# Arc Minerals Game-Changing Copper Assays in Zambia Signal Major Potential

- Link: https://www.directorstalkinterviews.com/arc-minerals-plc-game-changing-copper-assays-in-zambia-signal-major-potential/4121185768
- Published: 2025-02-04T08:53:51+00:00
- Author: Ethan Davis

**Arc Minerals** ([LON:ARCM](https://www.directorstalkinterviews.com/company/arc-minerals-ltd/arcm.l)),
an exploration company forging partnerships to discover and develop Tier 1 copper
deposits, has provided an update on exploration activities at its Joint Venture 
with a subsidiary of Anglo American in Zambia.

DirectorsTalk caught up with Executive Chairman Nick von Schirnding and Chief Operating
Officer Vassili Carellas to break down the significance of these findings, the potential
for a large-scale copper deposit, and what this means for the joint venture with
Anglo American. They also discuss the legal and financial stability of Arc Minerals,
upcoming exploration plans, and why Zambia remains a prime location for copper mining.

**Highlights**

·    **Diamond Drill Hole KCDD002 – 40.60m @ 0.61% Cu from 22.25m**

o  **Incl. 7.70m @ 1.72% Cu from 26.75m, or**

o  **12.75m @ 1.20% Cu from 22.25m**

·    **Mineralisation confirmed 1.5km from Cheyeza East Oxide Occurrence**

·    **Both Oxide and Sulphide Mineralisation Intersected**

·    **Six holes completed for a total of 4,016m drilled at four targets**

·    **Deepest hole drilled down to 977.40m**

·    **Sulphide Mineralisation confirmed at Nkwazhi**

**Nick von Schirnding, Executive Chairman of Arc Minerals, commented:**

_“I am delighted to report that the first assay results of the Anglo JV confirm 
additional near-surface copper mineralisation at the Cheyeza target. The newly drilled
mineralisation is similar to historic assays in terms of both grade and thickness
and is over 1.5 km away from Cheyeza._ _Work is now underway to identify further
potential drilling targets at Cheyeza to test the extents of sulphide mineralisation.”_

**Commentary**

Following an extensive geological mapping and rock chip and soil sampling program
over the Anglo JV license areas (Fig 1.), a diamond drilling campaign commenced 
in August 2024 with six drill holes completed for 4016 m. Assay results have now
been received for three of the six holes.

![Arc Minerals](https://www.directorstalkinterviews.com/wp-content/uploads/2025/
02/Figure-1.-Anglo-JV-License-Area.jpg "Arc Minerals Game-Changing Copper Assays
in Zambia Signal Major Potential (ARCM)")

Figure 1. Anglo JV License Area

Near surface mineralisation observed at a new target approximately one and a half
kilometres east of the existing oxide occurrence at Cheyeza (November 7^(th) 2024
announcement, Figure 2.) has been verified by diamond drilling. Assay data from 
hole KCDD002 includes 40.60m at 0.61% Cu from 22.25m down the hole, including 12.75m@
1.20% Cu from 22.25m and 7.70m @ 1.72% Cu from 26.75m.

The KCDD002 assay results demonstrate the potential to add to the known extents 
of the oxide occurrences at Cheyeza, where similar high grade zones have been intersected
and reported in the past. Historic hole CHDDE004 intersected 18m @ 2.35% Cu from
30.60m with a higher grade zone of 7.60m @ 4.15% Cu from 39m, and hole CHDDE060 
intersected 39m @ 1.47% Cu with a higher grade zone of 10m @ 2.25% Cu from 41m.

Importantly and unlike the previously reported oxide occurrence which is characterised
as being a remobilised copper oxide occurrence, the oxide mineralisation intersected
in hole KCDD002 may be the result of weathering of sulphide mineralisation at source,
which is supported by the presence of sulphide mineralisation below the oxide zone.

![Arc Minerals](https://www.directorstalkinterviews.com/wp-content/uploads/2025/
02/Figure-2.-Anglo-JV-Drillhole-at-Cheyeza-East-in-relation-to-the-Oxide-Occurrence.
png "Arc Minerals Game-Changing Copper Assays in Zambia Signal Major Potential (
ARCM)")

Figure 2. Anglo JV Drillhole at Cheyeza East in relation to the Oxide Occurrence

Assay results have also been received for the two holes drilled at the new target
Nkwazhi, where low grade sulphide mineralisation was confirmed in the first hole.

Details and a summary of the results received can be viewed in the Table 1. Report
in Appendix A.

**Qualified Persons**

Mr Vassilios Carellas (BSc (Hons), MAusIMM) is the Chief Operating Officer for Arc
Minerals and has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking 
to qualify as a Competent Person as defined under the JORC Code (2012). Mr Carellas
consents to the inclusion in this announcement of the technical matters based on
his information in the form and context in which it appears.

_The Directors of Arc are solely and entirely responsible for the content of this
announcement. Neither Anglo American nor any other person, accepts responsibility
for the adequacy or accuracy of this news release._

**Background on the Anglo American Joint Venture**

Arc Minerals has entered into a Joint Venture Agreement with Anglo American on its
Zambian Copper Project (ZPC) comprising a number of licenses covering circa 870km
^(2)  in the North Western Province, in the Domes region of the Zambian Copperbelt
near world-class mines such as First Quantum Minerals’ Sentinel and Kansanshi copper
mines and Barrick’s Lumwana mine.

The license areas are located approximately 900 km from Lusaka, in Mwinilunga, North
Western Province, and is well within the trending arm of the major geological structure
known as the Lufilian Arc (Copperbelt), on the western flank of the Kabompo Dome.

The Copperbelt is home to all the major copper mines in Zambia and these licenses
represent one of the last dome-related areas in Zambia yet to be explored in any
detail.

Under the agreement, Anglo American can an earn-in on the ZCP by making a number
of project expenditures and assume operator ship of the project. The details of 
the agreement are set out below:

·    Phase 1 – Anglo will pay $14.5M in staged cash payments to Unico Minerals Ltd(
67% owned by Arc) and invest up to $24m in exploration expenditures (total $38.5M)
within three years and 180 days of the signing of the Agreement (RNS 20.04.23) to
secure a 51% interest in ZCP.

·    Phase 2 – Anglo may elect to increase its interest in the ZCP to 60% by investing
a further $20M (total $58.5M) within two years of the completion of Phase 1.

·    Phase 3 – Anglo may elect to increase its interest in the ZCP to 70% by investing
a further $30M (total $88.5M) within two years of the completion of Phase 2.

Share on:
