**Ferro-Alloy Resources Ltd** ([LON:FAR](https://www.directorstalkinterviews.com/company/ferro-alloy-resources/far.l)),
the vanadium producer and developer of the large Balasausqandiq vanadium deposit
in Southern Kazakhstan, has announced an update on the progress of the expanded 
feasibility study for the large Balasausqandiq vanadium deposit. 

**Highlights**

·    Drilling programme 50% complete

·    Early results of an 800m section of OB1 show a 75% increase in volume and tonnes

·    Metallurgical recovery into leach of 93% confirmed

·    Acid consumptions of 200 kg per tonne or less indicated.

·    Test results show a 40% carbon product can be recovered at 25% mass recovery

·    Tests show this product can be used as a substitute for carbon black in tyre
manufacture

As previously announced, the scope of the Feasibility Study has expanded considerably
since its inception.  The original study was designed to confirm the results of 
previous studies and the operations of the 15,000 tonnes per year experimental pilot
plant from which some 20 tonnes of vanadium pentoxide (in ammonium metavanadate)
was produced. Those studies, described in the Competent Persons Report of 2018, 
envisaged project development in two stages, Phase 1 with an output of 5,600 tonnes
of vanadium pentoxide per year, followed by Phase 2, with output rising to 22,400
tonnes per year. Combined NPV was estimated at over US$2 billion. Following the 
investment from Vision Blue Resources in early 2021, the decision was taken to upgrade
and expand the Study to include Phase 2 and the more significant by-products.

Consequently, the drilling programme has been expanded to cover ore bodies (OB) 
2, 3 and 4 as well as OB1 in order to provide enough reserve to feed the Phase 2
expansion for a targeted 20 year mine-life.  The Study is now including all aspects
of Phase 2 although the second phase will be announced later than Phase 1. The Phase
1 study is expected to be completed on the previously announced timetable by around
the middle of 2023.

**Exploration**

With support from SRK Consulting (Kazakhstan) Limited, around 10,000m of drilling
has been completed out of an expected total programme of 20,000m.  Confirmation 
and infill drilling of OB1 has been completed and full analyses are awaited.

An initial semi-quantitative assessment from field X-Ray fluorescence measurement
has substantially confirmed the previous modelling for OB1 but a comparison of the
results of the new infill drilling over a 600 m strike length using drill sections
200m apart with the previous resource showed similar geometry but with some thicker
mineralised intersections. Based on this highly positive result, the decision was
taken to increase the drilling density to 200m sections for the remainder of the
drilling programme, leading to the substantial increase in the estimated programme
meterage.

Sample preparation is being carried out by SGS in Kazakhstan and the first batches
of prepared samples have already been sent to Intertek Genanalysis in Perth, Australia,
for sample analysis. The results are expected in the coming weeks. Most of the resource
drilling is expected to be completed by the end of Q3 2022 and full sample analyses
and modelling should be completed by the end of the year. However, approximately
25% of OB2 is inaccessible to the currently operating drill-rigs. The results from
this area will be delayed until more suitable mobile rigs can be mobilised.

**Processing**

The process design and test work is being carried out by SGS Canada Inc. (SGS) under
the direction of Coffey – A TetraTech Company. Under their control, a test programme
has been carried out by SGS to confirm recoveries and other process parameters originally
achieved by the company at its test-plant in Kazakhstan.  Test work has confirmed
leach extraction of vanadium as 93%, which is consistent with previous results. 
Acid consumption, subject to optimisation, was indicated at 200 kg per tonne treated.
The very high level of extraction is possible from the ore at Balasausqandiq because
it is sedimentary in origin, with little iron content, compared with the more commonly
occurring vanadiferrous titano-magnetites from which much lower recoveries are obtained.
Moreover, the extraction is achieved from a low-cost process involving whole-ore
pressure acid leaching in sulphuric acid media, with no pre-concentration or roasting
required.

