# European Metals Holdings Limited Drill Programme Completed & Czech Manager

- Link: https://www.directorstalkinterviews.com/european-metals-holdings-limited-drill-programme-completed-czech-manager/412721001
- Published: 2017-01-16T07:13:44+00:00
- Author: Giles Arbor

**European Metals Holdings Limited ORD NVP (DI)** (LON:EMH) has today announced 
that the planned core drillhole programme was completed on time and budget, without
time loss incidents. In total 17 drillholes were drilled to a summary depth of 6081
meters. Analytical results for the CIW-10 and CIW-23 are reported in this announcement.

The Company is also pleased to announce the appointment of a highly experienced 
mining executive to the role of Country Manager.

Key Points:

 * Analytical results for further two drillholes at Cinovec Main confirmed or exceeded
   the expected lithium content and mineralization widths.
 * One drillhole is located at the western edge of the deposit near the contact 
   of the mineralisation. The other drillhole is located in the central part of 
   Cinovec Main. This hole has returned the best lithium interval to date.
 * Hole CIW-23 recorded an interval of 261.1m averaging 0.50%Li2O (including high-
   grade intervals 23.9m@0.81%Li2O, 8m@1.05%Li2O, 4m@1.17%Li2O, 4m@1.41%Li2O, and
   6m@0.95%Li2O. In addition, significant tin and tungsten mineralisation is recorded:
   11 meters averaging 0.081% tungsten, 5 meters averaging 0.14% tin and 1 meter
   averaging 1.2% tin, and 2 meters averaging 0.088% tungsten.
 * Hole CIW-10 reported an intercept of 223.9m averaging 0.43% Li2O.
 * All core samples for the remaining 5 holes have been delivered to the analytical
   laboratory with results expected to be delivered by the end of January.
 * Geological information from all 17 drillholes has been compiled into the Cinovec
   database and serves to update the geological model for Cinovec Main. The geologic
   model will be used to constrain and update the current block model. The block
   model will be updated in early February when all analyses will be received. The
   block model and resource calculation will be part of the Pre-Feasibility Study
   planned for release in April 2017.
 * The Company welcomes the appointment of Mr Richard Pavlik to the position of 
   General Manager of the Company’s Czech subsidiary Geomet s.r.o.

 

Geomet holds the licences for the Company’s 100% owned Cinovec Project in the Czech
Republic. Mr Pavlik holds a Masters Degree in Mining Engineer from the Technical
University of Ostrava in Czech Republic. He is the former Chief Project Manager 
and Advisor to the Chief Executive Officer at OKD. OKD has been a major coal producer
in the Czech Republic. He has almost 30 years of relevant industry experience in
the Czech Republic. Mr Pavlik also has experience as a Project Analyst at Normandy
Capital in Sydney as part of a postgraduate programme from Swinburne University.

Mr Pavlik has held previous senior positions within OKD and New World Resources 
as Chief Engineer, and as Head of Surveying and Geology. He has also served as the
Head of the Supervisory Board of NWR Karbonia, a Polish subsidiary of New World 
Resources (UK) Limited. Mr Pavlik’s primary responsibilities will be to manage the
in-country aspects of the Cinovec development programme, coordinate technical work
and liaise with Government authorities on permitting and licensing of the project.

> **European Metals Holdings Limited ORD NVP (DI) CEO Mr Keith Coughlan said:** “
> I am very pleased that we have finished the drilling programme on time and without
> any accidents. These latest results highlight the substantial mineralisation at
> Cinovec and the opportunities available to target higher grade areas within these
> zones.
> When all results are received, we will upgrade the block model and finalise the
> resource estimate for the Pre-feasibility study. We expect further conversion 
> of inferred to indicated resources to occur as part of this re-modelling.
> I would also like to welcome Richard Pavlik as our Country Manager. Richard has
> extensive experience in the Czech Mining Community and will be a huge asset in
> providing in-country knowledge and capability during the feasibility, permitting
> and development process.”

Drill Programme

The CIW-10 and CIW-23 were drilled at the western edge, and in the central part,
respectively, of the Cinovec Main sector of the deposit (see Figure 1).

The current drill programme at Cinovec Main has been planned to confirm and delineate
near surface lithium and tin mineralisation that would provide initial feed to the
mill. Other goals are the conversion of resources from the Inferred to Indicated
category, and delivery of material for metallurgical testing. So far, ten diamond
core holes have been completed, and three are underway. Visual inspection and logging
indicates that the geology in these holes is as expected. Drill details are listed
in Table 1 below.

After geological logging, drill core is cut in half with a diamond saw. Quarter 
core samples are selected (honouring geological boundaries) and dispatched to ALS(
Romania) for preparation and assay; the 3/4 of the core is returned to the core 
box and stored securely on site. Samples are being prepared and analysed by ALS 
using ICP and XRF techniques following standard industry practice for lithium and
tin deposits. Strict QAQC protocols are observed, including the insertion of a Li
standard in random fashion for every 10 core samples, as well as the insertion of
blank and duplicate samples.

Table 1 – Completed drillholes, Cinovec Main

     |  Hole ID |  North |  East |  Elevation (m) |  Depth (m) |  Azimuth |  Dip |  Comments |  
 |  CIW-11 |  -779300 |  -966098 |  867.4 |  444.4 |  40.1 |  -77.86 |  confirmation/infill |  
 |  CIW-20 |  -778811 |  -965638 |  837.5 |  257.6 |  336.7 |  -84.6 |  confirmation/infill |  
 |  CIW-13 |  -779176 |  -966127 |  862.8 |  429.3 |  76 |  -80.4 |  confirmation/infill |  
 |  CIW-19 |  -778811 |  -965692 |  837.8 |  271.6 |  332.1 |  -89.58 |  confirmation/infill |  
 |  CIW-08 |  -778791 |  -965800 |  837.6 |  274.9 |  156.85 |  -89.3 |  confirmation/infill |  
 |  CIW-18 |  -779019 |  -966183 |  855.47 |  395.7 |  210.6 |  -89.05 |  confirmation/infill |  
 |  CIW-14 |  -779056 |  -966093 |  854.46 |  417.8 |  323.3 |  -89.07 |  confirmation/infill |  
 |  CIW-07 |  -778867 |  -965841 |  840.99 |  300 |  333.6 |  -89.57 |  confirmation/infill |  
 |  CIW-26 |  -779215 |  -965937 |  865.33 |  430.5 |  248 |  -89.38 |  confirmation/infill |  
 |  CIW-17 |  -778957 |  -965521 |  847.07 |  238.2 |  332.1 |  -89.58 |  confirmation/infill |  
 |  CIW-21 |  -778812 |  -965952 |  841.33 |  320.6 |  42.68 |  -89.02 |  confirmation/infill |  
 |  CIW-10 |  -779215 |  -965938 |  865.35 |  455 |  303.4 |  -74.47 |  confirmation/infill |  
 |  CIW-23 |  -779009 |  -965994 |  848.91 |  376.1 |  222.3 |  -89.4 |  confirmation/infill |  
 |  CIW-22 |  -779009 |  -965993 |  848.88 |  420.6 |  287.9 |  -70.43 |  confirmation/infill |  
 |  CIW-06 |  -778995 |  -965845 |  846.77 |  296.3 |  11.7 |  -80.18 |  confirmation/infill |  
 |  CIW-25 |  -778994 |  -965902 |  847.04 |  382.4 |  281.1 |  -69.89 |  confirmation/infill |  
 |  CIW-27 |  -779152 |  -965817 |  861.5 |  370 |  271.9 |  -89.53 |  confirmation/infill |  
 |  Hole locations are recorded in the local S-JTSK Krovak grid, all coordinates are surveyed. |

Mineralized Intercepts and Lithology

The drillhole CIW-10 was located near the granite-porphyry contact, testing lithium
mineralisation near the western termination of the deposit. In this location, at
the W and NW part of the deposit, the contact is relatively steeply dipping. The
CIW-10 drillhole was angled at 75 degrees to the W, and collared in the barren porphyry.
At 213 m down the drill axis the porphyry-granite contact was intersected at a depth
predicted by the Company’s geologic model. The contact is marked by brecciated pegmatite,
and immediately below it the granite is greisenized and mineralized in lithium. 
The interval from 213m to 429m is formed by variably greisenized granite containing
5 to 15% of zinnwaldite, the lithium-bearing mica. The footwall to the greisenized
granite is a low-mica granite, in which the drillhole was terminated at 455m. The
core angles of contacts are steeper than usually (about 20 to 40 degrees), and as
the core was not oriented, it is impossible to ascertain with certainty the orientation
of the mineralized zones. Therefore, the mineralized intercept may not represent
true width.

The drillhole CIW-23 was collared in the central part of the Cinovec-Main deposit
where the Cinovec lithium granite daylights. First 119m of the core are formed by
sericite-albite (locally hematized) granite. Between 116 and 119 the drill intersected
a historic backfilled stope after mining high grade tin-tungsten quartz veins in
the 1960’s. The interval between 119m and 388.3m is formed by variably greisenized
granite that carries zinnwaldite. Locally stopes, narrow quartz veins or massive
greisens were intersected in this interval. The footwall to the greisenized granite
is a low-mica granite, in which the drillhole was terminated at 376.1m.

The Tables below list the mineralised intercepts from all two drillholes.

Table summarizing mineralised intercepts in CIW-23

  |  CIW-23 |  
 |  From |  To |  Interval (m) |  Li_(2)O (%) |  Sn (%) |  W (%) |  Note |  
 |  8.1 |  35.5 |  27.4 |  0.23 |   |   |   |  
 |  58 |  74 |  16 |  0.21 |   |   |   |  
 |  94 |  357 |  261.1 *) |  0.5 |   |   |  incl. 23.9m@0.81%Li2O (117.1-141m), |  
 |  8m@1.05%Li2O (133-141m), |  
 |  4m@1.17%Li2O (162-166m), |  
 |  4m@1.41%Li2O (224-228m), |  
 |  6m@0.95%Li2O (296-302m) |  
 |  92 |  93 |  1 |  0.37 |  0.2 |  0.033 |   |  
 |  124 |  135 |  11 |  0.83 |  0.02 |  0.081 |   |  
 |  147 |  147.8 |  0.8 |  0.76 |  0.005 |  0.115 |   |  
 |  162 |  164 |  2 |  1.66 |  0.02 |  0.088 |   |  
 |  243 |  248 |  5 |  0.47 |  0.14 |  0.022 |   |  
 |  Cut-off: 0.2%Li2O, 0.1%Sn, 0.05%W |  
 |   *) intercept shorter by mined-out cavities |

Table summarizing mineralised intercepts in CIW-10

  |  CIW-10 |  
 |  From |  To |  Interval (m) |  Li_(2)O (%) |  Sn (%) |  W (%) |  Note |  
 |  213.1 |  437 |  223.9 |  0.43 |   |   |  incl. 1.9m@1.04%Li_(2)O (213.1-215m), |  
 |  2m@0.99%Li_(2)O (306-308m), |  
 |  1.05m@1.40%Li_(2)O (406.2-407.25m) |  
 |  447 |  451 |  4 |  0.26 |   |   |   |  
 |  213.1 |  214 |  0.9 |  1.46 |  0.17 |  0.004 |   |  
 |  331 |  332 |  1 |  0.38 |  0.18 |  0.002 |   |  
 |  Cut-off: 0.2%Li2O, 0.1%Sn, 0.05%W |

 

(Please refer to the announcement on the European Metals Website for the graphic
Figure 1 – A geological map showing the Company’s drill holes against surface geology
and subsurface greisen bodies projected to surface (in green). Historic UG workings
and drill holes not shown – www.europeanmet.com.)

 

BACKGROUND INFORMATION ON CINOVEC

PROJECT OVERVIEW

Cinovec Lithium/Tin Project

European Metals owns 100% of the Cinovec lithium-tin deposit in the Czech Republic.
Cinovec is an historic mine incorporating a significant undeveloped lithium-tin 
resource with by-product potential including tungsten, rubidium, scandium, niobium
and tantalum and potash. Cinovec hosts a globally significant hard rock lithium 
deposit with a total Indicated Mineral Resource of 49.1Mt @ 0.43% Li2O and an Inferred
Mineral Resource of 482Mt @ 0.43% Li2O containing a combined 5.7 million tonnes 
Lithium Carbonate Equivalent.

This makes Cinovec the largest lithium deposit in Europe and the fourth largest 
non-brine deposit in the world.

Within this resource lies one of the largest undeveloped tin deposits in the world,
with total Indicated Mineral Resource of 15.7Mt @ 0.26% Sn and an Inferred Mineral
Resources of 59.7 Mt grading 0.21% Sn for a combined total of 178kt of contained
tin. The Mineral Resource Estimates have been previously released on 18 May 2016.
The deposit has previously had over 400,000 tonnes of ore mined as a trial sub-level
open stope underground mining operation.

A Scoping Study conducted by specialist independent consultants indicates the deposit
could be amenable to bulk underground mining. Metallurgical test work has produced
both battery grade lithium carbonate and high-grade tin concentrate at excellent
recoveries with the Scoping Study. Cinovec is centrally located for European end-
users and is well serviced by infrastructure, with a sealed road adjacent to the
deposit, rail lines located 5 km north and 8 km south of the deposit and an active
22 kV transmission line running to the historic mine. As the deposit lies in an 
active mining region, it has strong community support.

Share on: