore processed at Saucito. These were partially offset
by the lower ore grade and recovery rate at Ciénega.

Half year by-product zinc production increased vs. 1H17 as a result of the start
up of operations at San Julián JM (Phase II), the higher ore grade at Fresnillo 
and higher ore grade, recovery rate and volume of ore processed at Saucito. These
factors more than compensated for the lower ore grade and recovery rate at Ciénega.

Quarterly by-product zinc production increased 15.6% vs. 1Q18 as a result of higher
ore grade, volume of ore processed and recovery rate at Saucito which more than 
compensated for the lower ore grade at Fresnillo.

**Fresnillo mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed(t)

  |

620,906

  |

645,479

  |

-3.8

  |

637,410

  |

1,258,316

  |

1,258,492

  |

-0.0

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Silver (koz)

  |

3,793

  |

4,491

  |

-15.5

  |

4,336

  |

8,129

  |

8,930

  |

-9.0

  |  
 |

Gold  (oz)

  |

10,953

  |

9,403

  |

16.5

  |

10,431

  |

21,384

  |

20,728

  |

3.2

  |  
 |

Lead (t)

  |

5,052

  |

4,982

  |

1.4

  |

5,783

  |

10,835

  |

10,153

  |

6.7

  |  
 |

Zinc (t)

  |

7,979

  |

7,927

  |

0.7

  |

8,866

  |

16,846

  |

14,634

  |

15.1

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Silver (g/t)

  |

211

  |

235

  |

-10.1

  |

232

  |

222

  |

240

  |

-7.5

  |  
 |

Gold (g/t)

  |

0.70

  |

0.59

  |

19.3

  |

0.66

  |

0.68

  |

0.66

  |

2.6

  |  
 |

Lead (%)

  |

0.90

  |

0.86

  |

4.9

  |

1.00

  |

0.95

  |

0.89

  |

7.1

  |  
 |

Zinc (%)

  |

1.74

  |

1.69

  |

3.1

  |

1.90

  |

1.82

  |

1.63

  |

11.7

  |

 

Quarterly silver production decreased 15.5% and 12.5% vs. 2Q17 and 1Q18 respectively
mainly due to the lower than expected ore grades in certain areas and the temporary
limited access to higher ore grade areas at San Alberto, Candelaria and Santa Elena.

The temporary restricted access to higher grade areas of the mine was a result of
the delays in development and mine preparation following lower than expected productivity
from contractors. This was due to a high turnover of contractor personnel which 
has a knock-on effect of delaying the maintanance programme thereby resulting in
lower equipment availability. To mitigate this, the Company is looking to: i) add
a new contractor; ii) review, adapt and improve the maintanance programme; and iii)
purchase additional equipment, to be operated by our own team alongside our contractors,
in order to provide us with higher degree of control to increase development rates
and mine preparation.

Silver production at the Fresnillo mine has shown a positive trend increasing from
7,579 koz in the 2H16 to 8,129 in the 1H18, a +7.2% increase. However, we have been
below our production targets which we are confident will be achieved in the near
future once we overcome the contractors productivity shortcomings.

The silver grade for the full year is expected to be 215-225 g/t (previously 235
g/t) whilst going forward, the long term grade is expected to remain approximately
260 g/t.

First half silver production decreased vs. 1H17 as a result of the lower ore grade
and, to a lesser extent, lower recovery rate.

Quarterly by product gold production increased vs. 2Q17 and 1Q18 due to the higher
ore grades which compensated for the lower volumes of ore processed. Similarly, 
year to date by-product gold production increased 3.2% vs. 1H17 mainly due to higher
ore grade.

Quarterly and first half by-product lead production increased vs. 2Q17 and 1H17 
as a result of higher ore grades.

Quarterly by-product lead and zinc production decreased 12.6% and 10.0% vs. 1Q18
respectively, due to the lower ore grade and volume of ore processed.

Quarterly by-product zinc production remained at a similar level vs. 2Q17. First
half by-product zinc production increased 15.1% vs. 1H17 as a result of higher ore
grade and to a lesser extent, improved recovery rate.

