# Caledonia Mining Q&A: A great year with £100 million turnover & a 60% accumulative dividend increase (LON:CMCL)

- Link: https://www.directorstalkinterviews.com/caledonia-mining-qa-a-great-year-with-100-million-turnover-a-60-accumulative-dividend-increase-loncmcl/412971048
- Published: 2021-03-25T08:51:36+00:00
- Author: Amilia Stone

**Caledonia Mining Corporation plc **([LON:CMCL](https://www.directorstalkinterviews.com/company/caledonia-mining-corporation/cmcl.l))
Chief Executive Officer Steve Curtis caught up with DirectorsTalk for an exclusive
interview to discuss the financial highlights from their Q4 results, why 2020 was
transformational for the company, their response to COVID and what we can expect
from them over the coming months.

**Q1: Caledonia Mining ****announced quarter four results this morning, can you 
just take us through some of the financial highlights?**

**A1**: 2020’s results, in through what all of us know was very, very difficult 
operationally because of COVID, but really they tell a fantastic story.

We hit £100 million turnover which was a 32% increase on the previous year, gross
profit at £46 million was 50% up on the previous year, our adjusted earnings per
share was 41% up at 204 cents a share and through the 12 month period, we’d increased
our dividend four times and that accumulated to a 60% increase from the end of 2019.

So, all in all, yes, there was a good gold price but the mine delivered and that
resulted in some very, very, very good financial results which we’re very proud 
of.

**Q2: Operationally, why was 2020 transformational for the company?**

**A2:** Well, we had the final equipping of our central shaft project which listeners
may remember is a five-year old project and we finished equipping the shaft in the
last quarter of 2020, which is fantastic, which allows us now to go into the commissioning
stage, which is where we are right now.

We had to manage our way through the COVID pandemic and we had no outside management
able to get to the mine. We instituted a hard lockdown and it just shows the resilience
of the team that we’ve got up at Blanket who endured the lockdown, endured the pandemic,
and produced a record production result of nearly 58,000 ounces.

So, it was transformational, it also showed that the strength of the training that
we have put in, that culture has permeated into the organisation and that got us
through and we’re very, very proud of that.

Right at the end of the year, we announced two options that we that we took out 
on exploration properties and this now brings action to our words of wanting to 
move on from being single asset business to a multi-asset gold producer so these
are going to be exploration properties.

So, all in all, 2020 has taken us from a space of doing a project, to finishing 
a project, to embarking on an expansion programme so it’s been a great year for 
us.

**Q3: Now, you did mention COVID, how was the company affected by COVID and what
did you do in response to the pandemic?**

**A3**: When you think about it, it started sort of this time last year for us in
Zimbabwe, in South Africa. Through the year, effectively production was not affected,
and as I’ve already said, we actually hit a record gold production of 58,000 ounces
nearly and that’s just fantastic considering some of the restrictions that were 
placed upon us.

Our costs were a little bit higher because of the measures that we put in place 
to fight COVID and to protect our staff so we accept those increased costs happily.
Staff discipline was really tested to the limit with hard lockdowns, that was hard
for everyone while they were trying to worry about their families and continue doing
a job so that was a massive challenge.

We did do, on a positive side, we managed to make some rather significant donations
to the Chamber of Mines in Zimbabwe to assist them with their drive to help the 
nation fight with COVID so we were happy with that.

On our own doorstep, we focused on some CSR projects that were in our local area,
that needed some help, especially during this difficult time. We spent time and 
money upgrading and improving schools and some medical facilities that had either
been damaged, or that were just insufficient. The prime project there was we built
an isolation centre for one of the clinics in the local area, we built a two-ward
isolation centre with a new kitchen facility in a new ablution facility to just 
give the medical personnel in the area some resources and some structure to protect
the community and to fight this COVID pandemic.

So, we were very happy that we could decide, execute, and deliver that while the
COVID pandemic was raging on so tough year but the team came through with flying
colours.

**Q4: What can we expect from Caledonia Mining over the next few months?**

**A4**: Considering where we’ve come, you kind of think is it time to sit down and
take a break and a breather, and no, absolutely not.

Shaft commissioning will finish this quarter, just to remind people, the shaft is
1200 meters deep, four compartments, it’s going to run at two or three times the
speed of the old shaft and much greater capacity. So, once Dana and his teams are
finished doing the commissioning then he can operationalise that shaft so there’ll
be some announcements around that.

As I’ve already spoken about, the exploration properties, the Glen Hume property
is having drilling taking place on it as we speak, and we will continue to do that.
Those two programmes are sort of between 15 and 18 months long so there should be
some regular information coming out on those. Let’s remember, they are exploration,
we are confident about them but they will be what they will be and we will do a 
proper exploration job there. The Connemara North project is really in the planning
phase but Glen Hume is steaming ahead.

We’ll have Q1 results before we know where we are, Q1 has started off a little bit
quietly in January and February but I’m pleased to say that March has picked itself
up. There’s been some challenges, we’ve had absolute record rains in the area which
is something we are not used to and we’ve had some operational challenges with excessive
water.

We’re still very happy and we are still guiding that for 2021 our guidance is somewhere
between 61,000 and 67,000 ounces so that’s an uptake on the 58,000-odd ounces that
we did last year.

Obviously, we’ve got the solar project which we announced last year but that is 
now going ahead to a greater extent, detailed design is completed, the instruction
to commence has been given to the contractors, COVID restrictions have been slightly
relaxed so we are confident that that can now go full steam ahead. The site is cleared
but now we need to get down to getting some of the kit and caboodle onto the ground
and get building. It is going to take us probably 12 months from where we are now
to get that into operation but that’ll be something that you’ll hear about over 
the next few months.

Very importantly, in the next two weeks, early early April, there’ll be another 
dividend declaration and as I’ve already said, we’ve already had a cumulative 60%
increase. We’ve shown a willingness and an interest in increasing the dividends 
so I look forward to that dividend being discussed at the Board level and then announced
to the market.

So, quite a lot coming up in the next few months and certainly 2021 is not going
to be an idle year for us at all.

Share on: