**Bushveld Minerals Limited** (LON: BMN), the AIM quoted, integrated primary vanadium
producer, with ownership of high grade vanadium assets, has provided an operational
update for the three months ending 30th September 2019 (“Q3 2019”), in respect of
Bushveld Vanadium, Bushveld Energy and Lemur Holdings, as well as other corporate
activities.

**Key Highlights**

**Bushveld Vanadium**

· Today, Bushveld Minerals announced the successful completion of the Vanchem acquisition
for a total consideration of US$53.5 million, reduced from the initially agreed 
US$68 million.

· Vametco’s production for Q3 2019 was 561 mtV in the form of NitrovanTM from magnetite
concentrate, a 24 per cent decrease relative to Q2 2019 (Q2 2019: 742 mtV) due to
a planned maintenance programme, as previously announced.

· The maintenance programme was completed in 22 days, two days ahead of schedule.
No further shutdowns are planned for the current financial year.

· Subsequent to the successful implementation of the maintenance programme and in
line with the Transformational Programme, Vametco has completed the initiatives 
required to:

 * increase crusher and mill availability, and throughput rates;
 * increase kiln availability and hourly feed rate;
 * increase recoveries; and
 * improve leach plant recoveries.

· As a result of the improved operational performance and stability, Vametco achieved
record monthly production of circa 310 mtV during September, this is the first time
that this has been attained from the processing of only magnetite concentrate at
Vametco.

· Vametco’s production for the nine months ended 30 September 2019 was 1,953 mtV
a three per cent increase from the prior corresponding period (9M 2018: 1,897mtV).

· Vametco is on track to meet its production guidance of 2,800 mtV to 2,900 mtV 
for the 2019 financial year, underpinned by its improved operational performance.

· Unit production cost of US$18.90/KgV to US$19.50/KgV for the 2019 financial remains
on track.

· On 21 October 2019, the Company announced that the Department of Mineral Resources
and Energy approved its mining right application in respect of the Mokopane Vanadium
Project. The Company is currently finalising the required documentations in order
to execute the mining right.

**Bushveld Energy**

**Manufacturing – VRFB Investment Platform**

· On 1 November 2019, the Company announced its intention to establish a VRFB Investment
Platform (“VIP”) to lead investments in VRFB original equipment manufacturers (“
OEMs”) with attractive upside potential. The VIP is one of multiple avenues of partnering
with OEMs.

· The Company and its initial investment will play a catalyst role and mobilise 
additional capital from third party funders to establish an investment capital pool
to support VRFB OEM growth.

· These partnerships support Bushveld Energy’s business model, that includes electrolyte,
VRFB manufacturing and deployments.

· As part of the VIP, Bushveld announced that it had agreed to support the merger
of Avalon Battery Corporation and redT energy plc with interim funding of US$5 million
which will give Bushveld the opportunity to acquire a strategic interest in the 
merged energy storage company.

**Electrolyte Plant**

· On 3 September 2019, Bushveld Energy received environmental authorisation, following
the submission of the Environmental Impact Assessment, from the Environmental and
Social Advisory Services of the Eastern Cape of South Africa, for the development
of the Electrolyte Plant Facility in the East London Industrial Development Zone.
The approval successfully passed the 20-day appeal period.

· The tender for Engineering Procurement and Construction services for the Plant
has since been announced and is currently underway.

> **Fortune Mojapelo, CEO of Bushveld Minerals Limited, commented: **
> “At the core of our strategy to build a leading integrated vanadium platform is
> a low cost, scalable primary production base, of which Vametco is the flagship.
> Along with the newly acquired Vanchem business, these assets provide Bushveld 
> Minerals with a sound base to implement our growth strategy.
> In this context, I am delighted to report on the great work done to improve Vametco’s
> processing and production levels as a result of the initiatives that were identified
> as part of the Transformation Programme, which Vametco has now successfully implemented.
> Thanks to the recent efforts from our team on the ground, the maintenance programme
> was successfully implemented ahead of schedule. Following this work, Vametco was
> soon running at improved levels, achieving record production of more than 300 
> mtV from magnetite concentrate during the month of September. These sustainable
> operational achievements keep us on track to achieve our stated guidance for the
> year at both the cost and production levels.
> We are also excited to have secured operational control of Vanchem, with Bushveld
> now owning two of the four operating primary processing facilities globally. Alongside
> the Mokopane mining right application granted recently, the completion of the 
> Vanchem acquisition, gives us a scalable platform that will allow us to grow our
> production base towards the 8,400 mtV per annum target we have communicated.
> In addition, as announced recently, the restructuring of the purchase price for
> Vanchem and the recent bank facilities secured from Nedbank will enhance the Company’s
> financial position as it implements its growth strategy.
> Looking at our energy division, our recently revealed intention to establish a
> VRFB Investment Platform to lead investments in this space adds another important
> piece to our energy storage strategy. The platform will allow us to mobilise additional
> third party financing to support VRFB manufacturers’ efforts to scale up their
> manufacturing capacity. The proposed merger of two proven VRFB suppliers, Avalon
> and redT Energy is an exciting first investment opportunity for the platform. 
> The interim funding provided by Bushveld will help advance their merger and the
> eventual creation of a stronger VRFB company.
> The investment platform comes at an apt time, as developments in South Africa’s
> energy sector point to a large local stationary energy storage market. These include
> the recently announced Eskom 1,400 MWh battery tender and the South African Integrated
> Resource Plan (“IRP”) which include a dedicated allocation for new energy storage
> deployments of over 2,000 MW over the next 10 years. We believe that these developments
> will position South Africa as one of the largest markets for energy storage in
> the world.
> In conclusion, we have laid the key building blocks to achieve our production 
> target of 8,400mtVp.a while advancing Bushveld Energy’s competitive position within
> the energy storage market.”

**Bushveld Vanadium**

Bushveld has one of the largest, high-grade primary vanadium resource bases in the
world. The Company’s vanadium resource base currently consists of three mineral 
assets, Vametco, Brits and Mokopane. Bushveld’s processing facilities consist of
Vametco and Vanchem. The Company’s mineral resources and processing facilities are
situated within the Bushveld Complex in South Africa.

**Vametco**

**Table 1: Operational highlights for Vametco (on a 100% basis)**1

| Description | Unit  | Q3 CY 19 | 9MCY19 | Q3 CY19 vs
Q2 CY19  | Q3 CY19 vsQ3 CY18 | 9MCY19vs9MCY18 | 
| Vanadium (Nitrovan^(TM) plus FeV) produced | mtV^(2) | 561 | 1,953 | -24.4% | +4.5% | +3.0% | 
| Vanadium sold | mtV^(2) | 604 | 1,719 | -0.6% | +3.4% | -13.5% | 
| Average LMB vanadium price^(3) | US$/KgV | 30.7 | 47.8 | -21.9% | -64.2% | -33.8% | 
| Underlying production costs^(4) | US$/kgV | 19.1 | 19.2 | +4.9% | -5.7% | -3.1% |

 1. Based on provisional, unaudited estimates. Bushveld’s net attributable interest
    of the above figures is approximately 74%.
 2. mtV = metric tonnes of vanadium.
 3. The vanadium price is based on the FeV mid average price for the period, published
    by Metal Bulletin. Vametco realised price is based on the prior month’s average
    price.
 4. Excludes depreciation, royalties, selling, general, & administrative expenses.

· Vametco’s planned maintenance shutdown which commenced in July 2019 was successfully
completed in 22 days, two days ahead of schedule.

· The maintenance programme was undertaken to increase kiln availability, hourly
feed rate and improve leach plant recoveries.

· Subsequent to the successful implementation of the maintenance programme, Vametco
has seen a significant improvement in operational performance and stability, achieving,
for the first time, circa 310 mtV per month production from only magnetite concentrate
in September.

· The Company’s ongoing implementation of initiatives identified in the diagnostic
review will support Vametco in achieving a steady state production run rate of 3,400
mtVp.a. during the course of 2020 and run rate of 4,200 mtVp.a during the course
of 2022.

· Successfully completed the wages and benefits negotiations with the Association
of Mineworkers and Construction Union (“AMCU”) for the three-year period from 1 
July 2019 to 30 June 2022.

· A JORC compliant Competent Persons Report (“CPR”) for the updated Mineral Reserve
and Resource Estimate for Vametco will be published along with the Q4 operational
update.

· Ferrovanadium price averaged US$30.7/kgV in Q3 2019 (Q3 2018: US$85.8/kgV).

 * October LMB mid average price of US$24/kgV.

**Other projects underway at Vametco**

· A kiln off-gas project has been initiated to comply with environmental regulatory
requirements and further increase kiln feed throughput. Commissioning is planned
to be completed during H1 2020.

**Brits**

· A JORC compliant CPR for Brits Vanadium Project’s Maiden Mineral Resource will
be published along with the Q4 operational update.

**Vanchem**

· Today, the Company announced the completion of the Vanchem acquisition for a total
consideration of US$53.5 million, reduced from the previously announced consideration
of US$68 million.

· The US$53.5 million consists of: US$30 million paid in cash; US$23 million issued
as Bushveld Minerals unsecured convertible loan notes; and a further US$0.5 million
plus an amount equal to the working capital adjustment of Vanchem in cash after 
two years.

· The revised terms enhances the Group’s cash position and ensures that the Company
is in a solid position to achieve its long-term production target of more than 8,400
mtVp.a. and to build a leading downstream vanadium-based energy storage platform.

· With full operational control of Vanchem, the Company will proceed with a detailed
assessment of the assets acquired and refine the refurbishment plans for the ramp-
up programme to more than 4,200 mtVp.a.

**Mokopane Vanadium Project**

· On 21 October 2019, the Company announced that the DMRE had granted a mining right
to Pamish, in respect of the five farms which make up the Mokopane Project: Vliegekraal
783 LR, Vogelstruisfontein 765 LR, Vriesland 781 LR, Schoonoord 786 LR and Bellevue
808 LR.

· A definitive feasibility study (“DFS”) to mine the Main Magnetite Layer and provide
a resources and reserves assessment has commenced and will be focussed on Mokopane
as the primary feedstock supplier to Vanchem. The DFS is expected to be completed
during the second half of 2020.

**Bushveld Energy**

**Manufacturing**

On 1 November 2019, the Company announced its intention to establish a VIP to lead
investments in VRFB OEMs with attractive upside potential. The VIP is one of multiple
avenues of partnering with OEMs. As part of the VIP investment, the Company announced
that it had agreed to support the merger of Avalon and redT with interim funding
of US$5 million which will give Bushveld the opportunity to acquire a strategic 
interest in the merged energy storage company.

The investment is in line with the Company’s strategy of building a leading downstream
vanadium-based energy storage platform, by:

· Increasing Bushveld’s exposure to the massive potential of the stationary energy
storage market, for the first time directly with a manufacturer of VRFB technology;

· Partnering with selective VRFB companies with attractive upside potential, including
the establishment of a VRFB Investment Platform; and

· Demonstrating upstream support from the vanadium industry for the development 
of the VRFB sector and encouraging additional investment into the combined company.

**Electrolyte Plant**

· Bushveld Energy received environmental authorisation, following the submission
of the EIA, from the Environmental and Social Advisory Services of the Eastern Cape
of South Africa, for the development of the Electrolyte Plant Facility in the ELIDZ.

· Receipt of the Environmental Authorisation allows the Company to commence construction
of the facility, designed to have an initial capacity to produce 200MWh of vanadium
electrolyte per annum (used in VRFBs) as well for easy scalability in future.

· The capital expenditure required to build the electrolyte plant is approximately
US$10 million, which will be financed with a combination of debt and equity by Bushveld
and South Africa’s Industrial Development Corporation (“IDC”). The facility is being
co-developed by Bushveld Energy and the IDC.

· Upcoming milestones include tendering for and selection of the Engineering, Procurement
and Construction (“EPC”) contract for the manufacturing plant, erection of the physical
building to house the plant by the ELIDZ and construction and commissioning of the
plant.

**Vanadium electrolyte rental model**

· On 10 June 2019, the Company announced the successful deployment of a rental contract
with Avalon and its customer, Sandbar, in the United States.

**Vametco based Solar Mini-Grid Project**

· Completed a grid connection and geotechnical studies.

· Commenced procurement for the project.

**Energy storage market updates**

The recently approved Integrated Resource Plan (“IRP”) 2019 for South Africa, includes
a dedicated allocation for Energy Storage, promising to accelerate energy storage
growth in South Africa while showcasing how storage can decrease the cost of electricity
provided.

· The IRP allocates 2088 MW of new energy storage over two tranches:

    ```wp-block-code
                * 513 MW in 2022; and

                * 1,575 MW in 2029.
    ```

· Energy storage became a lowest cost option after costs were updated to reflect
current market pricing, coupled with the “longer gas infrastructure lead time” and
the “extent of the wind and solar Photovoltaics (“PV”) option in the IRP.

· The actual upside for storage within the IRP could be quite higher, with three
sources of potentially additional storage co-located with:

    ```wp-block-preformatted
           *    Solar PV - which is expected to add a further 6800 MW in generation through 2030;

           * Wind - which is expected to add nearly a further 16000 MW in generation through 2030;

           * Embedded generation, totalling 500 MW p.a.
    ```

**Lemur**

· Preliminary findings of the coal mine optimisation study, which looked at incorporating
the underground portion earlier than previously planned, show a favourable outcome.
The DFS will progress on this basis. Lemur is in the process of inviting technical
advisors to submit proposals to conduct the DFS.

· Negotiations for the construction of the power station with Sinohydro, a subsidiary
of state-owned PowerChina, are at an advanced stage and are expected to be concluded
by the end of the year.

· In July 2019, Lemur conducted the route site survey for the transmission line 
together with potential bidders for the EPC contract for the transmission line in
Madagascar. Final EPC bid documents for the transmission line were submitted in 
September 2019. Lemur will select the preferred bidder during Q4 2019.

· The Social and Environmental Impact Assessment fieldwork is ongoing. Lemur is 
currently conducting the drilling programme for the specialist studies for the SEIA.
Submission to the Ministry of Energy is still expected in Q4 2019.

· Engagement with potential lenders for project finance is still ongoing with the
objective of achieving financial close during the second half of 2020.

· Bushveld Minerals is exploring various options for Lemur Holdings to operate as
a standalone coal and energy focused platform.

**Corporate activities**

· The Group secured R375 million (approximately US$25 million) in debt facilities
through its subsidiary, Bushveld Vametco Alloys Proprietary Limited, with Nedbank
Limited in the form of a R250 million loan and a R125 million revolving credit facility.

· The R375 million is carved out from the Group’s obligation, according to the terms
of the Vanchem transaction, to repay an amount equal to 50 per cent of any debt 
raised over US$15 million, provided no more than 50 per cent of the Loan Notes have
been repaid, redeemed or converted