**Atalaya Mining Copper SA** (LON:ATYM) has announced its operations update for 
the second quarter of 2025.

**Proyecto Riotinto Operating Highlights**

|  |  | **Q2** | **Q1** | **Full Year** | 
|  |  | **2025^((1))** | **2024** | **2025** | **2025 Guidance** | 
| Ore mined | _M tonnes_ | 3.5 | 3.8 | 3.7 | 15 – 16 | 
| Waste mined^((2)) | _M tonnes_ | 12.6 | 7.5 | 11.3 | 37 – 43 | 
| Ore processed | _M tonnes_ | 4.0 | 4.1 | 4.2 | 15.5 – 15.8 | 
| Copper grade | _%_ | 0.43 | 0.33 | 0.42 | 0.38 – 0.42 | 
| Copper recovery | _%_ | 76.75 | 85.81 | 80.98 | 78 – 82 | 
| **Copper production** | **_tonnes_** | **13,175** | **11,583** | **14,291** | **48,000 – 52,000** |

_(1)      Figures for Q2 2025 are preliminary and final figures will be released
with Q2 2025 Financial Results._

_(2)      Represents the Cerro Colorado pit only._

> **Alberto Lavandeira, Atalaya Mining** **CEO, commented:**
> _“We are pleased to announce another quarter of consistent performance at Riotinto,
> which provides confidence in our full year outlook._
> _With the regulatory approval of the San Dionisio area, the start of drilling 
> at San Antonio and the confirmation of high-grade copper zones at Masa Valverde,
> we continue to advance our strategy of delivering higher grades to our plant at
> Riotinto while optimising the use of our existing infrastructure._
> _The review of documents related to the environmental permit at Proyecto Touro
> continued to advance, and we remain confident that we will achieve a positive 
> outcome for this potential new source of copper in Europe._
> _With our growing cash position, we are well-placed to deliver on our organic 
> copper growth pipeline. Copper is increasingly being viewed as a strategic commodity,
> as highlighted by recent legislation in the U.S. and the competitive environment
> for copper assets.”_

**Q2 2025 Operating Results**

_Mining_

Ore mined was 3.5 million tonnes in Q2 2025 (Q2 2024: 3.8 million tonnes), compared
with 3.7 million tonnes in Q1 2025.

Waste mined was 12.6 million tonnes in Q2 2025 (Q2 2024: 7.5 million tonnes), compared
with 11.3 million tonnes in Q1 2025. In addition, waste stripping activities continued
at the San Dionisio area.

_Processing_

The plant processed ore of 4.0 million tonnes in Q2 2025 (Q2 2024: 4.1 million tonnes),
compared with 4.2 million tonnes in Q1 2025. The next SAG mill liner change will
be completed in Q3 2025.

Copper grade was 0.43% in Q2 2025 (Q2 2024: 0.33%), compared with 0.42% in Q1 2025.

Copper recovery was 76.75% in Q2 2025 (Q2 2024: 85.81%), compared with 80.98% in
Q1 2025. Recoveries in Q2 2025 were impacted by the characteristics of certain ores,
however, this material contributed much higher grades than the average plant feed
during the Period.

_Production_

Copper production was 13,175 tonnes in Q2 2025 (Q2 2024: 11,583 tonnes), compared
with 14,291 tonnes in Q1 2025, mainly as a result of higher copper grades but partly
offset by lower recoveries.

On-site copper concentrate inventories were 10,368 tonnes at 30 June 2025 (31 March
2025: 19,031 tonnes).

Copper contained in concentrates sold was 14,024 tonnes in Q2 2025 (Q2 2024: 11,397
tonnes), compared with 14,687 tonnes in Q1 2025.

**Select Financial Highlights**

_Realised Copper Price_

The average realised copper price (excluding QPs closed during the Period) was $
4.27/lb in Q2 2025 (Q2 2024: $4.54/lb), compared with $4.26/lb in Q1 2025. The average
spot copper price was $4.32/lb in Q2 2025.

_Provisional Revenue Adjustments_

For Q2 2025, settlement adjustments (for QPs closed during the Period) and fair 
value adjustments (for open QPs based on copper forward curve prices as of 30 June
2025) were positive €2.2 million.

_Balance Sheet_

The Company’s balance sheet remains strong with consolidated cash and cash equivalents
of €103.0 million as of 30 June 2025 (31 December 2024: €52.9 million).

Current and non-current borrowings were €32.9 million, resulting in a net cash position
of €70.1 million as of 30 June 2025 (31 December 2024: €35.1 million).

**Outlook for 2025**

Atalaya is pleased with Riotinto’s performance in H1 2025, which puts the Company
in a strong position to deliver on its full-year targets.

Guidance for 2025 remains unchanged, including copper production of 48,000 – 52,000
tonnes (weighted slightly towards H1 2025) and Cash Cost and AISC of $2.70 – 2.90/
lb and $3.20 – 3.40/lb copper payable, respectively.

**Asset Portfolio Update**

_Proyecto Riotinto_

On 15 May 2025, San Dionisio was granted the Unified Environmental Authorisation(
or in Spanish, Autorización Ambiental Unificada (“AAU”)) by the Junta de Andalucía(“
JdA”), which allows for the expansion of mining activities. During Q2 2025, waste
stripping activities continued at San Dionisio with total material mined of 1.0 
million tonnes, and in H2 2025, mining activities are expected to accelerate. San
Dionisio represents a key component of Atalaya’s strategy to increase copper production
by sourcing higher-grade material from deposits throughout the Riotinto District
to be blended with ore from Cerro Colorado.

With respect to the planned relocation of the A-461 road that currently runs between
Cerro Colorado and San Dionisio, the project is progressing well and major works
are expected during H2 2025.

At San Antonio, the polymetallic deposit located immediately east of the Cerro Colorado
pit, an infill and step-out drilling programme began in June.

_E-LIX Phase I Plant_

Ramp-up activities continued at the E-LIX Phase I plant. During Q2 2025, further
progress was made in relation to optimising and debottlenecking the circuits to 
increase capacity, with the novel leaching section continuing to perform well. Focus
remains on leaching the zinc contained within Atalaya’s copper concentrates due 
to the low copper treatment charge environment, thereby producing upgraded copper
concentrates and zinc precipitates. 

Once fully operational, the E-LIX plant is expected to produce high-purity copper
or zinc metals and intermediate products (such as metal precipitates) on site, allowing
the Company to potentially achieve higher metal recoveries from complex polymetallic
ores, lower transportation charges and a reduced carbon footprint.

_Riotinto District – Proyecto Masa Valverde (“PMV”)_

On 10 July 2025, the Company announced results from its ongoing drilling programme
at PMV, where two rigs are active and are focused on infill and extensional drilling
at the Masa Valverde deposit.

Notable high-grade copper zone drilling results included 25 metres at 2.93% Cu (
MJ65), 46 metres at 2.11% Cu (MJ76) and 26 metres at 2.78% Cu (MJ79), including 
10 metres at 4.39% Cu. The results are primarily associated with stockwork-style
mineralisation, which is expected to be amenable for processing at the existing 
Riotinto facilities. Recent drilling supports Atalaya’s initial focus on the Masa
Valverde copper zones, which are expected to be mined via the planned access ramp.
Development of the access ramp is expected to begin once the purchase of certain
surface rights is completed, subject to final Board approval.

PMV has been granted the two key permits required for development – the Unified 
Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada (“AAU”))
and the exploitation permit.

_Proyecto Touro_

On 24 June 2024, Atalaya announced that Proyecto Touro, via its local entity Cobre
San Rafael, was declared a strategic industrial project by the Council of the Xunta
de Galicia (“XdG”). Under legislation of the Autonomous Community of Galicia, the
status of strategic industrial project (or in Spanish, Proyecto Industrial Estratégico(“
PIE”)) acts to simplify the administrative procedures associated with the development
of industrial projects and intends to substantially reduce permitting timelines.

This declaration highlights the XdG’s commitment to promoting new investment that
will benefit the region and also support the objectives of the European Union. Copper
is considered a strategic raw material by the EU and this project has the potential
to become a new source of sustainable European copper production.

The XdG is continuing its review according to the simplified procedures afforded
to projects with PIE status. The public information period, which serves to inform
the surrounding communities and organisations about the proposed project, concluded
on 31 January 2025. Cobre San Rafael has addressed the feedback from the public 
information period, and most sectoral reports from the Xunta de Galicia have been
finalised, with only three reports still pending. The company has also responded
to requests for additional information and is awaiting the corresponding replies.
Progress on the planned power transmission line continues, with agreements already
secured with a significant number of landowners.

The Company continues to engage with the many stakeholders in the region and is 
restoring the water quality of the rivers around Touro by operating its water treatment
plant. The Company has also intensified its recruitment initiatives in relation 
to its potential future workforce.

Plant engineering is progressing, focused on cost optimisation. Additionally, the
search for contractors has started. Finally, infill and step-out drilling programmes
continue, with the objective of determining the limits of mineral orebodies both
at depth and laterally.

_Proyecto Ossa Morena_

A step-out drilling programme is underway at the flagship Alconchel-Pallares copper-
gold project.

_Proyecto Riotinto East_

Gravimetric ground surveys have been completed in order to better define future 
drill targets on the East Belt extension, and soil geochemistry works are nearing
completion at two targets.

_Skellefte Belt and Rockliden (Sweden)_

In November 2024, Atalaya announced that it had entered into two binding agreements
with Mineral Prospektering i Sverige AB (“MPS”) pursuant to which Atalaya can earn
an initial 75% interest in two separate land packages in Sweden. The Skellefte Belt
land package (“Skellefte Belt Project”) and the Rockliden land package (“Rockliden
Project”) are located in two notable districts that host many large-scale volcanogenic
massive sulphide (“VMS”) deposits and mines owned by Boliden AB. Both regions are
underexplored and could increase Atalaya’s exposure to critical minerals in Europe.

Following the winter drilling programmes, complete assays are still pending. At 
Bjurtraskgruvan, encouraging results from step-out drilling have been received, 
including:

·      25SBJK015:

‒      From 299.50m, 8.65m at 0.42% Cu, 1.49% Zn, 4.94g/t Ag, 0.12g/t Au (including
2.45m at 0.25% Cu, 4.78% Zn, 5.99g/t Ag, 0.19g/t Au)

·      25SBJK016:

‒      From 263.35m, 4.25m at 0.16% Cu, 7.93% Zn, 4.80g/t Ag, 0.23g/t Au (including
1.70m at 0.06% Cu, 18.51% Zn, 5.24g/t Ag, 0.38g/t Au)

‒      From 275.65m, 8.65m at 0.61% Cu, 2.66% Zn, 12.21g/t Ag, 0.47g/t Au (including
3.85 m at 0.67% Cu, 4.25% Zn, 14.65g/t Ag, 0.82 g/t Au)

·      25SBJK017:

‒      From 98.20m, 4.50m at 1.84% Cu, 0.12% Zn, 14.36g/t Ag, 0.14g/t Au (including
1.20m at 5.14% Cu, 0.30% Zn, 39.6g/t Ag, 0.40g/t Au)

‒      From 163.75m, 10.65m at 2.21% Cu, 0.29% Zn, 10.89g/t Ag, 0.18g/t Au (including
2.95m at 6.35% Cu, 0.70% Zn, 31.79g/t Ag, 0.39g/t Au)

Additionally, results from a geophysical Borehole TEM (BHEM) survey in the new Bjurtraskgruvan
drill holes indicate that the “plates” are more extensive than originally thought,
potentially increasing the size of the deposit. Further testing will be completed
in the winter 2025-2026 drilling season.

An airborne electromagnetic survey (VTEM) is underway in order to provide detailed
coverage of the Mid-Skellefte Belt, with results and preliminary interpretation 
expected in late 2025.

**Corporate Activities Update**

_Indexation_

Effective from 7 May 2025, Atalaya’s shares were added to the FTSE 250 Index. This
milestone is expected to enhance the Company’s visibility to institutional investors.

_2025 Annual General Meeting (“AGM”)_

All resolutions put to the Company’s 2025 AGM were passed by the requisite majorities,
including the approval of the 2024 Final Dividend of US$0.03 (€0.0275) per share,
which will be paid on 23 July 2025.

_Board of Directors_

Following the conclusion of the Company’s 2025 AGM, Hussein Barma stepped down as
an independent non-executive director and Hennie Faul was appointed as an independent
non-executive director of the Company. As a result, several changes were made in
relation to the composition of the Board’s various committees.

**Technical Information**

The technical information in this announcement that relates to Proyecto Masa Valverde
and the Skellefte Belt Project has been compiled by Juan Manuel Pons Pérez, senior
geologist and employee of the Company. Juan Manuel Pons Pérez has over 35 years’
experience, is a member of good standing with the College of Geologists of Andalucía
and has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person. Juan Manuel Pons Pérez consents to the inclusion in this 
release of the matters based on his information in the form and context in which
it appears.

Share on: