# Bushveld Minerals Limited Confirm high-quality asset at Brits Vanadium Mineral Resource

- Link: https://www.directorstalkinterviews.com/bushveld-minerals-limited-confirm-high-quality-asset-at-brits-vanadium-mineral-resource/412785753
- Published: 2019-06-21T07:13:19+01:00
- Author: Giles Arbor

**Bushveld Minerals Limited** (LON: BMN), the AIM listed, integrated primary vanadium
producer, with ownership of high grade vanadium assets, has today provided a maiden
Mineral Resource estimate for the Brits Vanadium Project. The Brits Project is located
on Portion 3 of the farm Uitvalgrond 431 JQ, near the town of Brits in the North
West Province of South Africa and is directly along strike from the Bushveld Vametco
Alloys Mine (Bushveld-Vametco). The maiden Mineral Resource incorporates data from
the 2018 drilling campaign comprising 26 drill holes over a total of 2,967m of diamond
drilling.

The Mineral Resource is reported in accordance with the 2012 edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and
is classified into the Indicated and Inferred Categories in Table 1 below.

**Key Highlights**

· The aggregate Inferred and Indicated Mineral Resource distributed across the three
seams (the Lower, Intermediate, and Upper Seams) is reported as 66.8Mt at an average
grade of 1.58 per cent V2O5 in magnetite, at a cut-off grade of 20 per cent magnetite
in whole rock for 175,400 tonnes of contained vanadium.

· The Indicated Mineral Resource tonnages account for 67 per cent of the total combined
Mineral Resource and stand at 44.9Mt with an average grade of 1.59 per cent V2O5
in magnetite for 115,600 tonnes of contained vanadium across the three seams.

· The Lower Seam represents a major portion of the total combined Mineral Resource
tonnages at the cut-off grade of 20 per cent, with55.5 Mt at an average grade of
1.58 per cent V2O5 in magnetite for 137,000 tonnes of contained vanadium. This represents
approximately 83 per cent of the total combined tonnage of the maiden Mineral Resource.

· Within the combined Mineral Resource, the Intermediate Seam has the highest grade
of the three seams at 1.76 per cent V2O5 in magnetite though the tonnages are low
at the current cut-off grade of 20 per cent magnetite in whole rock.

· A geological trend of decreasing grade in vanadium for magnetite-rich layers from
west to east in the Bushveld Complex accounts for the lower grades on the Brits 
Project in comparison to the grades at the operating Vametco Mine.

· The Mineral Resource is reported up to a depth of 150m below surface and based
on the drilling on the western and central blocks of the farm Uitvalgrond Portion
3 which extends over a strike length of approximately 1.65km to the most eastern
fault where the last line of drilling was completed. As such there is potential 
to increase the resource on the remaining eastern unexplored portion of the farm
on a strike length of 1km.

**Fortune Mojapelo, CEO of Bushveld Minerals Limited, commented:**

> “We are pleased to be able to report solid results confirming that we have a high-
> quality asset at the Brits Project, where its average grade of 1.58% V2O5 in magnetite
> is among the highest in the world.
> “This represents an important step in the development of Brits – as we recently
> detailed our path to producing over 8,400 mtV per annum and Brits provides the
> optionality for additional ore feed for the Vametco plant and, if required, concentrate
> feed for the Vanchem plant.”

![Bushveld Resource (bmn)](https://www.directorstalkinterviews.com/wp-content/uploads/
2019/06/Bushveld-Resource-704x1024.png "Bushveld Minerals Limited Confirm high-quality
asset at Brits Vanadium Mineral Resource (bmn)")

![Bushveld Resource2 (bmn)](https://www.directorstalkinterviews.com/wp-content/uploads/
2019/06/Bushveld-Resource2-695x1024.png "Bushveld Minerals Limited Confirm high-
quality asset at Brits Vanadium Mineral Resource (bmn)")

Share on:
