**Ferro-Alloy Resources ltd** ([LON:FAR](https://www.directorstalkinterviews.com/company/ferro-alloy-resources/far.l))
CEO Nicholas Bridgen talks us through the Ferro-Alloy Resources Corporate Presentation
July 2020.

The Company’s operations are all located at the Balasausqandiq Deposit in Kyzylordinskaya
Oblast in the South of Kazakhstan. Currently the Company has two main business activities:

a) the high grade Balasausqandiq Vanadium Project; and

b) an existing profitable vanadium concentrate processing operation

Balasausqandiq is a very large deposit, with vanadium as the principal product, 
together with by-products of carbon, molybdenum, uranium, rare earth metals, potassium,
and aluminium. Owing the nature of the ore, the capital and operating costs of development
are very much lower than for other projects.

A reserve on the JORC 2012 basis has been estimated only for the first ore-body (
of five) which amounts to 23 million tonnes, not including the small amounts of 
near-surface oxidised material which is in the Inferred resource category. In the
system of reserve estimation used in Kazakhstan the reserves are estimated to be
over 70m tonnes in ore-bodies 1 to 5 but this does not include the full depth of
ore-bodies 2-5.

There is an existing concentrate processing operation at the site of the Balasausqandiq
Deposit. The production facilities were originally created from a 15,000 tonnes 
per year pilot plant which was then adapted to treat low-grade concentrates and 
is now in the process of being expanded and further adapted to treat a wider variety
of raw materials.

Ferro-Alloy Resources has already completed the first steps of a development plan
for the existing operation which is expected to result in annualised production 
capacity increasing gradually to around 1,500 tonnes of contained vanadium pentoxide.
The development plan includes upgrades to infrastructure, an extension to the existing
factory and the installation of equipment to increase the throughput and to add 
the facilities to convert AMV into vanadium pentoxide.

The strategy of the Company is to develop both the Existing Operation and the Project
in parallel. Although they are located on the same site and use some of the same
infrastructure, they are separate operations.