**Saucito mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed (t)

  |

723,208

  |

667,456

  |

8.3

  |

673,545

  |

1,396,753

  |

1,338,370

  |

4.4

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Silver (koz)

  |

5,235

  |

5,674

  |

-7.7

  |

4,832

  |

10,067

  |

10,821

  |

-7.0

  |  
 |

Gold (oz)

  |

22,908

  |

15,896

  |

44.1

  |

16,880

  |

39,788

  |

33,859

  |

17.5

  |  
 |

Lead (t)

  |

5,327

  |

4,688

  |

13.6

  |

3,183

  |

8,510

  |

9,442

  |

-9.9

  |  
 |

Zinc (t)

  |

7,549

  |

4,923

  |

53.3

  |

3,916

  |

11,465

  |

10,062

  |

13.9

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Silver (g/t)

  |

263

  |

306

  |

-14.1

  |

260

  |

262

  |

293

  |

-10.6

  |  
 |

Gold (g/t)

  |

1.28

  |

1.05

  |

22.7

  |

1.12

  |

1.20

  |

1.08

  |

11.2

  |  
 |

Lead (%)

  |

0.86

  |

0.81

  |

6.2

  |

0.57

  |

0.72

  |

0.84

  |

-14.6

  |  
 |

Zinc (%)

  |

1.64

  |

1.26

  |

30.1

  |

0.96

  |

1.31

  |

1.26

  |

4.0

  |

 

Quarterly and year to date silver production decreased 7.7% and 7.0% vs. 2Q17 and
1H17 respectively as a result of lower than expected ore grades and increased dilution.
We are now using smaller sized equipment for the narrower veins in order to decrease
dilution in these areas.

Quarterly silver production however increased 8.3% vs. 1Q18 as a result of the higher
volume of ore processed.

The silver ore grade for the full year 2018 is now expected to be 255-265 g/t (285
g/t previously guided) whilst going forward, the long term silver grade is expected
to be approximately 280 g/t.

Quarterly and first half by-product gold production increased 44.1%, 35.7% and 17.5%
vs. 2Q17, 1Q18 and 1H17 respectively as a result of higher ore grades, recovery 
rates and volumes of ore processed.

Quarterly by-product lead production increased 13.6% vs. 2Q17 as a result of higher
volume of ore processed and a higher ore grade. However, year to date by-product
lead production decreased 9.9% vs. 1H17 as a result of a lower ore grade. Quarterly
by-product lead production increased 67.3% vs. 1Q18 as a result of a higher ore 
grade, volume of ore processed and recovery rate.

Quarterly and year to date by-product zinc production increased over the corresponding
periods of 2017 and vs. the previous quarter as a result of higher ore grades, recovery
rates and volumes of ore processed.

**Ciénega mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed (t)

  |

330,879

  |

322,760

  |

2.5

  |

320,006

  |

650,885

  |

636,680

  |

2.2

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold  (oz)

  |

16,689

  |

18,904

  |

-11.7

  |

16,377

  |

33,066

  |

36,358

  |

-9.1

  |  
 |

Silver (koz)

  |

1,518

  |

1,458

  |

4.1

  |

1,239

  |

2,757

  |

2,786

  |

-1.0

  |  
 |

Lead (t)

  |

1,352

  |

1,715

  |

-21.2

  |

1,335

  |

2,687

  |

3,251

  |

-17.3

  |  
 |

Zinc (t)

  |

1,231

  |

2,070

  |

-40.5

  |

1,006

  |

2,237

  |

4,030

  |

-44.5

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (g/t)

  |

1.65

  |

1.89

  |

-12.7

  |

1.66

  |

1.66

  |

1.89

  |

-12.5

  |  
 |

Silver (g/t)

  |

166

  |

161

  |

3.5

  |

141

  |

154

  |

161

  |

-4.2

  |  
 |

Lead (%)

  |

0.67

  |

0.78

  |

-14.2

  |

0.67

  |

0.67

  |

0.78

  |

-14.3

  |  
 |

Zinc (%)

  |

0.77

  |

1.10

  |

-29.9

  |

0.72

  |

0.74

  |

1.08

  |

-31.4

  |

 

Quarterly and year to date gold production decreased 11.7% and 9.1% respectively
vs. their corresponding periods of 2017 primarily due to the lower than expected
ore grade following the depletion of higher grade veins at Taspana, Las Casas and
San Ramón. This was mitigated by the higher volume of ore processed due to the increased
availability of equipment following improvements in the maintenance programme. Quarterly
gold production increased 1.9% vs. 1Q18 as a result of the higher volume of ore 
processed.

The expected gold grade for the full year 2018 is expected to remain approximately
1.8 g/t.

Quarterly silver production increased 4.1% vs. 2Q17 and 22.4% vs. 1Q18 due to increased
access to higher silver ore grade areas at Taspana and Rosario and increased volume
of ore processed. Year to date silver production was in line with 1H17.

The expected silver grade for the full year 2018 remains unchanged at approximately
160 g/t.

Quarterly and first half by-product lead and zinc production decreased when compared
to the same periods of 2017 as a result of lower ore grades and recovery rates, 
which were mitigated by the higher volume of ore processed. Quarterly by-product
lead production was in line with 1Q18.

Quarterly by-product zinc production increased 22.4% vs. 1Q18 as a result of a higher
recovery rate, ore grade and volume of ore processed.

**San Julián mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed Phase I  Veins (t)

  |

289,775

  |

308,342

  |

-6.0

  |

310,742

  |

600,517

  |

614,423

  |

-2.3

  |  
 |

Ore Processed Phase II  JM (t)

  |

540,261

  |

–

  |

N/A

  |

531,459

  |

1,071,720

  |

–

  |

N/A

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Total production at San Julián

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (oz)

  |

20,097

  |

20,912

  |

-3.9

  |

19,791

  |

39,888

  |

41,041

  |

-2.8

  |  
 |

Silver (koz)

  |

3,533

  |

1,592

  |

121.9

  |

3,568

  |

7,100

  |

2,979

  |

138.3

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production Phase I Veins

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (oz)

  |

19,584

  |

20,912

  |

-6.4

  |

19,111

  |

38,695

  |

41,041

  |

-5.7

  |  
 |

Silver (koz)

  |

1,263

  |

1,592

  |

-20.7

  |

1,445

  |

2,707

  |

2,979

  |

-9.1

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production Phase II

JM

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (oz)

  |

513

  |

–

  |

N/A

  |

680

  |

1,193

  |

–

  |

N/A

  |  
 |

Silver (koz)

  |

2,270

  |

–

  |

N/A

  |

2,123

  |

4,393

  |

–

  |

N/A

  |  
 |

Lead (t)

  |

1,493

  |

–

  |

N/A

  |

1,328

  |

2,821

  |

–

  |

N/A

  |  
 |

Zinc (t)

  |

5,254

  |

–

  |

N/A

  |

5,252

  |

10,507

  |

–

  |

N/A

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades Phase I Veins

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (g/t)

  |

2.12

  |

2.19

  |

-3.2

  |

1.97

  |

2.04

  |

2.18

  |

-6.6

  |  
 |

Silver (g/t)

  |

144.58

  |

171.58

  |

-15.7

  |

158.35

  |

151.71

  |

164.16

  |

-7.6

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades Phase II

JM

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (g/t)

  |

0.07

  |

–

  |

N/A

  |

0.09

  |

0.08

  |

–

  |

N/A

  |  
 |

Silver (g/t)

  |

156.71

  |

–

  |

N/A

  |

146.64

  |

151.72

  |

–

  |

N/A

  |  
 |

Lead (%)

  |

0.42

  |

–

  |

N/A

  |

0.40

  |

0.41

  |

–

  |

N/A

  |  
 |

Zinc (%)

  |

1.26

  |

–

  |

N/A

  |

1.31

  |

1.28

  |

–

  |

N/A

  |

 

**San Julián Veins (Phase I)**

Quarterly and first half silver production decreased 20.7%, 9.1% and 12.6% vs. the
same periods in 2017 and the previous quarter respectively as a result of: i) the
expected lower ore grade due to less availability of the higher silver ore grade
areas; and ii) a lower volume of ore processed as a result of the low water availability,
restricting processing capacity. With the arrival of the rainy season, full processing
capacity has now been restored.

The construction of the water reservoir, aimed at providing a consistent source 
of water, has been delayed as a result of a longer than expected permitting process
delaying the grant of environmental permits. The company is making efforts to accelerate
this process and is also looking for alternate sources of water.

The expected silver grade for the full year 2018 is in the range of 165-175 g/t.

Quarterly and year to date gold production decreased vs. their corresponding periods
in 2017 as a result of lower volumes of ore processed and lower ore grades due to
the previously mentioned factors, however these were mitigated by the higher recovery
rates.

Quarterly gold production increased 2.5% vs. 1Q18 as a result of increased access
to areas with a higher gold ore grade and a higher recovery rate which resulted 
from the appropriate operating controls and the excellent response of the mineral
at the leaching stage.

The expected gold grade for the full year 2018 is expected to be in the range of
1.9-2.1 g/t

**San Julián (Phase II – JM disseminated ore body)**

Quarterly silver production increased 6.9% vs. 1Q18 due to the extraction from higher
ore grade areas in line with the mining sequence of the ore body. However, silver
ore grade of 156.7 g/t was below the guidance of 185 g/t for the full year.

The silver ore grade for the full year 2018 is expected to be in the range of 145-
155 g/t, lower than the previously guided ore grade, due to the extraction of ore
from lower grade areas of the mine as well as processing ore from the development
stockpile instead of mining the orebody according to the original plan. This was
done as a temporary alternate production plan as stope back-filling could not have
been done at the normal pace due to lower availability of water, which has now been
restored with the arrival of the rainy season.

Quarterly by-product gold production decreased 24.6% vs. 1Q18 as a result of a lower
ore grade and lower recovery rate.

Quarterly by-product lead production increased 12.4% vs. 1Q18 as a result of a higher
ore grade and recovery rate. Additionally quarterly, by-product zinc production 
remained at similar levels vs. 1Q18.

**Herradura total mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed (t)

  |

5,605,427

  |

6,551,791

  |

-14.4

  |

5,984,641

  |

11,590,068

  |

13,316,161

  |

-13.0

  |  
 |

Total Volume Hauled (t)

  |

33,560,118

  |

31,063,542

  |

8.0

  |

34,153,768

  |

67,713,885

  |

61,971,696

  |

9.3

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (oz)

  |

117,886

  |

116,267

  |

1.4

  |

125,243

  |

243,129

  |

224,009

  |

8.5

  |  
 |

Silver (koz)

  |

363

  |

104

  |

249.0

  |

241

  |

604

  |

222

  |

172.1

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (g/t)

  |

0.76

  |

0.66

  |

15.7

  |

0.68

  |

0.72

  |

0.64

  |

11.2

  |  
 |

Silver (g/t)

  |

2.60

  |

0.87

  |

198.5

  |

1.86

  |

2.22

  |

0.91

  |

142.8

  |

 

Quarterly and first half gold production increased vs. the corresponding periods
of 2017 as a result of: i) the ongoing inventory reduction at the leaching pads;
ii) an increase in the ore grade at the Dynamic Leaching Plant as a higher volume
of ore was being processed from the higher grade Valles area; and iii) a higher 
speed of recovery due to an intensive targeted irrigation programme and better dilution.
These factors more than compensated for the lower volume of ore processed.

Quarterly gold production decreased 5.9% vs. 1Q18 as a result of a decrease in the
inventory reduction at the leaching pads and a lower volume of ore processed. However,
the previously mentioned factors were mitigated by the higher ore grade in the mined
areas.

In 2017, as part of the future mine plan, Fresnillo decided to construct a new leaching
pad in a separate area of the Herradura mine. To reduce the hauling distance from
the pit to the new pad, the Group constructed an access route through certain existing
leaching pads, removing and redepositing the ore in the process. These works allowed
the Group to perform assays and verify certain characteristics of the ore, including
the humidity of the ore deposited and the grade of gold in solution. The testing
of those assays commenced in 2018 and is ongoing.

As a result of the information obtained to date, the Group updated its estimate 
of the recoverable remaining gold content in the inventories at the leaching pads
resulting in an increase of 98.9 thousand ounces of gold as at 1 January 2018. This
represents 1.7% of the total gold content deposited from the inception of the mine
to 31 December 2017.

Management expects to finalise the remaining testing by the year end. The additional
results may further increase management’s estimates.

**Noche Buena total mine production**

  |

 |

2Q 18

  |

2Q 17

  |

% change

  |

1Q 18

  |

1H 18

  |

1H 17

  |

% change

  |  
 |

Ore Processed (t)

  |

4,550,915

  |

4,399,136

  |

3.5

  |

4,414,790

  |

8,965,705

  |

9,012,820

  |

-0.5

  |  
 |

Total Volume Hauled (t)

  |

22,073,319

  |

22,436,979

  |

-1.6

  |

20,521,239

  |

42,594,558

  |

43,355,636

  |

-1.8

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Production

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (oz)

  |

45,308

  |

42,097

  |

7.6

  |

42,735

  |

88,043

  |

89,774

  |

-1.9

  |  
 |

Silver (koz)

  |

18

  |

7

  |

157.1

  |

19

  |

37

  |

14

  |

164.3

  |  
 |

 |

 |

 |

 |

 |

 |

 |

 |  
 |

Ore Grades

  |

 |

 |

 |

 |

 |

 |

 |  
 |

Gold (g/t)

  |

0.54

  |

0.51

  |

5.9

  |

0.52

  |

0.53

  |

0.51

  |

4.3

  |  
 |

Silver (g/t)

  |

0.18

  |

0.09

  |

93.1

  |

0.22

  |

0.20

  |

0.09

  |

115.6

  |

Quarterly gold production increased vs. the same period 2017 as a result of higher
ore grade and volume of ore processed. Year to date gold production remained at 
a similar level when compared to the same period of 2017.

Quarterly gold production increased 6.0% vs. 1Q18 as a result of higher volume of
ore processed and to a lesser extent, higher ore grade.

**Update on development projects**

An update on our development projects and exploration programme will be provided
alongside our interim results, due to be announced on 31 July 2018.

**Safety Performance**

We deeply regret to report that during 2Q18 there was a fatality at the San Julián
mine as a result of an accident that occurred outside the mine operating areas but
within the Company’s property limits. We continue to reinforce our safety measures
throughout the Company, with our management systems and organisational programmes
centered on personnel safety. We remain committed to our zero fatalities target.

 

Share on: