# Challenger Energy Group expects to be awarded the AREA OFF-3 licence

- Link: https://www.directorstalkinterviews.com/challenger-energy-group-expects-to-be-awarded-the-area-off-3-licence/4121121028
- Published: 2023-06-05T07:20:10+01:00
- Author: Anthony Fox

**Challenger Energy** (LON:CEG), the Caribbean and Americas focused oil and gas 
company, with a range of oil production, development, appraisal, and exploration
assets, has advised that it has bid for, and now anticipates being awarded, the 
AREA OFF-3 licence, offshore Uruguay.

**HIGHLIGHTS**

·    **CEG has bid for and expects to be awarded the AREA OFF-3 licence, offshore
Uruguay.**

·    **AREA OFF-3 is the sole remaining available block offshore Uruguay; all** **
other offshore exploration licences are held by energy majors Shell and Apache and
YPF, the Argentinian national oil company.**

·    **The AREA OFF-3 licence is 13,252 km^(2), and will increase CEG’s total Uruguay
acreage holdings to** **~****2****8,000 km^(2), making CEG the second largest offshore
acreage holder in Uruguay behind Shell.**

·    **AREA OFF-3 is located in** **relatively shallow water, with** **existing 
2D and 3D seismic coverage. The block has** **a current estimated** **resource potential
of up to ~500 million barrels of oil equivalent (“mmboe”) and up to ~9 trillion 
cubic feet gas (“TCF”), from multiple exploration plays.**

·    **CEG’s AREA OFF-3 bid consisted of an initial 4-year exploration period, with
a work program limited to reprocessing and reinterpretation of 1,000 kms of 2D seismic
data.**

·    **Award of the AREA OFF-3 licence to CEG will represent a successful expansion
of the Company’s high quality, frontier play opportunity in Uruguay – a fast emerging
global exploration “hotspot” – and is consistent with a strategy of targeting high
impact Atlantic margin opportunities.**

Eytan Uliel, Chief Executive Officer of Challenger Energy, said:

_“We are delighted to advise that on 2 June 2023, ANCAP publicly announced the details
of Challenger Energy’s offer for the AREA OFF-3 licence, which is the precursor 
step for the formal award of the licence to CEG, and which we understand should 
occur in the next 3-4 weeks._

_AREA OFF-3 possesses identified prospects of material scale, and our immediate 
work focus will be a comprehensive technical reassessment of the block, applying
modern 2D seismic re-imaging and our subsurface knowledge of the Uruguayan offshore
margin, similar to the successful geotechnical de-risking approach we have applied
on AREA OFF-1._

_Strategically, the award of this licence will cement CEG’s position as a significant
participant in Uruguay, a country that has fast become one of the world’s frontier
exploration hotspots. At the same time, our bid for the AREA OFF-3 block demonstrated
the same disciplined and opportunistic approach we have taken in the past: acting
strategically and nimbly to secure large and promising acreage, yet with low-cost
work obligations, discretionary expenditure phasing, and no new seismic acquisition
or drilling commitments._

_We are especially appreciative of the confidence shown in CEG by the Uruguayan 
regulatory authority, ANCAP. Over the next four years we intend to further grow 
that confidence by applying our basin expertise and fully evaluating the licence’s
potential. We anticipate that we can create an opportunity of comparable value and
industry interest to what we have thus far identified with AREA OFF-1, to the benefit
of both Challenger and ANCAP.”_

**Overview**

As part of the Open Uruguay Round, First Instance of 2023, CEG submitted a bid for
the AREA OFF-3 block, offshore Uruguay. The Company is pleased to advise that on
2 June 2023, Administración Nacional de Combustibles Alcohol y Pórtland (“ANCAP”),
the Uruguayan national regulatory agency, published on its website that CEG ‘s offer
for AREA OFF-3 was received, outlined the terms of CEG’s offer, and noted that there
are now no further available offshore blocks in Uruguay. No other offers for AREA
OFF-3 are referenced in ANCAP’s communication.

Challenger Energy advised that this thus represents the precursor step to formal
award of the block to CEG, with the process of finalising the award expected to 
take 3-4 weeks. Refer to [https://exploracionyproduccion.ancap.com.uy/innovaportal/file/18158/1/2023-05-rua-first-instance-2023-v3.pdf](https://exploracionyproduccion.ancap.com.uy/innovaportal/file/18158/1/2023-05-rua-first-instance-2023-v3.pdf)

The award of AREA OFF-3 will expand the Company’s licence holding in Uruguay to 
two blocks, in the offshore Punta del Este and Pelotas sedimentary basins (AREA 
OFF-1 and AREA OFF-3), and will position the Company’s acreage on either side of
Shell’s AREA OFF-2 block.

AREA OFF-3 has many operational and subsurface similarities to the AREA OFF-1 licence:
comparable size acreage in similar water depths, both exhibit multiple, stratigraphic
plays and complement each other with play diversity while demonstrating similar 
exploration upside.

The commercial terms and work program bid by CEG for the AREA OFF-3 licence are 
similar to those for the AREA OFF-1 licence, providing for an initial 4-year exploration
period, during which CEG will be required to reprocess approximately 1,000 kilometres
of legacy 2D seismic and undertake two new geotechnical studies. The Company expects
that the cost of the work program in the initial 4-year exploration period will 
be approx. US$100,000 per annum.

Apart from the costs of completion of the minimum work program there are no annual
licence fee payments, no seismic acquisition (2D or 3D) or drilling is required 
in the initial 4-year period, and extension into a second exploration period is 
at CEG’s discretion.

**About AREA OFF-3**

The AREA OFF-3 licence has a total area of 13,252 km^(2) and is situated in water
depths from 20 to 1,000 meters, approximately 100 kilometres off the Uruguayan coast(
refer to the map link in Appendix A). Mapped prospects of interest are in relatively
modest water depths of ~250 metres.

There has been considerable prior seismic activity and interest on the AREA OFF-
3 block, comprising ~4,000 kms of legacy 2D (various vintages) and ~7,000 kms legacy
3D (2012 proprietary acquisition by BP and leading seismic vendor PGS). The block
was previously held by BP, but was relinquished in 2016. There are no prior wells
on the block.

Two material-sized prospects have previously been identified and mapped on AREA 
OFF-3 (BP & ANCAP), as follows:

·    _Amalia:_ resource estimate (EUR mmboe, gross): P10/50/90 (ANCAP) 2,189 / 980/
392 – the Amalia prospect straddles the boundary with Shell’s AREA OFF-2, with an
estimated 25% of the Amalia prospect contained within AREA OFF-3, and

·    _Morpheus:_ resource Estimate (EUR TCF, gross): P10/50/90 (ANCAP) – 8.96 / 
2.69 / 0.84 – the Morpheus prospect is entirely contained with AREA OFF-3.

During the initial 4-year exploration period, CEG’s technical focus will be on the
re-evaluation of the existing 2D and 3D seismic data on the block, given the renewed
interest in the types of plays present in Uruguay triggered by the recent conjugate
margin discoveries offshore Southwest Africa. In particular, the data and enhanced
technical understanding provided from recent activities in Namibia provides greater
confidence that the regional petroleum system charging Venus and Graff (offshore
Namibia) is likely to be present offshore Uruguay. As a result, traps that exhibit
effective sealing mechanisms, and which may previously have been overlooked or not
considered viable, are now potential exploration targets.

Moreover, AREA OFF-3 has the advantage of the majority of the block being covered
by 3D (2012 vintage, proprietary acquisition by BP and PGS) that could be reassessed
and subjected to the latest reprocessing technology – both in terms of reviewing
existing known prospects / plays and identifying potential new prospects / plays.
In addition, with the Amalia prospect straddling the border with AREA OFF-2, it 
potentially facilitates a joint exploration assessment with Shell (since May 2022
the AREA OFF-2 licence holder).

As noted by ANCAP, “_with this new offer [to CEG], there are no more areas available
under the Open Uruguay Round_“. An updated map indicating the current and proposed
licence position in Uruguay, as published by ANCAP on 2 June 2023, is included in
Appendix A.

**AREA OFF-3 Licence Terms**

The following **Table 1** presents a summary of the key AREA OFF-3 licence terms,
as bid by CEG. As noted, these are similar to the terms applicable for AREA OFF-
1, apart from the minimum work commitment obligation and associated cost for the
2D seismic reprocessing commitment: i.e., 1000 kms for AREA OFF-3 vs 2,000 kms for
AREA OFF-1.

| **Item** | **Licence Provision**** ** | **Comment**** ** | 
| Operator: | CEG   |  | 
| Participating Interest: | CEG 100%.ANCAP has the right to back-in for up to a 20% Participating Interest. | ANCAP has the right to participate (up to 20%) in each commercial field that is developed. To exercise that right ANCAP must fund its relevant percentage share of costs (including back costs). No limitation on CEG being able to farm-down its working interest.   | 
| Exploration Periods and Minimum Work Obligations (“MWO”): | Three exploration phases, either:·    Option 1: 4+3+3 or·    Option 2: 4+2+3Both Option 1 and 2 have an initial 4-year exploration period. Minimum work obligation in this period is G&G studies and reprocessing of 1,000 kms of legacy 2D seismic. In Option 1 if the operator elects to move into the 2^(nd) exploration period for 3 years, a single exploration well is required, but there is no relinquishment obligation. Option 2 allows for a shorter 2^(nd) exploration period of 2 years with a 50% relinquishment obligation and a requirement to undertake technical work to an agreed level, but no drilling obligation.
Both Option 1 and Option 2 thereafter require drilling of two wells if the operator elects to move into the final 3-year exploration period, with a 30% relinquishment obligation.   | No drilling obligation in initial 4-year exploration period. CEG can elect, but is not required, to enter into Phase 2 or Phase 3 exploration period. | 
| Minimum cost of MWO: | None specified. | CEG estimates the Minimum Work Obligation in Phase 1 will be approximately US$100,000 per annum.   | 
| Contract Term:  | 30 years, with right to extend to 40 years. | Development period can be declared at such time as operator wishes – thus allowing for development period of +25 years.   | 
| Fiscal Terms: | No royalties, signature bonus, or annual rentals. Licence regime is based on CEG as operator undertaking work and recovering costs based on a Cost Oil model, and thereafter a sharing of income between CEG and ANCAP based on a standard industry “R factor” model (a revenue/cost ratio model). CEG net profit is then taxed at normal Uruguay corporate income tax rate (25%).  | An attractive, internationally comparable fiscal regime in a stable, well-regulated environment.         | 
| Other Costs: | The licence mandates annual contributions to various education and social funds and initiatives, of approximately US$50,000 per annum.  | No annual licence fees. |

Share on:
