# Atalaya Mining reports record Q2 and H1 2026 EBITDA

- Link: https://www.directorstalkinterviews.com/atalaya-mining-reports-record-q2-and-h1-2026-ebitda/4121260038
- Published: 2026-08-11T07:09:00+01:00
- Author: Amilia Stone

**Atalaya Mining Copper S.A. **(LON:ATYM) has announced its unaudited second quarter
and first half financial results for the period ended 30 June 2026 together with
its interim financial statements.

**Highlights**

·      Copper production of 13.5 kt in Q2 2026 and 23.4 kt in H1 2026

·      AISC of US$2.79/lb in Q2 2026 and US$2.97/lb in H1 2026, representing strong
performance despite the cost impact of the Middle East conflicts

·      EBITDA of €78.2 million in Q2 2026 and €126.2 million in H1 2026, which are
new quarterly and half year records for Atalaya

·      Strong free cash flow contributed to a growing net cash position of €318.3
million, which will support Atalaya’s investments in its copper growth projects 
in Spain

·      Continued progress with Touro permits, polymetallic circuit and at Masa Valverde

·      2026 interim dividend of €0.055 per share declared

·      FY2026 guidance is maintained for production, Cash Costs and AISC

**Q2 and H1 2026 Financial Results Summary**

| **Period ended 30 June** | **Unit** | **Q2 2026** | Q2 2025 | **H1 2026** | H1 2025 | 
| Revenues from operations | _€k_ | **147,437** | 124,082 | **264,691** | 254,750 | 
| Operating costs | _€k_ | **(69,274)** | (69,004) | **(138,503)** | (147,158) | 
| **EBITDA** | **_€k_** | **78,163** | 55,078 | **126,188** | 107,592 | 
| Profit for the period | _€k_ | **55,659** | 29,597 | **84,008** | 60,064 | 
| Basic earnings per share | _€ cents/share_ | **36.1** | 21.1 | **55.4** | 42.7 | 
| Interim dividend declared per share ^((1)) | _€/share_ | **n/a** | n/a | **0.055** | 0.044 | 
| Cash flows from operating activities | _€k_ | **78,737** | 52,238 | **108,560** | 78,277 | 
| Cash flows used in investing activities | _€k_ | **(20,476****)** | (19,374) | **(49,956****)** | (41,773) | 
| Cash flows from financing activities | _€k_ | **18,419** | 1,294 | **132,092** | 14,889 | 
| Net cash position ^((2)) | _€k_ | **318,347** | 70,078 | **318,347** | 70,078 | 
| Working capital surplus | _€k_ | **284,281** | 92,246 | **284,281** | 92,246 | 
| **Average realised copper price****(excluding QPs)** | **_US$/lb_** | **6.14** | 4.27 | **6.02** | 4.27 | 
| Copper concentrate produced | _tonnes_ | **81,155** | 77,088 | **141,465** | 157,258 | 
| Copper production | _tonnes_ | **13,493** | 13,175 | **23,432** | 27,466 | 
| **Cash** **Costs** | **_US$/lb payable_** | **2.36** | 2.21 | **2.43** | 2.23 | 
| **All-In Sustaining Costs (“AISC”)** | **_US$/lb payable_** | **2.79** | 2.81 | **2.97** | 2.78 |

_(1)   Interim dividends declared in relation to the H1 2026 and H1 2025 periods._

_(2)   Net cash = cash and cash equivalents less borrowings, but excludes lease 
liabilities._

> **Alberto Lavandeira, CEO, commented:**
> _“We are pleased to have generated the highest quarterly and half-year EBITDA 
> in Atalaya’s history, thanks to strong copper prices, solid Q2 production and 
> good cost performance. This translated into free cash flow of over €58 million
> during the quarter, which is also a record for Atalaya. Reflecting this strong
> financial performance and confidence in our business, the Board has declared a
> 2026 interim dividend of €0.055 per share._
> _We are maintaining our prior guidance for FY2026 production, cash costs and AISC,
> despite experiencing higher diesel and explosives prices following the start of
> conflicts in the Middle East._
> _With our strong net cash position, we are well-placed to fund our various growth
> projects in Spain, especially Proyecto Touro in Galicia, where we understand that
> the environmental impact statement is nearing completion._
> _We look forward to the second half of 2026, where we will continue our focus 
> on operational excellence, cost management and advancing our project pipeline.
> We would also like to thank our shareholders for their continued support as we
> continue to build long-term value for all stakeholders.”_

**Q2 and H1 2026 Operating Results Summary**

| _ _ | **Unit** | **Q2 2026** | Q2 2025 | **H1 2026** | H1 2025 | 
| Ore mined | _tonnes_ | **4,041,512** | 3,512,257 | **7,402,359** | 7,223,300 | 
| Waste mined ^((1)) | _tonnes_ | **10,314,694** | 12,648,006 | **20,494,061** | 23,959,290 | 
| Ore processed | _tonnes_ | **4,112,250** | 3,996,573 | **8,173,002** | 8,218,464 | 
| Copper grade | _%_ | **0.39** | 0.43 | **0.35** | 0.42 | 
| Copper concentrate grade | _%_ | **16.63** | 17.09 | **16.56** | 17.47 | 
| Copper recovery | _%_ | **83.91** | 76.75 | **82.89** | 78.90 | 
| Copper concentrate produced | _tonnes_ | **81,155** | 77,088 | **141,465** | 157,258 | 
| Copper production | _tonnes_ | **13,493** | 13,175 | **23,432** | 27,466 | 
| Payable copper production | _tonnes_ | **12,682** | 12,404 | **22,018** | 25,894 | 
| Cash Costs | _US$/lb payable_ | **2.36** | 2.21 | **2.43** | 2.23 | 
| All-in Sustaining Costs | _US$/lb payable_ | **2.79** | 2.81 | **2.97** | 2.78 |

_(1)   Represents the Cerro Colorado pit only._

_Mining_

Ore mined was 4.0 million tonnes in Q2 2026 (Q2 2025: 3.5 million tonnes) and 7.4
million tonnes in H1 2026 (H1 2025: 7.2 million tonnes).

Waste mined was 10.3 million tonnes in Q2 2026 (Q2 2025: 12.6 million tonnes) and
20.5 million tonnes in H1 2026 (H1 2025: 24.0 million tonnes). In addition, waste
stripping activities continued at the San Dionisio area.

_Processing_

Ore processed was 4.1 million tonnes in Q2 2026 (Q2 2025: 4.0 million tonnes) and
8.2 million tonnes in H1 2026 (H1 2025: 8.2 million tonnes). The next SAG mill liner
change is expected to take place in Q3 2026.

Copper grade was 0.39% in Q2 2026 (Q2 2025: 0.43%) and 0.35% in H1 2026 (H1 2025:
0.42%).

Copper recovery was 83.91% in Q2 2026 (Q2 2025: 76.75%) and 82.89% in H1 2026 (H1
2025: 78.90%).

_Production_

Copper production was 13,493 tonnes in Q2 2026 (Q2 2025: 13,175 tonnes) and 23,432
in H1 2026 (H1 2025: 27,466 tonnes). In addition, silver contained in copper concentrate
was 0.25 million ounces in Q2 2026 (Q2 2025: 0.35 million ounces) and 0.45 million
ounces in H1 2026 (H1 2025: 0.63 million ounces).

On-site copper concentrate inventories were 11,362 tonnes at 30 June 2026 (31 March
2026: 5,083 tonnes).

Copper contained in concentrates sold was 12,493 tonnes in Q2 2026 (Q2 2025: 14,024
tonnes) and 22,248 in H1 2026 (H1 2025: 28,711 tonnes).

_Cash Cost and AISC Breakdown_

| _US$/lb Cu payable_ | **Q2 2026** | Q2 2025 | **H1 2026** | H1 2025 | 
| Mining | **1.21** | 0.88 | **1.25** | 0.86 | 
| Processing | **0.81** | 0.77 | **0.94** | 0.79 | 
| Other site operating costs | **0.69** | 0.69 | **0.79** | 0.59 | 
| Total site operating costs | **2.72** | 2.33 | **2.98** | 2.24 | 
| By-product credits | **(0.59)** | (0.40) | **(0.66)** | (0.32) | 
| Freight, treatment charges and other offsite costs | **0.23** | 0.29 | **0.11** | 0.31 | 
| Total offsite costs | **(0.36)** | (0.12) | **(0.55)** | (0.01) | 
| **Cash** **Costs** | **2.36** | 2.21 | **2.43** | 2.23 | 
|  | ** ** |  | ** ** |  | 
| Cash Costs | **2.36** | 2.21 | **2.43** | 2.23 | 
| Corporate costs | **0.13** | 0.06 | **0.13** | 0.09 | 
| Sustaining capital (excluding tailings expansion) | **0.05** | 0.02 | **0.05** | 0.04 | 
| Capitalised stripping costs ^((1)) | **0.19** | 0.41 | **0.29** | 0.33 | 
| Other costs | **0.06** | 0.10 | **0.08** | 0.09 | 
| **AISC** | **2.79** | 2.81 | **2.97** | 2.78 |

_(1)   Represents the Cerro Colorado pit only._

_Note: Some figures may not add up due to rounding._

Cash Costs were US$2.36/lb payable copper in Q2 2026 (Q2 2025: US$2.21/lb) and US
$2.43/lb payable copper in H1 2026 (H1 2025: US$2.23/lb), which increased due to
higher mining and processing costs and a stronger EUR/USD exchange rate, but were
partly offset by higher by-product credits and lower treatment charges.

AISC were US$2.79/lb payable copper in Q2 2026 (Q2 2025: US$2.81/lb) and US$2.97/
lb payable copper in H1 2026 (H1 2025: US$2.78/lb), which were impacted by the same
factors as Cash Costs but benefitted from lower capitalised stripping costs. AISC
excludes investments in the tailings dam (consistent with prior reporting) and waste
stripping at the San Dionisio area.

**Q2 and H1 2026 Financial Results Highlights**

_Income Statement_

Revenues were €147.4 million in Q2 2026 (Q2 2025: €124.1 million) and €264.7 million
in H1 2026 (H1 2025: €254.8 million), as a result of higher copper prices, higher
silver credits and lower offsite costs but partly offset by lower sales volumes.

Operating costs were €69.3 million in Q2 2026 (Q2 2025: €69.0 million) and €138.5
million in H1 2026 (H1 2025: €147.2 million).

EBITDA was €78.2 million in Q2 2026 (Q2 2025: €55.1 million) and €126.2 million 
in H1 2026 (H1 2025: €107.6 million), which represent new quarterly and half year
records for Atalaya.

Profit after tax was €55.7 million in Q2 2026 (Q2 2025: €29.6 million) or 36.1 cents
basic earnings per share (Q2 2025: 21.1 cents) and €84.0 million in H1 2026 (H1 
2025: €60.1 million) or 55.4 cents basic earnings per share (H1 2025: 42.7 cents).

_Cash Flow Statement_

Cash flows from operating activities before changes in working capital were €81.2
million in Q2 2026 (Q2 2025: €55.3 million) and €78.7 million after working capital
changes (Q2 2025: €52.2 million). For H1 2026, cash flows from operating activities
before changes in working capital were €128.5 million (H1 2025: €108.1 million) 
and €108.6 million after working capital changes (H1 2025: €78.3 million).

Cash flows used in investing activities were €20.5 million in Q2 2026 (Q2 2025: 
€19.4 million) and €50.0 million in H1 2026 (H1 2025: €41.8 million). Key investments
in Q2 2026 included €1.3 million in sustaining capex, €4.6 million in capitalised
stripping at Cerro Colorado, €8.9 million related to the San Dionisio area, €2.3
million to expand the tailings dam.

Cash flows from financing activities were positive €18.4 million in Q2 2026 (Q2 
2025: positive €1.3 million) and positive €132.1 million in H1 2026 (H1 2025: positive
€14.9 million), with Q2 2026 reflecting temporary drawdowns of the Company’s working
capital facilities and H1 2026 including proceeds from the January 2026 equity offering.

_Balance Sheet_

Consolidated cash and cash equivalents were €350.3 million as of 30 June 2026 (31
December 2025: €166.3 million).

Current and non-current borrowings were €31.9 million, resulting in a net cash position
of €318.3 million as of 30 June 2026 (31 December 2025: €122.0 million).

Inventories of concentrate valued at cost were €10.4 million at 30 June 2026 (31
December 2025: €3.8 million). The total working capital surplus was €284.3 million
at 30 June 2026 (31 December 2025: €93.8 million).

**Outlook for 2026**

_Production_

Atalaya continues to expect for FY2026 production to be at the low end of the original
guidance ranges of 50,000 – 54,000 tonnes of copper and 0.9 – 1.1 million ounces
of silver contained in copper concentrate, respectively.

_Operating Costs_

The ongoing conflicts in the Middle East continue to disrupt supply chains and impact
the prices of certain consumables, including diesel and explosives. For other consumables,
fixed price agreements have helped to insulate Atalaya from further cost pressures.

In H1 2026, overall cost performance has been favourable with Cash Costs and AISC
that were below the FY2026 guidance ranges. However, due to the ongoing risk that
conflicts in the Middle East could continue or escalate, Atalaya is maintaining 
its FY2026 cost guidance ranges for Cash Costs and AISC of US$2.60 – 2.90/lb and
US$3.10 – 3.40/lb copper payable, respectively.      

_Non-Sustaining Capital Investments_

Atalaya now expects that total non-sustaining capital investments for FY2026 will
be €52 – 80 million, down from the original guidance range of €75 – 102 million.
The revisions are mainly the result of timing, where certain expenditures are now
expected to be incurred in the next fiscal year.

_Exploration and Other Project Expenses_

Guidance for exploration and other project expenses remains at €5 – 7 million and
is mainly attributable to San Antonio, Proyecto Masa Valverde, Proyecto Touro and
the earn-in agreements in Sweden.

**2026 Interim Dividend**

Atalaya has a dividend policy that seeks to provide capital returns to its shareholders
and allows for continued investments in the Company’s portfolio of growth projects.
Dividends are payable in two half-yearly instalments.

In relation to H1 2026, the Company’s Board of Directors has elected to declare 
an interim dividend of €0.055 per ordinary share (“2026 Interim Dividend”), which
is equivalent to approximately US$0.064 or £0.047 per share. This compares to the
2025 interim dividend of €0.044 (or US$0.051 and £0.038) per share.

_2026 Interim Dividend Timetable_

| **Event** | **Date** | 
| Ex-dividend date | 10 September 2026 | 
| Record date | 11 September 2026 | 
| Estimated payment date | 30 September 2026 |

**Corporate Activities Update**

_Investment in Lara Exploration Ltd._

On 2 April 2026, Atalaya announced that it had acquired 4,500,000 shares of Lara
Exploration Ltd. (TSX-V: LRA) for C$13.5 million. The shares were acquired via private
placement at a price of C$3.00 per share and represent approximately 7.3% of Lara’s
issued and outstanding shares following completion of the private placements as 
announced by Lara on 1 April 2026. Atalaya acquired the shares for investment purposes.

_2026 Annual General Meeting (“AGM”)_

All resolutions put to the Company’s 2026 AGM were passed by the requisite majorities,
including the approval of the 2025 Final Dividend of €0.065 per share, which was
paid on 22 July 2026.

**Asset Portfolio Update**

_Proyecto Riotinto_

Stripping activities at San Dionisio continued during the Period, with total waste
mined of 3.2 million tonnes in Q2 2026. San Dionisio represents a key component 
of Atalaya’s strategy to increase copper production by sourcing higher-grade material
from deposits throughout the Riotinto District to be blended with ore from Cerro
Colorado.

At San Antonio, the polymetallic deposit located immediately east of the Cerro Colorado
pit, two rigs are drilling with the objective of increasing resource confidence 
and confirming deposit limits.

Atalaya continues to advance engineering works associated with processing plant 
modifications that would allow for the simultaneous treatment of polymetallic and
copper ores at Riotinto. In conjunction, Atalaya is also studying the potential 
to produce a pyrite concentrate from its tailings streams, which could serve the
sulphuric acid market.

_E-LIX Phase I Plant_

During Q2 2026, the E-LIX plant processed high-zinc, low-copper bulk concentrates
and produced saleable copper concentrates and zinc precipitates. Operating stability
improved at the throughput levels achieved, however, throughput remained below design
capacity and sustained operating and cost performance at scale has not yet been 
established. Accordingly, uncertainty remains regarding the recoverability of the
related assets.

_Riotinto District – Proyecto Masa Valverde (“PMV”)_

Infill drilling continues at the Masa Valverde deposit, where the focus remains 
on copper-rich stockwork-style zones, which are expected to be amenable for processing
at the existing Riotinto facilities. Results continue to confirm the continuity 
and expansion of the high-grade mineralisation. Preparatory surface works are ongoing
ahead of a final Board decision regarding the access ramp.

PMV has been granted the two key permits required for development – the Unified 
Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada (“AAU”))
and the exploitation permit.

_Proyecto Touro_

Based on recent correspondence between Atalaya (through its local entity Cobre San
Rafael (“CSR”)) and the regional administration, the Company can confirm that the
environmental impact statement (“DIA”) for Touro is well-advanced and that the DIA
is under preparation.

While it awaits the conclusion of the permitting process, CSR continues to advance
early works including detailed engineering and procurement, documentation, limited
land purchases and exploration drilling.

_Proyecto Ossa Morena_

A drilling programme is ongoing at the Guijarro gold project, where seven holes 
were completed during Q2 2026 as part of a campaign that will total 17 holes.

_Proyecto Riotinto East_

Two holes were completed at the Cerro Negro permit, targeting a coincident gravity
and magnetic anomaly.

_Skellefte Belt and Rockliden (Sweden)_

In November 2024, Atalaya announced that it had entered into two binding agreements
with Mineral Prospektering i Sverige AB (“MPS”) pursuant to which Atalaya can earn
an initial 75% interest in two separate land packages in Sweden. The Skellefte Belt
land package (“Skellefte Belt Project”) and the Rockliden land package (“Rockliden
Project”) are located in two notable districts that host many large-scale volcanogenic
massive sulphide (“VMS”) deposits and mines owned by Boliden AB. Both regions are
underexplored and could increase Atalaya’s exposure to critical minerals in Europe.

Following the successful winter drilling campaign at both the Skellefte Belt and
Rockliden projects, laboratory assays are now complete. These results confirm the
extension of high-grade zones and underscore the strong potential of the drilled
targets, all of which remain open in several directions. Some of the most significant
new intercepts are summarised in the table below.

_Table 1: Selected_ _Rockliden Intercepts_

| Prospect | BHID | from | to | Interval | Cu | Zn | Pb | Ag | Au | 
|  | _ _ | _ _ | **_ _** | _m_ | _%_ | _%_ | _%_ | _g/t_ | _g/t _ | 
| T1 | 26RCK021 | 52.25 | 52.80 | 0.55 | 4.98 | 1.03 | 0.25 | 51.00 | 0.06 | 
|  | _ _ | 56.50 | 71.35 | 14.85 | 1.83 | 0.46 | 0.12 | 32.72 | 0.11 | 
|  | _(Incl.)_ | 64.20 | 66.50 | 2.30 | 5.90 | 0.64 | 0.09 | 101.91 | 0.16 | 
| T1 | 26RCK023 | 71.25 | 75.25 | 4.00 | 1.10 | 0.12 | 0.02 | 11.95 | 0.05 | 
|  |  | 119.40 | 143.00 | 23.60 | 0.96 | 0.32 | 0.05 | 12.01 | 0.11 | 
|  | _Incl._ | 119.40 | 128.10 | 8.70 | 2.39 | 0.42 | 0.12 | 29.87 | 0.25 | 
|  | _((Incl.))_ | 123.45 | 126.35 | 2.90 | 5.31 | 0.82 | 0.28 | 71.03 | 0.64 |

_Note: Assays by ALS Laboratory (Methods: ME-ICP61, ME-ICPORE, Au-AA26)_

_Table 2: Selected_ _Skellefte Belt Intercepts_

| Prospect | BHID | from | to | Interval | Cu | Zn | Pb | Ag | Au | 
|  | _ _ | _ _ | **_ _** | _m_ | _%_ | _%_ | _%_ | _g/t_ | _g/t _ | 
| BJE | 25BJE004 | 211.20 | 222.20 | 11.00 | 0.19 | 4.80 | 0.30 | 26.84 | 0.24 | 
|  | _Incl._ | 214.00 | 220.40 | 6.40 | 0.19 | 6.67 | 0.50 | 42.57 | 0.26 | 
|  | _(Incl.)_ | 218.00 | 220.40 | 2.40 | 0.23 | 11.01 | 0.01 | 5.52 | 0.07 | 
| BJE | 25BJE001 | 230.60 | 242.60 | 12.00 | 0.21 | 3.69 | 0.06 | 10.02 | 0.21 | 
| BJK | 26SBJK025 | 301.50 | 326.55 | 25.05 | 0.08 | 2.67 | 0.01 | 2.00 | 0.20 | 
|  | _Inc._ | 301.50 | 303.95 | 2.45 | 0.05 | 23.77 | 0.00 | 3.00 | 0.05 | 
| BJK | 26SBJK029 | 193.20 | 208.70 | 15.50 | 1.05 | 0.07 | 0.00 | 6.15 | 0.39 | 
|  | _Incl._ | 193.20 | 196.35 | 3.15 | 2.73 | 0.20 | 0.00 | 13.33 | 0.68 | 
| BJK | 26SBJK032 | 309.35 | 333.45 | 24.10 | 0.62 | 3.29 | 1.15 | 14.37 | 0.11 | 
|  | _Inc._ | 309.35 | 318.95 | 9.60 | 0.68 | 8.10 | 0.38 | 24.33 | 0.05 | 
|  | _(Incl.)_ | 309.35 | 312.30 | 2.95 | 1.56 | 17.09 | 1.17 | 62.51 | 0.05 | 
|  | _Inc._ | 332.05 | 333.45 | 1.40 | 3.17 | 0.21 | 0.00 | 33.36 | 0.39 | 
|  | _ _ | 338.95 | 342.70 | 3.75 | 0.33 | 0.02 | 0.00 | 7.80 | 0.97 | 
| KED | 26SKED005 | 200.70 | 220.50 | 19.80 | 0.12 | 2.89 | 0.13 | 9.16 | 0.21 | 
|  | _Incl._ | 202.45 | 214.50 | 12.05 | 0.12 | 4.26 | 0.17 | 10.74 | 0.22 | 
|  | _(Incl.)_ | 202.45 | 204.90 | 2.45 | 0.16 | 5.81 | 0.30 | 12.82 | 0.47 |

_Note: Assays by ALS Laboratory (Methods: ME-ICP61, ME-ICPORE, Au-AA26)_

Since the commencement of the earn-in agreements, cumulative drilling totals 43 
holes (12,617 metres) at the Skellefte Belt Project and 25 holes (4,593 metres) 
at the Rockliden Project.

Summer exploration activities are focused on modelling the newly acquired data, 
surveying new target areas using Fixed-Loop Electromagnetic (FLEM) geophysics, and
vectoring extensions of the mineralised zones with Borehole Electromagnetic (BHEM)
surveys. Concurrently, planning is underway for the next drilling campaign, which
is expected to commence in late September.

Subsequent to the end of the Period, Atalaya completed its Stage 1 funding commitments
for the Skellefte Belt Project and has thereby earned a 51% interest.

**Technical Information**

The technical information in this announcement that relates to the Rockliden and
Skellefte Belt projects has been compiled by Juan Manuel Pons Pérez, senior geologist
and employee of the Company. Juan Manuel Pons Pérez has over 35 years’ experience,
is a member of good standing with the College of Geologists of Andalucía and has
sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a
Competent Person. Juan Manuel Pons Pérez consents to the inclusion in this release
of the matters based on his information in the form and context in which it appears.