# Cadence Minerals provides PFS update for the Amapa Iron Ore Project

- Link: https://www.directorstalkinterviews.com/cadence-minerals-provides-pfs-update-for-the-amapa-iron-ore-project/4121057558
- Published: 2022-03-21T07:22:05+00:00
- Author: Giles

**[Cadence Minerals](https://www.directorstalkinterviews.com/company/cadence-minerals-plc/kdnc.l)
plc** (AQX/LON:KDNC; OTC: KDNCY) has provided an update on the ongoing Pre-Feasibility
Study at its flagship Amapa Iron Ore Project. 

Amapa is a substantial integrated mine, beneficiation plant, railway and port in
the northeast of Brazil. It was previously owned by Anglo American (70%) and Cliffs(
30%) and  at its peak produced up to 6.1 million tonnes (“Mt”) of iron ore concentrate
per year.

**Highlights**

·     Cadence have now acquired 27% of the Amapa Project, which is being fast-tracked
through development and eventually to production.

·     PFS commissioning based on producing 5.3 Mt per annum, 4.9Mt is anticipated
to be a 65% iron ore concentrate.

·     Wardell Armstrong International Ltd, a leading, globally recognised mining
consultancy, has been appointed the PFS Manager of the Amapa Project.

·     Work is on track to deliver a high-quality PFS for the Amapa Project

> **Cadence Minerals CEO, Kiran Morzaria, commented: **“The Amapa Mine has all the
> attributes of a significant iron ore deposit, and the upgraded Mineral Resource
> Estimate of 176.7m tonnes grading 39.7% Fe at the Inferred category provides the
> Cadence board with great confidence in our investment decision.”
> “As we see the world move towards decarbonisation and as manufacturers seek to
> minimise their carbon footprint, the planned production of a >65% Fe concentrate
> utlising predominantly renewable energy really does highlight the potential for
> the Amapa mine, rail and port infrastructure to deliver a lower emission iron 
> ore product to our customers.”
> “Completion of the PFS will be an important step towards unlocking the value of
> this deposit and I look forward to providing progress updates in the coming weeks.”

**Amapa Pre Feasibility Study and** **Wardell Armstrong Appointment**

The Pre Feasibility Study (“PFS”) began on the Amapa Project late last year and 
is based on producing 5.3 Mt of iron ore concentrate per annum. We expect to produce
4.9Mt of the higher quality, lower carbon footprint 65% iron ore concentrate which,
as of the date of this announcement, trades at approximately US$170 per dry tonne.

The PFS contemplates refurbishing and rehabilitating the existing port, rail and
plant with modifications being made to the beneficiation plant to achieve a larger
portion of 65% iron concentrate (4.9 Mt). In addition, an investigation is underway
into optimisation opportunities and potential cost savings in the transportation
of the iron ore concentrate, particularly in the areas of transhipment and movement
of ore from the mine to the rail loadout.

Previous studies carried out by SRK consulting based on 2015 site visits and updated
in 2019 to reflect changes in inflation and foreign exchange rates estimated the
total level of capital expenditure for the project of approximately US$168.8 million(
scoping study level accuracy). The same study estimated operating expenditure of
about US$ 24 per dry tonne delivered free onboard from Amapa’s port in Santana, 
Brazil.

All the other areas within the PFS are progressing as expected, with work underway
on all critical areas, including mining, beneficiation, infrastructure, energy, 
tailings storage facilities, logistics and sales and marketing.

Cadence is also pleased to announce that it has appointed Wardell Armstrong International
Ltd (“WAI”) as PFS manager for the Amapa Project. WAI is a leading, globally recognised
mining consultancy with a track record of conducting all levels of technical study
required on projects that have successfully been financed and developed into full
mining operations.

WAI are working closely with all our consultants to deliver the lowest cost and 
capital expenditure possible, which represent huge advantages for any mining operation,
particularly for construction and project financing.

**About the Amapa Project**

Amapa commenced operations in December 2007 with the first production of iron ore
concentrate product of 712 kt in 2008. In 2008 Anglo American (70%) and Cliffs (
30%) acquired the Amapa Project in 2008 as part of a larger package of mining assets
in Brazil.

Production steadily increased to 4.8 Mt and 6.1 Mt of iron ore concentrate product
in 2011 and 2012. During this period, Anglo American reported operating profits 
from its 70% ownership in the Amapa Project of US$ 120 million (100% US$ 171 million)
and US$ 54 million (100% US$ 77 million). Before its sale in 2012, Anglo American
valued its 70% stake in the Amapa Project at US$ 866 million (100% US$ 1.2 billion).
It impaired the asset in its 2012 Annual Accounts to US$ 462 million (100% US$ 660
million).

Cadence updated the Mineral Resource Estimate on November 2nd 2020, increasing the
MRE by 21%. The current MRE contains a Mineral Resource of 176.7 million tonnes 
grading 39.7% Fe in the Indicated category and Mineral Resource of 8.7Mt at 36.9%
in the Inferred category, both reported within an optimised pit shell and using 
a cut-off grade of 25% Fe.

**Details of Ownership and Joint Venture Agreement**

Cadence owns 27% of the Amapa Project, with our joint venture partner, Indo Sino
Pty Ltd (“Indo Sino”), owning the remaining 73%. The ownership of Amapa is via a
joint venture company, Pedra Branca Alliance Pte. Ltd. (“JV Co”), which owns 100%
of the equity of DEV Mineração S.A. (“DEV”). Should Indo Sino seek further investors
or an investment in the JV Co, Cadence has a first right of refusal to increase 
its stake to 49%. If Cadence does not exercise its right of first refusal under 
the terms, Indo Sino will have a twelve-month option to buy the shares in JV Co 
held by Cadence for 1.5 times the price paid by Cadence for such shares.

Share on: