# Ferro-Alloy Resources Q&A: Significant news flow to come (LON:FAR)

- Link: https://www.directorstalkinterviews.com/ferro-alloy-resources-qa-significant-news-flow-to-come-lonfar/412868084
- Published: 2020-10-30T10:24:51+00:00
- Author: Amilia Stone

**Ferro-Alloy Resources Ltd ([LON:FAR](https://www.directorstalkinterviews.com/company/ferro-alloy-resources/far.l))**
Chief Executive officer Nick Bridgen caught up with DirectorsTalk for an exclusive
interview to discuss why they are producing molybdenum, the financial significance
and what investors should be looking out for in the coming months.

**Q1: Nick, Ferro-Alloy Resources is a vanadium producer, can you explain why you’re
going to be making molybdenum?**

**A1**: Well, the main raw material that we buy, that contains the vanadium, comes
from oil refining, catalyst to use for the demetallisation of crude oil in a refinery
these catalysts collect vanadium and the molybdenum. There’s more vanadium than 
molybdenum and up until now, we’ve been producing the vanadium from these materials
but we haven’t been recovering the molybdenum.

Now, the grade of vanadium in these materials depends on where they come from and
how much pre-treatment they’ve had, typically they range from 10% to say 25% v2O5,
that’s vanadium pentoxide and a typical moly  grade will be rather less, probably
around 4%.

Obviously, if you can recover it as we now can, that’s just incremental revenue 
with very little additional costs so it has a disproportional effect on the bottom
line so that’s why we’re do it, it increases our cashflow.

**Q2: So, how significant is this then for you financially?**

**A2**: It’s very significant to the existing operation and, I have to say, the 
existing operation is relatively small compared with the project, the Balasausqandiq
project that we’re developing, it’s that project that we’re in business for. This
current operation is an expanded version of the original pilot plant.

It’s very significant to us in that it gives us a cashflow, keeps the people occupied,
we have a lot of expertise, we’re getting more and more skilled at what we do and
getting more and more knowledge of the vanadium market and how to operate in the
local environment.

So, the existing operation is very good, unlike most other junior companies, we 
don’t have a black hole in front of us, we don’t have a cash burn rate because we’re
an operation, we’re existing.

That incremental revenue, when prices are low as they are now, the vanadium prices
are very volatile, when prices are low, it makes a big difference, it switches us
from breaking even to a significant earner. That increasing grade, remember it comes
without any real material costs, it’s simply increase in revenue for almost no cost
of sales, there’s a little bit of a recovery cost, the materials are brought into
solution anyway to get the vanadium out so there’s just a little bit of additional
recovery costs on the calcium molybdate.

Roughly 80% of revenue flows through to the bottom line so it’s highly significant
to our existing operation.

**Q3: What should investors be looking out for from Ferro-Alloy Resources in terms
of news flow over the coming months?**

**A3**: We’ve got a busy time over the next, roughly six months, the big thing that
will make life an awful lot easier for us is the connection to the local power supply.

We’re getting very poor quality power at the end of a long reticulated line with
wooden poles at the moment and that’s causing a lot of operational problems as I’ve
said in many of our releases, but we’re well on the way now to connecting onto a
high but high voltage line. That will, at a stroke, get rid of 90% of our operational
difficulties and let us use the existing capacity more efficiently.

That will increase our average run rate significantly itself, but we’ve got several
other bits of kit coming on stream over the next few months. The first one will 
be the converter so that we convert our AMV – ammonia metavanadate – production 
into vanadium pentoxide, that gets rid of a discount and increases the number of
customers that we can sell to so that will increase our revenue.

Very significantly, around six months’ time, we should be bringing on stream our
electric arc furnace and that really completes our expansion plan that we announced
when we listed for this plant. It should get us up to 1500 tons a year of V2O5 production
and makes the whole thing a lot more profitable because we’ve got the same overheads,
a lot of the same costs but we just have more than double existing production. Moreover,
we’ll be able to make ferro vanadium which is a higher level up the value chain 
compared with existing AMV and vanadium pentoxide that we’ll be making soon.

So, that will really be the completion of this existing plant and, given a fair 
wind on vanadium prices, that’s what we expect to be able to make very significant
profits just from this operation and makes funding the expansion of the main project
very much easier.

Of course, talking of the main project, that is the reason we’re in business, that’s
what gives us our $2 billion of NPV and the feasibility study is what we’re working
on so very difficult to be exact with the timing of feasibility studies, but over
the next six months we should have some significant news flow.

Share on: