# Ferro-Alloy Resources CEO very optimistic for 2023 (LON:FAR)

- Link: https://www.directorstalkinterviews.com/ferro-alloy-resources-ceo-very-optimistic-for-2023-lonfar/4121105572
- Published: 2023-02-14T08:07:20+00:00
- Author: Amilia Stone

**Ferro-Alloy Resources plc ([LON:FAR](https://www.directorstalkinterviews.com/company/ferro-alloy-resources/far.l))**
Chief Executive Officer Nick Bridgen caught up with DirectorsTalk to discuss their
trading update, a step change in 2023, grant to make VRFB and the progress of the
feasibility study.

**Q1: ****This RNS, it’s mainly about the existing operation, how important is this
to the big picture of Ferro-Alloy Resources?**

**A1**: It’s important and not important. In broad numbers, it’s insignificant because
96% of our projected value, according to our projections, comes from the main project
and only 4% from this existing operation.

On the other hand, it’s very important as it feeds us, it’s going to be making money
which means that we don’t have to raise more money to do the feasibility study and
frontend engineering, and it’ll reduce the money we need to raise.

Even more importantly, it gives us the knowhow, the experience. We’ve got 200 employees
that all know what they’re doing and they will switch seamlessly into the big project
as we build it. So, it greatly de-risks the big project.

So, it is important but in the grand scheme of things, perhaps it’s not so important
financially.

**Q2: The RNS says that 2023 is likely to be much better than 2022, can you tell
us what’s going to change?**

**A2**: 2022 was a pretty dismal year for us for a number of reasons.

First, mostly to do with the world politics, at the beginning of the year we were
recovering from COVID and all the transport links we disrupted and everything was
expensive and delayed. Then, of course, we had our own riots in Kazakhstan which
produced a bit of a delay, and then we’ve had the Ukraine invasion which has upset
all our transport routes. All in all, we’ve had a pretty bad year.

2023 is going to be a step change really, chalk and cheese change. Not only do I
hope that the world political situation will recover, it is already recovering and
it’s a horrible thing to say but the world is learning to live with Ukraine transport
routes, the costs are coming down. Because we know our existing suppliers have problems,
we’ve doubled up, we’ve got a new contract with a new supplier so the concentrate
shortages should be a thing of the past, and we’re recovering a lot more value from
each tonne treated.

Coincidently, almost all the big projects came on line at the end of last year, 
or very early this year, in that we’ve doubled up the moly circuit so we’re capable
of recovering up to the double the amount of moly, obviously it depends on what’s
in the concentrates. Moly, the price has gone through the roof, it’s about 2.5 times
where it was at the beginning of the year. We’ve got a new press-filter which means
we can do a second pass recovery of vanadium, get a few more percent recovery and
we’ve got what we call a dissociation oven which means we can convert the AMV to
V2O5 which gets us slightly higher price. We’ve also got the nickel project on line,
the residues from all that we’ve done already is low grade nickel concentrate and
we’ve now put the kit in to raise it and get a much higher value for it.

So, really, in very round simple terms, doubling the amount of concentrates and 
doubling the revenue from each tonne we treat so it really is a radical change and
I’m very optimistic for 2023.

**Q3: You’ve received a grant to make electrolyte for vanadium redox flow batteries,
first of all can you tell us what these batteries are, and then what this means 
for Ferro-Alloy Resources?**

**A3**: This is interesting. First of all, there is no market at present for this
material in our area so this is all about positioning. We announced some time ago
that we had the technology to make the oxides of vanadium that are used to make 
electrolyte, in other words to make electrolytes.

What vanadium redox flow batteries are, to give them their full title, is a form
of battery that is suitable for bulk and long term energy storage, they’ll never
be used in cars or mobile phones, that’s all lithium-ion territory. They’re big 
heavy things with liquid sloshing around in them but they are the front running 
technology for this bulk energy storage so if a grids is dependent on solar or wind,
it needs battery storage to make it available 24 hours a day.

It is the front running technology, there are other technologies, there’s no guarantees
in this but what we’re doing is positioning ourselves to take advantage of this 
market. We’ve got the technology, we’ve proven that previously, and now we’re doing
a project with a local university department to make the electrolyte, sell it and
get ourselves ready.

Because electrolyte has got vanadium in it but it’s also got a lot of water and 
sulfuric acid, there’s no point in shipping water and sulfuric acid around the world,
that’s a dangerous cargo. So, as this technology takes off, I envisage that we’ll
become a regional supplier for all those batteries that come within our range.

I could be a huge market, there’s no guarantees, people have been forecasting this
for a long time and it’s taking longer to take off than people thought but it’s 
very exciting for vanadium and therefore for us if it does take off. So, we’re positioning
ourselves ready to take advantage of that market. Of course, the big benefits will
come when the big project is on stream, we’ll have much more capacity, but this 
way we get all the knowhow and we can develop the market ahead of time.

**Q4: Where are you up to with the feasibility study?**

**A4**: Of course, this is the important question. As I said, 96% of our value projected
is in the big project, really, things take a long time but we’re getting there.

We’ve finished the drilling, we’ve completely finished ore body one so that is now
with SRK, our consultants who will do the new reserve and that will come out around
the end of next month, may be the next one if they’re slow about it. Ore bodies 
two, three and four, the drilling has been done all bar an area that’s difficult
to access so we’re going to see what the results are to date. If that gives us enough
ore reserve then we’ll stop but we have the option to drill a bit more of ore bodies
five or six instead. We’ve got lots of ore bodies, we’ve got huge amounts of vanadium,
more than we’re projected to use up in our phase I and our phase II developments
so that’s in hand.

That will prove what we already know, that there’s a huge deposit here, and of course
the metallurgy is progressing, that’s quite long winded nowadays, you need to do
all the basic testing, the variability testing and that’s in progress. That will
be announced over the next 2-3 months, I guess so we’re getting there, projected
to be in the last quarter of this year, to be announced.

Share on: