# Cadence Minerals updated mineral resource estimate for Amapa Iron Ore

- Link: https://www.directorstalkinterviews.com/cadence-minerals-updated-mineral-resource-estimate-for-amapa-iron-ore/412868773
- Published: 2020-11-02T07:14:49+00:00
- Author: Giles Arbor

**[Cadence Minerals](https://www.directorstalkinterviews.com/company/cadence-minerals-plc/kdnc.l)**(
LON:KDNC; OTC: KDNCY) has announced the completion of the update of the Mineral 
Resource Estimate in respect of its investment in the Amapá Iron Ore Project Brazil.

**Highlights:**

·    **Mineral Resource of 176.7 million tonnes (“Mt”) grading 39.7% Fe in the Indicated
category, reported within an optimised pit shell and using a cut-off grade of 25%
Fe.**

·    **Mineral Resource of 8.7Mt at 36.9% in the Inferred category, reported within
an optimised pit shell and using a cut-off grade of 25% Fe.**

·    **This Mineral Resource represents a 21% increase in total mineral resources
compared to the equivalent MRE published by Anglo American 2012****.**

·    **The MRE will form the basis of the mine planning studies within the scoping
study, to support the operational plan to produce 4.4Mt of 65% Fe and 0.3 Mt of 
62% Fe per annum.**

·    **Significant potential exists to increase the resource base after the completion
of metallurgical and optimisation studies on the surficial Colluvium and Canga and
the underlying Semi Compact and Compact Itabirite material types.**

> **Cadence Minerals CEO Kiran Morzaria commented:**
> “We are delighted that, following a significant effort from all involved, Cadence
> has been able to release an updated Mineral Resource Estimate for the Amapá Project.
> This significantly builds on our confidence in the economics identified during
> our internal desk studies and on-site due diligence.  The increase in overall 
> mineral resource coupled with the historic operations and iron ore quality provides
> a robust platform on which to base our ongoing scoping study.

We now look to the future with a palpable sense of excitement, and I would once 
again like to thank all parties involved in working so hard in the adverse conditions
created by COVID to bring Amapá back to life. I look forward to reporting further
developments.”

**Further Information.**

Baker Geological Services Ltd was commissioned by Cadence to prepare a MRE and technical
report on Dev Mineração S.A the Mineral Assets Dev Mineração S.A comprising the 
Amapá Iron Ore Deposit located in Amapá State, Brazil.

The MRE will now form the basis of mine planning and open-pit optimisation studies
being carried out as part of our scoping study on the Amapá Project. Wardell Armstrong
LLP have been appointed to supervise and prepare the scoping study. As announced
previously, the operational plan envisages that the mined material will be beneficiated
into a 65% Fe Pellet Feed and 62% Spiral Concentrate at an average rate of 4.4Mt
and 0.3Mt per annum.

At the time of writing, the Mining Rights to the Project are held by Dev. Dev is
currently under a Judicial Restructuring Plan (“JRP”) which was approved by creditors
in August 2019. Under the JRP, there are certain preconditions for Cadence to gain
an equity stake in Dev. The remaining precondition outstanding is to reach a binding
agreement with the secured bank creditors. After the latter is completed, Cadence
will release its monies held in escrow and 99.9% of the equity of Dev will be transferred
to a joint venture company Pedra Branca Alliance Pty. Ltd (“PBA”) jointly owned 
by Cadence (20%) and its joint venture partner IndoSino Pty. Ltd (“IndoSino”) (80%).
Cadence’s next stage of investment will be a further investment of US$3.5 million
on the grant of all operational and environmental licenses, at which point Cadence
will own 27% of PBA. Cadence also has the first right of refusal to increase its
stake to 49% in PBA.

Prior to this MRE, the most recent MRE on the Amapá Project was completed in 2012
by Anglo American. The MRE, with an effective date of 29 October 2020, has been 
reported in accordance with the Canadian National Instrument 43-101 (“NI 43-101”)
Standards for Disclosure for Mineral projects. The estimation process followed the
Canadian Institute of Mining, Metallurgy and Petroleum (CIM) “Estimation of Mineral
Resources and Mineral Reserves Best Practice Guidelines” (CIM, 2019). BGS employee,
Mr Howard Baker takes Qualified Person (“QP”) responsibility for the MRE.

To determine the final Mineral Resource Statement, the model has been subjected 
to a pit optimisation exercise to determine the proportion of the material defined
that has a reasonable prospect of economic extraction. This was undertaken by Wardell
Armstrong International (“WAI”) with input from Cadence and BGS.

The Mineral Resource Statement generated by BGS has been restricted to the Indicated
and Inferred Friable Haematite, Friable Itabirite and Friable Altered Itabirite 
material falling within an optimised pit shell and using a metal price of 130 USD/
tonne for a 65% Fe concentrate. A cut-off grade of 25% Fe has been used for reporting
material within the pit shell, this being the operational cut-off grade employed
during mining operations.

Using the above criteria, this represents the material which BGS considers has a
reasonable prospect for eventual economic extraction potential.

The statements have been classified by Qualified Person, Howard Baker (FAusIMM(CP))
in accordance with the Guidelines of NI 43-101 and accompanying documents 43-101.
F1 and 43-101.CP. The Amapá Mineral Resource Estimate has an effective date of 29
October 2020.

The Amapá Project, at a cut-off grade of 25% Fe and reported within an optimised
pit shell contains an Indicated Mineral Resource of 176.7 Mt grading 39.7% Fe, 30.0%
SiO_(2), 6.2% Al_(2)O_(3), 1.2% Mn and 0.17% P and an Inferred Mineral Resource 
of 8.7 Mt grading 36.9% Fe, 29.4% SiO_(2), 7.4% Al_(2)O_(3), 1.63% Mn and 0.44% 
P (Table 1)

Table 1:     Gross and attributable Amapá Mineral Resource Statement reported within
an optimised pit and above a cut-off grade of 25% Fe

| Classification | Material | Tonnes | Attributable Tonnes  | Fe (%) | SiO_(2) (%) | Al_(2)O_(3) (%) | Mn (%) | P (%) | 
| Millions | (Millions) (6) |   |   |   |   |   | 
| Indicated | Friable Haematite | 0.6 | 0.12 | 58.6 | 12.2 | 1.8 | 0.3 | 0.1 | 
|   | Friable Itabirite | 59.5 | 11.9 | 42 | 33.1 | 3.4 | 0.67 | 0.09 | 
|   | Friable Altered Itabirite | 116.5 | 23.3 | 38.4 | 28.5 | 7.7 | 1.47 | 0.21 | 
| Sub-Total |   | 176.7 | 35.32 | 39.7 | 30 | 6.2 | 1.2 | 0.17 | 
| Inferred | Friable Itabirite | 1.3 | 0.26 | 40.4 | 38 | 2.7 | 0.29 | 0.05 | 
|   | Friable Altered Itabirite | 7.4 | 1.48 | 36.3 | 27.9 | 8.2 | 1.87 | 0.51 | 
| Sub-Total |   | 8.7 | 1.74 | 36.9 | 29.4 | 7.4 | 1.63 | 0.44 |

Notes:

(1) The Mineral Resource is considered to have reasonable prospects for eventual
economic extraction.

(2) Mineral Resources, which are not Mineral Reserves, have no demonstrated economic
viability.

(3) Amapá has an effective date of 29 October 2020.

(4) The Mineral Resource Estimate was constrained within lithological and grade 
based solids and within an optimised pit shell defined by the following assumptions;
metal price of 130 USD/t of 65% Fe concentrate; iron recovery of 75.4% Fe, Processing
costs of 3.67 USD/t dry feed and a mining cost of 1.61 USD/t rock.

(5) Mineral Resources have been classified according to the “CIM Standards on Mineral
Resources and Reserves: Definitions and Guidelines (November 2019)” by Howard Baker(
FAusIMM(CP)), an independent Qualified Person as defined in NI 43-101.

(6) The attributable tonnes represents the part of the Mineral Resource that will
be attributable to Cadence Minerals on the vesting of its initial 20% in the Project,
and is subject to the fulfilment of the conditions precedent in the court approved
judicial restructuring plan.

The open-pit optimisation shows a strip ratio of 1: 1.14 (ore tonnes: waste tonnes).

BGS notes that the Mineral Resource has a reasonable prospect for eventual economic
extraction but are not currently considered Mineral Reserves. Mineral Reserves are
estimates of the tonnage and grade or quality of material contained in a Mineral
Resource that can be economically mined and processed. To be considered a Mineral
Reserve, modifying factors must be applied to the MRE as part of the preparation
of a prefeasibility study or a feasibility study as outlined in the CIM Definition
Standards. The estimated amount of saleable material contained in the final product
must demonstrate a positive net present value using an appropriate discount rate
and must demonstrate that eventual extraction could be reasonably justified.

BGS are not aware of any factors (environmental, permitting, legal, title, taxation,
socio-economic, marketing, political, or other relevant factors) that have materially
affected the Mineral Resource Estimate.

The data used for the MRE update, including drill hole databases, topographic surveys
and the previous 2012 Mineral Resource Model, was provided by Dev with the work 
undertaken by BGS taking place during the global COVID-19 Pandemic and as such, 
a site visit by BGS has not taken place as part of this update. That said, Howard
Baker of BGS visited the Project in March 2015 and understands that no additional
technical studies, including exploration drilling, have taken place since this date.
At the time of the BGS site visit in 2015, the operation had been on care and maintenance
for approximately 12 months. BGS did, however, undertake a full tour of the mine
site, the core shed and discussed the Project with Dev personnel, Zamin Ferrous 
Ltd being the owners of the Project at the time of the site visit.

The Mineral Resource Statement has been limited to the Friable Hematite, Friable
Itabirite and Friable Altered Itabirite material types. Historic mineral resources
included Colluvium and Canga material within the resource statement, however, BGS
noted that during its site visit in 2015 that neither material was being processed
and all the material was being stockpiled, and as such both Colluvium and Canga 
material types have been excluded from the updated Mineral Resource Statement.  
Similarly, no test work has been undertaken on the Semi Compact and Compact Itabirites,
and it has not been demonstrated that a saleable concentrate can be generated from
these material types.

Due to the lack of a recent site visit, it has not been possible to undertake any
verification studies such as check sampling from the existing core, pit mapping 
or more detailed studies such as twin drilling and the acquisition of up to date
topographic surveys. As such, all data has been taken on face value and verified
where possible for obvious errors. All historical protocols have been accepted with
the logging, assaying, and associated quality control studies included within this
update, as per the previous 2012 Anglo American Mineral Resource Estimate. The 2012
Mineral Resource model has been reviewed by BGS as part of this study and following
observations from the site visit in 2015 by BGS, an update to the Resource Model
has been undertaken, using the data as supplied.

**Data Quality and Quantity**

Exploration at the Project commenced in January 2005 with drilling being carried
out at various stages up until completion in August 2012.

BGS was supplied with the raw drill data (collars, geology, assay, and survey data)
for the Project and generated a desurveyed drill hole file for analysis. In total,
the drill hole file generated included 1,046 drill holes for a total of 76,575 m
of drilling.

No validation or check sampling has taken place as part of this update with all 
QA/QC data restricted to that reported in the 2012 Anglo American Mineral Resource
Estimation report. However, the processes put in place appear robust and follow 
standard industry practise and BGS opines that the results provide confidence that
the data within the drill hole database is suitable for use in a MRE.

**Geological Model**

Iron mineralisation at the Amapá Project is hosted within a folded Banded Iron Formation(“
BIF”) or itabirite that has been metamorphosed to Amphibolite grade. Granitic pegmatite
intrusions crosscut the mineralisation that result in zones of hydrothermal alteration,
and tropical weathering of the BIF has resulted in an iron formation of variable
oxidation state and competency. The weathering process results in quartz being leached
away, leaving an enriched itabirite.

Through an iterative process, the lithological logging codes were used to model 
the different material type / litho-geochemical domains with the domains being assessed
through statistical checks. The statistical relationships observed, based on the
modelling of the logging codes, shows that the itabirite system is well understood
with the litho-geochemistry representing the logging applied. BGS acknowledges that
the modelled lithology results in overlapping grade boundaries, but this is common
in deposits with transitional weathering profiles.

The model was created by grouping all itabirite units to create an overall iron 
formation domain. The iron formation wireframe was then created by applying a trend
to the interpretation to consider the overall dip/strike of the Amapá system. The
iron formation wireframe was then cut by creating a pegmatite intrusive wireframe.

Various litho-geochemical zones were then created within the iron formation wireframe
using the same structural trend as that applied to the overall iron formation. The
wireframes were created as a series of intrusives that cut against one another. 
This method was adopted due to the complex interaction between the differing units
because of the weathering system.

Finally, BGS created surface colluvium and canga domains along with the host mica-
schist and amphibolite units.

**Mineral Resource Estimate**

The MRE was completed in Leapfrog Edge and Datamine Studio RM.  A composite file
was used in a geostatistical study (variography and Quantitative Kriging Neighbourhood
Analysis – “QKNA”) that enabled Ordinary Kriging (“OK”) to be used as the main interpolation
method. The results of the variography and the QKNA were utilised to determine the
most appropriate search parameters used in the grade estimate.

The interpolation used an elliptical search using orientation data from a structural
trend used to guide the estimation through areas of fluctuating dip/strike. Grades
of Fe, Al_(2)O_(3), SiO_(2), P, LOI, CaO, MgO, Mn, P, and TiO_(2) were interpolated
into the empty block model using OK and being based on the determined interpolation
parameters and the results of geostatistical study.

Post estimation processes calculated the Slope of Regression to enable an assessment
of the quality of the estimate, and a dry density was applied to the model using
the moisture content of the different lithologies.

The interpolated block model was validated through visual checks and a comparison
of the mean input composite and output model grades. BGS is confident that the interpolated
block grades are a reasonable reflection of the available sample data.

**Mineral Resource Classification**

Based on the work undertaken and the statistical validation steps carried out, BGS
is confident that the geological model created honours the understanding of the 
local scale geology and weathering / alteration controlled grade distribution as
accurately as possible given the current data available.

It has not been possible to assess the validity of the QA/QC data presented during
the 2012 MRE report. However, the processes put in place appear robust and follow
standard industry practise and BGS opines that the results provide confidence that
the data within the drillhole database are suitable for use in a MRE. It is however
strongly recommended that a detailed sample verification programme be put in place,
using existing core or pulps where possible along with a twin drilling campaign.

Density measurements have been taken on a wet basis with moisture being recorded
that BGS has used to determine a dry density. BGS acknowledges that recording wet
density is common practice in South America, although BGS does not consider this
the industry norm. BGS strongly recommends that a density test work programme be
introduced, using existing core samples or through in pit test pits.

The data used in the geostatistical analysis resulted in suitably reliable downhole
variograms for all zones that allowed the nugget variance to be fixed with robust
directional variograms being developed.

QKNA studies were undertaken using the variograms, and suitable estimation parameters
were selected through testing alternative sample support and search ellipse scenarios.
The slope of regression was calculated, giving an indication of the quality of the
estimated grade. Due to the level of sample support, the slope of regression values
recorded were considered high and indicative of a good quality grade estimate.

BGS employed numerous validation techniques and is confident that the estimated 
block grades are a reasonable reflection of the input sample data. Visual and statistical
checks showed that very little bias has been introduced.

The Project has been classified as containing Indicated and Inferred Mineral Resources
and is primarily based on the quality of the grade estimate and degree of sample
support. No Measured Mineral Resources have been assigned due to the lack of independent
QA/QC and limited and reliable dry density data.

**Resource Potential**

BGS recognises an opportunity to assess the potential of the other iron-bearing 
domains logged and modelled as part of this update. This primarily includes the 
Semi Compact and Compact Itabirites along with the Canga and Colluvium that was 
previously included in the 2012 Mineral Resource Statement but has been excluded
from this update.

It is recommended that metallurgical test work programmes on all iron-bearing material
types are undertaken to assess the upgrade potential.

Canga and Colluvium material above a 25% Fe cut-off and within the optimised pit
shell, but excluded from the Mineral Resource Statement totals 49 Mt of Colluvium
grading 38.5% Fe, 21.5% SiO_(2), 12.4% Al_(2)O_(3), 0.55% Mn and 0.16% P and 6.4
Mt of Canga grading 46.7% Fe, 10.7% SiO_(2), 11.2% Al_(2)O_(3), 0.22% Mn and 0.47%
P.

On a global basis, and not restricted to a pit shell or cut-off grade, BGS has modelled
an additional 800 Mt of Indicated and Inferred Semi Compact and Compact Itabirite
that lie predominantly below the existing Itabirite resource. This provides a significant
opportunity should future metallurgical and optimisation test work show the material
can be upgraded economically to a saleable concentrate.

Share on: