# Cadence Minerals initial due diligence at the Litchfield Lithium Project is off to an excellent start

- Link: https://www.directorstalkinterviews.com/cadence-minerals-initial-due-diligence-at-the-litchfield-lithium-project-is-off-to-an-excellent-start/4121026795
- Published: 2021-10-07T12:58:02+01:00
- Author: Amilia Stone

**Cadence** **Minerals plc **(LON:KDNC) has announced that initial due diligence
undertaken by Castillo Copper on the Litchfield Lithium Project in Australia’s Northern
Territory has highlighted significant pegmatite outcropping along the north-west
boundary. This follows the Castillo announcement on Monday October 4^(th) 2021, 
that preliminary due diligence on the Picasso Lithium Project, near Norseman in 
Western Australia, has verified multiple lithium surface occurrences across the 
tenure that align with pegmatite outcropping.

**Highlights:**

·      Follow up site visit to the Litchfield Lithium Project in the Northern Territory
highlighted significant pegmatite outcropping along the western boundary

·      This is contiguous to Core Lithium’s Finnis Lithium Project^(1) which has
JORC compliant ore reserves (7.4Mt @ 1.3% Li_(2)O)^(1)

·      With satellite imagery^(2) verifying the geology in the Litchfield Lithium
Project (NW quadrant) is comparable to CXO’s ground, CCZ is awaiting assay results
on 657 surface samples (taken along the NW boundary) to determine the potential 
for contiguous mineralisation:

•      Encouragingly, the site-visit geological reports noted the areas sampled 
mostly comprised metamorphic rocks linked to the Burrell Creek formation – a host
rock for the regional occurrences of pegmatites.

As announced on September 29^(th) 2021 by Castillo, satellite imagery has verified
the geology along the Litchfield Lithium Project’s north-west boundary is comparable
to CXO’s ground. Cadence’s geological consultant conducted intensive surface sampling
across four target areas within the NW quadrant, taking 657 samples to determine
the potential for contiguous mineralisation. The sampled areas mostly comprised 
metamorphic rocks linked to the Burrell Creek formation – a host rock for the regional
occurrences of pegmatites. The samples are at the laboratory undergoing further 
analysis, with results expected in the coming weeks.

> **Castillo’s Managing Director Simon Paull commented: **“Initial due diligence
> at the Litchfield Lithium Project is off to an excellent start, with demonstrable
> photographic evidence of pegmatite outcropping along the western boundary. The
> Board now awaits the outcome of assay results which will determine the potential
> for contiguous mineralisation with CXO’s Finniss Lithium Project.”

**Overview**

Lithium Technologies Pty Ltd and Lithium Supplies Pty Ltd, in which Cadence owns
a 29% shareholding, each own 50% of Synergy Prospecting Pty Ltd (“Synergy”), and
have granted, as announced on 29 September 2021, Castillo a 90-day option to acquire
100% of the outstanding shares of LT and LS and by implication 100%  of Synergy.

During this 90-day period, Castillo will be conducting due diligence on all three
entities to ensure the underlying assets are in good standing and there are no material
adverse issues. Under the terms of the option agreement, Castillo can exercise its
right to acquire LT, LS and Synergy at any time during the 90-day period.

Castillo Copper Limited is an Australian-based explorer primarily focused on copper
across Australia and Zambia. The group is embarking on a strategic transformation
to morph into a mid-tier copper group underpinned by its core projects:

·      A large footprint in the in the Mt Isa copper-belt district, north-west Queensland,
which delivers significant exploration upside through having several high-grade 
targets and a sizeable untested anomaly within its boundaries in a copper-rich region.

·      Four high-quality prospective assets across Zambia’s copper-belt which is
the second largest copper producer in Africa.

·      A large tenure footprint proximal to Broken Hill’s world-class deposit that
is prospective for zinc-silver-lead-copper-gold.

·      Cangai Copper Mine in northern New South Wales, which is one of Australia’s
highest grading historic copper mines.

The primary assets of Synergy, which are wholly-owned, comprise the Litchfield Lithium
Project (EL31774) in NT and Picasso Lithium Project (E63/1888) in WA. In addition,
Synergy has an application in NT – EL31828 – known as the Alcoota Lithium Project,
which comprises ground proximal to Alice Springs. Castillo will need to undertake
further geological due diligence on this application.

LT and LS also hold applications for six lithium properties in San Luis Province,
Central Argentina. Again, Castillo will need to undertake further geological due
diligence on these applications.

Further details on these assets and all the applications and permits are contained
on our website.

**Option terms & consideration**

The terms of the 90-day option are as follows:

·      A$50,000 non-refundable deposit in cash on formally granting the option that
will go directly to Synergy for working capital purposes.

Upon exercising the option within the 90-day period, the binding consideration terms
are as follows:

·      A$1m script payment in CCZ shares will become payable to the Vendor Group
based on the 14-day WVAP calculated from the date of which the option agreement 
is announced to the ASX. Note, the Vendor Group will be subject to a 6-month voluntary
escrow period for 50% of the shares and 12-months for the 50% balance from the date
of settlement. In addition, both parties agree to sign off on a binding term sheet.

Incremental consideration terms are applicable if the following milestones are achieved:

·      A$1m script payment in CCZ’s shares to the Vendor Group based on the 14-day
WVAP if two drill-holes produce assayed intercepts greater or equal to a true width
of at least 10m @ 1.3% Li2O.Note, the two holes will be at least 100m apart, but
not greater than 200m.

·      A$1m script payment in CCZ’s shares to the Vendor Group based on the 14-day
WVAP if a JORC compliant total inferred resource of at least 7Mt @ 1.3% Li2O is 
modelled by SRK Consulting.

·      In the event of commercial mining operations commencing a 2% NSR will be 
payable to the nominees of the facilitator.

**References**

1.  CXO ASX Release – 21 September 2021 (Annual Report) & CCZ ASX Release – 29 September
2021

2.  Satellite imagery from Geological Survey of Western Australia. Available at:
[https://www.dmp.wa.gov.au/Geological-Survey/Geological-Survey-262.aspx](https://www.dmp.wa.gov.au/Geological-Survey/Geological-Survey-262.aspx)&
CCZ ASX Release – 29 September 2021

> **[Cadence Minerals](https://www.directorstalkinterviews.com/company/cadence-minerals-plc/kdnc.l)
> CEO Kiran Morzaria added: **“We are pleased to note that the initial due diligence
> conducted by Castillo both at Litchfield and Picasso bears out the initial findings
> announced by Cadence to the market on March 4^(th) 2019. We look forward to further
> developments”

Share on:
