# Cora Gold Hits 21g/t at Sanankoro as Drilling Targets Bigger Gold Resource and Longer Mine Life (video)

- Link: https://www.directorstalkinterviews.com/cora-gold-hits-21gt-at-sanankoro-as-drilling-targets-bigger-gold-resource-and-longer-mine-life-video/4121270133
- Published: 2026-11-19T10:19:16+00:00
- Author: Giles

**[Cora Gold](https://www.directorstalkinterviews.com/company/cora-gold-ltd/cora.l)
Limited** (LON:CORA) has reported further high-grade drilling results at its Sanankoro
Gold Project in Mali, including 3 metres at over 21 grams per tonne gold at Zone
A and 19 metres at over 3 grams per tonne at Zone C.

CEO Bert Monro explains how drilling beyond the existing Mineral Resource Estimate
pit shells could unlock additional ounces, support a larger resource and extend 
the project’s currently modelled 10-year reserve life. With the drilling campaign
approaching completion and Front-End Engineering Design progressing, he discusses
the next steps towards an updated resource estimate, construction readiness and 
the potential to develop Sanankoro into a longer-life gold operation.

**Key Moments**

00:00 – Bert Monro introduces the latest Sanankoro results
00:10 – High-grade drilling
targets resource growth00:26 – Why drilling outside existing pit shells matters00:
55 – Zone C delivers 19 metres at over 3g/t gold01:12 – Testing deeper mineralisation
at Zone C01:35 – Zone A hits over 21g/t gold02:00 – How the drilling fits the wider
programme02:08 – Final diamond drilling and assay timetable02:22 – Updated Mineral
Resource Estimate planned02:39 – Drilling supports longer-term development02:46 –
FEED progress and the 10-year reserve life03:03 – Growing resources to extend mine
life03:17 – Exploration continues alongside construction plans

Cora Gold Limited is an AIM-listed gold exploration and development company focused
on West Africa, with its flagship Sanankoro Gold Project located in southern Mali.
The company is advancing Sanankoro towards potential construction while continuing
exploration to expand its mineral resource and reserves. Supported by a positive
Definitive Feasibility Study outlining a 10-year reserve life, Cora is undertaking
Front-End Engineering Design and further drilling aimed at extending the project’s
scale and long-term production potential.

Share on:
