**Atalaya Mining Copper S.A. **(LON:ATYM) has announced its operations update for
the second quarter of 2026.

**Proyecto Riotinto Operating Highlights**

|  |  | **Q2** | **Q1** | **Full Year** | 
|  |  | **2026^((1))** | **2025** | **2026** | **2026 Guidance** | 
| Ore mined | _M tonnes_ | 4.0 | 3.5 | 3.4 | 15.5 – 16.0 | 
| Waste mined^((2)) | _M tonnes_ | 10.3 | 12.6 | 10.2 | 38 – 44^((3)) | 
| Ore processed | _M tonnes_ | 4.1 | 4.0 | 4.1 | 15.5 – 16.0 | 
| Copper grade | _%_ | 0.39 | 0.43 | 0.30 | 0.38 – 0.41 | 
| Copper recovery | _%_ | 83.91 | 76.75 | 81.54 | 79 – 83 | 
| **Copper production** | **_tonnes_** | **13,493** | **13,175** | **9,939** | **50,000 – 54,000^((4))** |

_(1)   Figures for Q2 2026 are preliminary and final figures will be released with
Q2 2026 Financial Results._

_(2)   Represents the Cerro Colorado pit only._

_(3)   Waste guidance is 57 – 67 million tonnes when including the San Dionisio 
pit._

_(4)   Low end._

> **Alberto Lavandeira, CEO, commented:**
> _“We are pleased to have delivered a strong quarter of production, where grades
> improved compared to Q1 2026 and the mill performed well once again. Copper prices
> remain robust and we have seen only modest cost impacts from the conflicts in 
> the Middle East, therefore our cash position increased materially during the quarter._
> _Various growth-related activities across our asset portfolio continue to advance,
> most notably in relation to Touro, where the permitting process is nearing completion
> according to senior officials in Galicia._
> _We are pleased to see the continued strength in the copper market, with robust
> demand coming from the global build-out of data centre infrastructure and supply
> challenges from major operations. As a result, we enter the second half of 2026
> with strong optimism.”_

**Q2 2026 Operating Results**

_Mining_

Ore mined was 4.0 million tonnes in Q2 2026 (Q2 2025: 3.5 million tonnes), compared
with 3.4 million tonnes in Q1 2026. As previously disclosed, mining in Q1 2026 was
impacted by unusually high rainfall in late January and early February 2026.  

Waste mined was 10.3 million tonnes in Q2 2026 (Q2 2025: 12.6 million tonnes), compared
with 10.2 million tonnes in Q1 2026. In addition, waste stripping activities continued
at the San Dionisio area.

_Processing_

Ore processed was 4.1 million tonnes in Q2 2026 (Q2 2025: 4.0 million tonnes), compared
with 4.1 million tonnes in Q1 2026.

Copper grade was 0.39% in Q2 2026 (Q2 2025: 0.43%), compared with 0.30% in Q1 2026.
The grade improvement compared to Q1 2026 resulted from the mining of higher grades
and reduced processing of low-grade ore stockpiles.

Copper recovery was 83.91% in Q2 2026 (Q2 2025: 76.75%), compared with 81.54% in
Q1 2026.

_Production_

Copper production was 13,493 tonnes in Q2 2026 (Q2 2025: 13,175 tonnes), compared
with 9,939 tonnes in Q1 2026. In addition, silver contained in copper concentrate
was 0.25 million ounces in Q2 2026 (Q2 2025: 0.35 million ounces).

On-site copper concentrate inventories were 11,362 tonnes at 30 June 2026 (31 March
2026: 5,083 tonnes).

Copper contained in concentrates sold was 12,493 tonnes in Q2 2026 (Q2 2025: 14,024
tonnes), compared with 9,767 tonnes in Q1 2026.

**Select Financial Highlights**

_Realised Copper Price_

The average realised copper price (excluding QPs closed during the Period) was US
$6.14/lb in Q2 2026 (Q2 2025: US$4.27/lb), compared with US$5.87/lb in Q1 2026. 
The average spot copper price was US$6.04/lb in Q2 2026.

_Provisional Revenue Adjustments_

For Q2 2026, settlement adjustments (for QPs closed during the Period) and fair 
value adjustments (for open QPs based on copper forward curve prices as of 30 June
2026) were negative €1.7 million.

_Balance Sheet_

Consolidated cash and cash equivalents were €351.2 million as of 30 June 2026 (31
December 2025: €166.3 million).

Current and non-current borrowings were €10.9 million, resulting in a net cash position
of €340.2 million as of 30 June 2026 (31 December 2025: €122.0 million).

**Outlook for 2026**

_Production_

Atalaya continues to expect that production for FY2026 will be at the low end of
the original FY2026 guidance ranges of 50,000 – 54,000 tonnes of copper and 0.9 –
1.1 million ounces of silver contained in copper concentrate.

_Operating Costs_

The recent conflicts in the Middle East have disrupted supply chains and impacted
the prices of fossil fuels including diesel. For much of Q2 2026, a ceasefire remained
in place between the United States and Iran, and as a result, the prices of impacted
commodities began to decline. However, subsequent to the end of the Period, military
activity restarted, potentially ending the ceasefire.

So far in 2026, Atalaya has experienced only a modest impact from the input price
increases triggered by the Middle East conflicts. Atalaya continues to have fixed
price agreements in place for certain consumables, and in relation to electricity,
has benefitted from its solar plant, long-term PPA and grid power that relies on
a diversified energy mix.

In the event that the prices of diesel and explosives were to remain at recent peak
levels for the remainder of FY2026, the Company continues to see a potential increase
of US$0.15 – 0.20/lb above the Company’s previously stated FY2026 cost guidance 
ranges for Cash Costs and AISC of US$2.60 – 2.90/lb and US$3.10 – 3.40/lb copper
payable, respectively.

_Non-Sustaining Capital Investments_

Atalaya continues to expect that total non-sustaining capital investments for FY2026
will not exceed the previous guidance range of €75 – 102 million, even if certain
cost items are impacted by higher diesel and explosives costs.

**Asset Portfolio Update**

_Proyecto Riotinto_

Stripping activities at San Dionisio continued during the Period, with total waste
mined of 3.2 million tonnes in Q2 2026. San Dionisio represents a key component 
of Atalaya’s strategy to increase copper production by sourcing higher-grade material
from deposits throughout the Riotinto District to be blended with ore from Cerro
Colorado.

At San Antonio, the polymetallic deposit located immediately east of the Cerro Colorado
pit, two rigs are drilling with the objective of increasing resource confidence 
and confirming deposit limits.

Atalaya continues to advance engineering works associated with processing plant 
modifications that would allow for the simultaneous treatment of polymetallic and
copper ores at Riotinto. In conjunction, Atalaya is also studying the potential 
to produce a pyrite concentrate from its tailings streams, which could serve the
sulphuric acid market.

_E-LIX Phase I Plant_

The E-LIX plant has been processing high-zinc, low-copper bulk concentrates to produce
saleable copper concentrates and zinc precipitates, with the plant demonstrating
highly stable performance during Q2 2026. For the remainder of FY2026, the core 
focus will be to achieve sustained periods of consistent plant and cost performance,
as well as test applications on other types of concentrates.

_Riotinto District – Proyecto Masa Valverde (“PMV”)_

Infill drilling continues at the Masa Valverde deposit, where the focus remains 
on copper-rich stockwork-style zones, which are expected to be amenable for processing
at the existing Riotinto facilities. Results continue to confirm the continuity 
and expansion of the high-grade mineralisation. Preparatory surface works are ongoing
ahead of a final Board decision regarding the access ramp.

PMV has been granted the two key permits required for development – the Unified 
Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada (“AAU”))
and the exploitation permit.

_Proyecto Touro_

Atalaya’s local entity Cobre San Rafael (“CSR”) continues to receive positive feedback
on the permitting process, which is being advanced under the Galician legislation
that awarded Touro with the status of strategic industrial project (or in Spanish,
Proyecto Industrial Estratégico (“PIE”)) in 2024.

Following recent public comments by senior officials of the Galicia regional government
that the environmental impact statement (“DIA”) for Touro is well-advanced, the 
Company believes that the DIA is under preparation.

In addition, the Xunta de Galicia recently announced plans to launch a new tender
of mining rights, and senior officials have also commented about the opportunity
for Galicia to begin exploiting the many minerals found in the region that have 
been classified as critical by the EU.

While it awaits the conclusion of the permitting process, CSR continues to advance
early works including detailed engineering and procurement, documentation, limited
land purchases and exploration drilling.

_Proyecto Ossa Morena_

A drilling programme is ongoing at the Guijarro gold project, where seven holes 
were completed during Q2 2026 as part of a campaign that will total 17 holes.

_Proyecto Riotinto East_

Two holes were completed at the Cerro Negro permit, targeting a coincident gravity
and magnetic anomaly.

_Skellefte Belt and Rockliden (Sweden)_

In November 2024, Atalaya announced that it had entered into two binding agreements
with Mineral Prospektering i Sverige AB (“MPS”) pursuant to which Atalaya can earn
an initial 75% interest in two separate land packages in Sweden. The Skellefte Belt
land package (“Skellefte Belt Project”) and the Rockliden land package (“Rockliden
Project”) are located in two notable districts that host many large-scale volcanogenic
massive sulphide (“VMS”) deposits and mines owned by Boliden AB. Both regions are
underexplored and could increase Atalaya’s exposure to critical minerals in Europe.

Following the successful winter drilling campaign at both the Skellefte Belt and
Rockliden projects, laboratory assays are now complete. These results confirm the
extension of high-grade zones and underscore the strong potential of the drilled
targets, all of which remain open in several directions. Some of the most significant
new intercepts are summarised in the table below.

_Table 1: Selected_ _Rockliden Intercepts_

| Prospect | BHID | from | to | Interval | Cu | Zn | Pb | Ag | Au | 
|  | _ _ | _ _ | **_ _** | _m_ | _%_ | _%_ | _%_ | _g/t_ | _g/t _ | 
| T1 | 26RCK021 | 52.25 | 52.80 | 0.55 | 4.98 | 1.03 | 0.25 | 51.00 | 0.06 | 
|  | _ _ | 56.50 | 71.35 | 14.85 | 1.83 | 0.46 | 0.12 | 32.72 | 0.11 | 
|  | _(Incl.)_ | 64.20 | 66.50 | 2.30 | 5.90 | 0.64 | 0.09 | 101.91 | 0.16 | 
| T1 | 26RCK023 | 71.25 | 75.25 | 4.00 | 1.10 | 0.12 | 0.02 | 11.95 | 0.05 | 
|  |  | 119.40 | 143.00 | 23.60 | 0.96 | 0.32 | 0.05 | 12.01 | 0.11 | 
|  | _Incl._ | 119.40 | 128.10 | 8.70 | 2.39 | 0.42 | 0.12 | 29.87 | 0.25 | 
|  | _((Incl.))_ | 123.45 | 126.35 | 2.90 | 5.31 | 0.82 | 0.28 | 71.03 | 0.64 |

_Note: Assays by ALS Laboratory (Methods: ME-ICP61, ME-ICPORE, Au-AA26)_

_Table 2: Selected_ _Skellefte Belt Intercepts_

| Prospect | BHID | from | to | Interval | Cu | Zn | Pb | Ag | Au | 
|  | _ _ | _ _ | **_ _** | _m_ | _%_ | _%_ | _%_ | _g/t_ | _g/t _ | 
| BJE | 25BJE004 | 211.20 | 222.20 | 11.00 | 0.19 | 4.80 | 0.30 | 26.84 | 0.24 | 
|  | _Incl._ | 214.00 | 220.40 | 6.40 | 0.19 | 6.67 | 0.50 | 42.57 | 0.26 | 
|  | _(Incl.)_ | 218.00 | 220.40 | 2.40 | 0.23 | 11.01 | 0.01 | 5.52 | 0.07 | 
| BJE | 25BJE001 | 230.60 | 242.60 | 12.00 | 0.21 | 3.69 | 0.06 | 10.02 | 0.21 | 
| BJK | 26SBJK025 | 301.50 | 326.55 | 25.05 | 0.08 | 2.67 | 0.01 | 2.00 | 0.20 | 
|  | _Inc._ | 301.50 | 303.95 | 2.45 | 0.05 | 23.77 | 0.00 | 3.00 | 0.05 | 
| BJK | 26SBJK029 | 193.20 | 208.70 | 15.50 | 1.05 | 0.07 | 0.00 | 6.15 | 0.39 | 
|  | _Incl._ | 193.20 | 196.35 | 3.15 | 2.73 | 0.20 | 0.00 | 13.33 | 0.68 | 
| BJK | 26SBJK032 | 309.35 | 333.45 | 24.10 | 0.62 | 3.29 | 1.15 | 14.37 | 0.11 | 
|  | _Inc._ | 309.35 | 318.95 | 9.60 | 0.68 | 8.10 | 0.38 | 24.33 | 0.05 | 
|  | _(Incl.)_ | 309.35 | 312.30 | 2.95 | 1.56 | 17.09 | 1.17 | 62.51 | 0.05 | 
|  | _Inc._ | 332.05 | 333.45 | 1.40 | 3.17 | 0.21 | 0.00 | 33.36 | 0.39 | 
|  | _ _ | 338.95 | 342.70 | 3.75 | 0.33 | 0.02 | 0.00 | 7.80 | 0.97 | 
| KED | 26SKED005 | 200.70 | 220.50 | 19.80 | 0.12 | 2.89 | 0.13 | 9.16 | 0.21 | 
|  | _Incl._ | 202.45 | 214.50 | 12.05 | 0.12 | 4.26 | 0.17 | 10.74 | 0.22 | 
|  | _(Incl.)_ | 202.45 | 204.90 | 2.45 | 0.16 | 5.81 | 0.30 | 12.82 | 0.47 |

_Note: Assays by ALS Laboratory (Methods: ME-ICP61, ME-ICPORE, Au-AA26)_

Since the commencement of the earn-in agreements, cumulative drilling totals 43 
holes (12,617 metres) at the Skellefte Belt Project and 25 holes (4,593 metres) 
at the Rockliden Project.

Summer exploration activities are focused on modelling the newly acquired data, 
surveying new target areas using Fixed-Loop Electromagnetic (FLEM) geophysics, and
vectoring extensions of the mineralised zones with Borehole Electromagnetic (BHEM)
surveys. Concurrently, planning is underway for the next drilling campaign, which
is expected to commence in late September.

Subsequent to the end of the Period, Atalaya completed its Stage 1 funding commitments
for the Skellefte Belt Project and has thereby earned a 51% interest.

**Corporate Activities Update**

_Investment in Lara Exploration Ltd._

On 2 April 2026, Atalaya announced that it had acquired 4,500,000 shares of Lara
Exploration Ltd. (TSX-V: LRA) for C$13.5 million. The shares were acquired via private
placement at a price of C$3.00 per share and represent approximately 7.3% of Lara’s
issued and outstanding shares following completion of the private placements as 
announced by Lara on 1 April 2026. Atalaya acquired the shares for investment purposes.

_2026 Annual General Meeting (“AGM”)_

All resolutions put to the Company’s 2026 AGM were passed by the requisite majorities,
including the approval of the 2025 Final Dividend of €0.065 per share, which will
be paid on 22 July 2026.

**Technical Information**

The technical information in this announcement that relates to the Rockliden and
Skellefte Belt projects has been compiled by Juan Manuel Pons Pérez, senior geologist
and employee of the Company. Juan Manuel Pons Pérez has over 35 years’ experience,
is a member of good standing with the College of Geologists of Andalucía and has
sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a
Competent Person. Juan Manuel Pons Pérez consents to the inclusion in this release
of the matters based on his information in the form and context in which it appears.