Sulphuric acid is available at low cost in Kazakhstan as processors use the substantial
amounts of sulphur available from desulphurisation of Kazakhstan’s oil production.
A study is ongoing into whether it is worthwhile to build a sulphuric acid plant,
which would enable the operation to benefit from the exothermic heat to produce 
steam and power. This was originally envisaged for Phase 2.

**Carbon**

Two test-programmes are being carried out into the recovery and use of the carbon
which makes up around 14% of the ore at Balasausqandiq.  This carbon is in a form
similar to carbon black. Two main uses have been identified, both of which make 
use of the silica that forms the bulk of the tailings material.  One use is as a
flux in smelting of ferro-silicon, and the other is as a carbon black filler substitute
in making rubber – principally tyres.

The programme of test work into the use as a flux in smelting is following and extending
the previous work done by the Company.  Laboratory work on 700kg of material has
been completed by the Karaganda Chemical Metallurgical Institute, Kazakhstan, and
has demonstrated the suitability of this material for smelting.  A bulk test-programme
using two tonnes of material is now being carried out by the National Centre for
Complex Treatment of Mineral Resources to test the production of ferro-silicon at
industrial scale.  Previous work has indicated that the material replaces around
50% of the carbon required for making ferro-silicon and 100% of the silica. 

The second programme is already largely complete and has demonstrated that a product
of 40% carbon can be made by simple flotation, with a mass recovery of around 25%.
The production of rubber has shown that when the carbon product is substituted for
20% of the carbon black (grade N550), used as a filler in making tyres, performance
is the same as using 100% carbon black.  Different types of tyres are made by different
manufacturers using different constituents so the suitability of this material for
different types of tyres from different manufacturers is a matter for those companies
to assess. One tyre manufacturer is currently testing samples as a prelude to commercial
negotiations. Other manufacturers will be approached when the test work is completed.

The potential output of this concentrate is potentially over 200,000 tonnes per 
year from Phase 1, or 800,000 tonnes per year from Phase 1 and 2.  N550 grade of
carbon black is a relatively high value form of carbon although as the Company’s
concentrate will be a non-standard product it is difficult to forecast what discount
to the N550 carbon black price might result from commercial negotiations, what level
of offtake might be obtained and what transport costs might be incurred.

The Carbon Black market was estimated to be worth some $19 billion in 2020 worldwide,
around 70% of which was used for tyres. The market is estimated to be growing by
some 4.5% per year, driven by increasing applications in various end-use industries.

Carbon Black is usually made by the incomplete combustion of oil or gas, with only
some 40% recovery into product, so the Company’s carbon black substitute will greatly
reduce the CO2 associated with carbon black production, and hence tyre production.
This opportunity to reduce emissions using FAR’s product is likely to add to the
value, either as a means of allowing tyre producers to meet stated carbon reduction
targets or, more directly, in reducing carbon emissions payments of our customers.

**Other**

By-product studies are ongoing into the recovery of uranium, molybdenum and potassium
alum in accordance with earlier work. Test-work has indicated a low recovery of 
rare earth minerals into leach and this aspect of the study has been discontinued.

A tailings study has commenced, with evaluation of design options and potential 
facility locations.  Tailings are comprised principally of the carbon and silica
remaining after leaching, so are subject to recoveries as carbon products described
above, but even the remaining tailings have potential commercial uses.  The tailings
design therefore needs to accommodate the various revenue-producing options.

A geotechnical programme is due to commence later this month and contractor proposals
are being considered for the open pit hydrogeology work. Geophysical fieldwork for
the process water supply borefield is also due to commence shortly.

[Ferro-Alloy Resources](https://www.directorstalkinterviews.com/ferro-alloy-resources/far.l)
Ltd ([LON: FAR](https://www.directorstalkinterviews.com/company/ferro-alloy-resources/far.l))
is developing the potentially very large Balasausqandiq vanadium deposit in Kyzylordinskaya
oblast of southern Kazakhstan. The ore at this deposit is unlike that of many other
primary vanadium deposits, appearing to be amenable to treatment by a much lower
cost process.