# Alien Metals secures short-term Funding Facility for project development

- Link: https://www.directorstalkinterviews.com/alien-metals-secures-short-term-funding-facility-for-project-development/4121147554
- Published: 2024-03-15T07:07:20+00:00
- Author: Amilia Stone

Alien Metals Limited ([LON:UFO](https://www.directorstalkinterviews.com/company/alien-metals-ltd/ufo.l)),
a company focused on the exploration and development of the Hancock iron ore Project
and the Pinderi Hills project in Western Australia, has advised that it has entered
a short-term funding facility on terms outlined below and continues to progress 
project development across its diversified resource portfolio.

**Overview**

•    A funding package of up to A$2m has been made available through a convertible
loan note as detailed below.

•    The Facility will meet short-term capital requirements and contribute towards
exploration and the ongoing review of strategic funding options to maximise value
for the Company’s shareholders and stakeholders, including:

o  Considering various longer-term financing options, including continued discussions
with strategic partners regarding offtake funding, debt, and equity project funding
in connection with the Hancock Project and the Pinderi Hills PGM, silver and base
metals project; and

o  Actively exploring the potential for the sale or joint venture of non-core assets
providing further funding for the Company.

•   Appointment of Technical Director, Mr. Rob Mosig, to the Board as a Non-Executive
Director, who brings significant expertise in exploration, development, and strategic
partnering, whilst having direct experience on the Company’s PGM and base metals
project in the West Pilbara. Following Rob’s appointment, Mr. Alwyn Vorster has 
stepped down from the Board to focus on his other directorships and business commitments.
Alwyn will continue to assist Alien Metals as an advisor to the Board on the Hancock
Project development.

•     The Company has further strengthened its iron ore team with the appointment
of an iron ore expert from global mining consulting firm CSA Global (now ERM). CSA
Global has extensive iron ore exploration and development expertise, including significant
roles with Fenix Resources Ltd (ASX: FEX), which transformed from an iron ore explorer
to a producer within 18 months.

•     An Advisory Board is to be established, consisting of technical and mining
industry experts to guide the Company on the various strategic options currently
available to Alien Metals for the financing and/or development of its key assets.

•   The project and technical team will continue to focus on the Hancock Project,
progressing exploration to increase the resources and reserves as set out in the
Development Study on (AIM: 8 February 2024)[.](https://www.londonstockexchange.com/news-article/UFO/iron-ore-development-study-for-hancock-project/16323155)
The study demonstrated strong economic returns from the Hancock Project, as outlined
below.

> **Guy Robertson, Alien Metals’ Executive Director, commented:**
> _“It is our objective to unlock the value of the Hancock iron ore project, where
> we have recently received positive interest from potential joint venture partners
> following the results of the Development Study._
> _“The funding announced today will provide additional capital to the Company to
> continue the exploration of our projects, while we explore and progress negotiations
> with various potential funding partners for the Hancock Project._
> _“We are delighted to welcome Rob Mosig to the Board who has over 40 years of 
> experience in mineral exploration projects, including direct experience with Alien’s
> Pilbara PGM and battery metals projects. The board thanks Alwyn Vorster for his
> contribution and ongoing support as a senior adviser, assisting the Company’s 
> strategic options in the iron ore portfolio.”_

**Funding details**

The Company is considering various proposals to progress the development of the 
Hancock Project, including funding through joint ventures, project financiers such
as offtake funding, debt, and equity funding from strategic investors and the sale
of non-core assets.

As work progresses on the various mining approvals and exploration development work
at the Hancock Project, the Company has finalised the Facility of up to A$2m with
a long-term major shareholder.

The Board is grateful for the support of all its shareholders and believes there
is a significant opportunity to unlock the value of the Company’s assets in the 
near term.

**Information on the Facility**

•     **Lender:** Bennelong Resource Capital Pty Limited, a shareholder in the Company,
with a current holding of 7.2%.

•   **Convertible Securities:** Convertible securities of up to A$2,000,000 (**Convertible
Securities),** to be drawn in three tranches: Tranche 1: A$1,000,000, Tranche 2:
A$500,000, and Tranche 3: A$500,000.

•     **Face Value and Purchase Price:** A$1 per Convertible Security.

•     **Availability Period for drawdown:** 12 months.

•   **Commitment Fee and Establishment Fee:** 3% of the maximum amount of the Facility,
being A$60,000, and A$10,000 respectively, each to be deducted from Tranche 1.

•     **Commitment Warrants:** 25,000,000 warrants to subscribe for one ordinary
share in the capital of the Company (“Ordinary Share”), each with a strike price
of a 25% premium to the 10-day VWAP prior to the date of the deed, being 0.18p, 
and an expiry date 36 months after the date of issue. These Commitment Warrants 
must be issued to the Lender within three Business Days after the condition to drawdown
of the Facility has been satisfied.

•  **Interest:** SOFR (Secured Overnight Financing Rate) (being circa 5.3% as at
the date of this announcement) plus 10% per annum, to be paid at the end of each
fiscal quarter.

•     **Repayment Date:** 12 months or a later date as agreed between the Company
and the Noteholder, unless (i) a party other than the noteholder acquires 50% or
more of the Company’s shares or (ii) an event of default occurs, in which case the
notes shall be repayable on the relevant event occurrence.

•    **Conversion Price:** the balance due under the Facility (including accrued
interest at the end of each fiscal quarter) can be converted into Ordinary Shares
at the option of the Lender at the lower of**:**

(a) 85% of the VWAP over the ten trading days prior to the date of the Facility,
converted into $A at the average of the daily £/A$ exchange rate published by the
Reserve Bank of Australia over that period; or

(b) the price per Ordinary Share offered by the Company in any equity capital raising
offered between the date of the deed and the Repayment Date, converted into A$ at
the average of the £/A$ exchange rate published by the Reserve Bank of Australia
over the five business days before settlement of that raising.

For each Ordinary Share issued to the Lender pursuant to this conversion right, 
the Lender will at the same time also be issued one Conversion Warrant (see below
for the terms applicable to each Conversion Warrant).

•     **Conversion Warrants:** means a warrant to subscribe for one Ordinary Share
expiring 36 months from the date of issue, each of which will have a strike price
equal to the lower of 125% of the VWAP over the then 10 trading days prior to:

(a)  the date of the deed, being 0.18p; and

(b)  the date on which the respective conversion notice is given to the Company,

The warrants are transferrable.

•     **Repurchase Premium:** means an amount equal to:

(a)  the principal sum outstanding paid by the Company to redeem the Notes (or any
number of them); plus

(b)  the percentage that is the same percentage by which the amount of the VWAP (
over the 10 trading days prior to the date of this deed) exceeds the issue price
of Ordinary Shares under the first equity raising of Ordinary Shares that occurs
after the date of the deed (if any) over the ten trading days prior to the announcement
of the capital raising, but not greater than 20%, and in any event (including regardless
of whether an equity raising has occurred) not less than 10%, on the principal sum
outstanding.

·    **Withdrawal fee:** 2% of the facility limit in the event of withdrawal i.e.
where the Company advises the noteholder it does not wish to avail itself of Tranche
1 and Tranche 2 of the facility, then 2% of Tranche 1 and 2, but not Tranche 3, 
unless by agreement.

·   **Drawdown structure:** Tranche 1 within five days of notice. Tranche 2 subject
to the Company announcing its Annual Report for the year ended 31 December 2023 
and Tranche 3 is conditional upon agreement between Company and the Lender of (i)
the Company’s budget for the financial year ended 31 December 2024 and (ii) a form
of security to be granted over the assets of the Company (or members of its group).

·     **Transferability**: the notes are freely transferrable.

·     **Undertakings of the Company**: the Company has given a number of customary
undertakings to the Lender in relation to the operation of its business, and the
provision of financial and management information regularly. In particular, key 
decisions will require the approval of the Lender.

It is agreed that the Lender will not convert any amounts outstanding under the 
Facility or exercise any Conversion Warrants such the conversion or exercise, respectively,
would result in the Lender together with anyone in concert with it holding more 
than 29.9% of the then enlarged share capital of the Company.

If the Lender’s shareholding exceeds 20% of the Company’s share capital as a result
of conversion of any amount outstanding under the Facility or following an exercise
of Conversion Warrants, it will negotiate in good faith entering into a relationship
agreement with the Company and the Nominated Adviser from time to time containing
customary provisions and protections as is usual for an AIM company.

The funds raised under the Facility will be used for general short-term working 
capital needs and further progressing towards the grant of a mining lease in respect
of the Hancock Project and further exploration targets recently identified as set
out in the Company’s Development Study on (AIM: 8 February 2024)[.](https://www.londonstockexchange.com/news-article/UFO/iron-ore-development-study-for-hancock-project/16323155)

**Company Update and Project Outlook**

**New Board Appointment**

The appointment of Technical Director, Rob Mosig, to the board will add significant
exploration, development, and strategic partnering expertise. Rob will be assisting
the Company’s management team in prioritising key exploration and development activities
across the Company’s portfolio.

Rob was the founding Managing Director of Helix Resources Limited from 1986 to 2006
and the Managing Director of Platina Resources Limited from 2006 to 2018. Rob was
instrumental in introducing Lonmin plc, a major platinum and palladium producer 
as a joint venture partner in the Munni Munni project in the late 1990’s.

Rob’s in-depth knowledge of Western Australia, and in particular the Munni Munni
platinum group metals and Elizabeth Hills Silver projects will be invaluable as 
the Company examines options to unlock the value of the projects.

Rob has over 40 years of experience in the mining and exploration industry after
receiving a Master of Science from Monash University and is a Fellow of AusIMM.

As a result of the Board changes, Guy Robertson will resume his position as Executive
Chairman on an interim basis, assisting the Company with funding and financing options,
along with the recruitment of additional key management personnel to progress the
Company’s projects. At the same time, Elizabeth Henson, Non-Executive Director, 
will assume the role of Senior independent Non-Executive Director.

**AIM Rules for Companies: Schedule Two Paragraph (g) Disclosures**

As required pursuant to Rule 17 and Schedule Two paragraph (g) of the AIM Rules 
for Companies, the Company confirms that Rob Mosig, aged 73, is, save for Alien 
Metals, currently a director/partner, or has been a director/partner in the past
five years, of the following companies/partnerships:

| **Current Directorships/Partnerships** | **Past Directorships/Partnerships (held in last five years)** | 
| Javelin Minerals Limited | Future Metals NL | 
| Mantle Minerals Limited | Rodinia Resources Pty Ltd | 
| Colter Investment Holdings Pty Ltd | Volcanic Metals Ltd |

There is no further information to be disclosed pursuant to Rule 17 and Schedule
Two Paragraph (g) of the AIM Rules for Companies.

**Project and Permitting Update**

The Board believes that the Company’s recent Development Study demonstrates that
the Hancock Project has the potential to become an iron ore mine in Western Australia.
The key highlights and developments of the Project, as more fully described in the
Company’s announcement on (AIM: 8 February 2024) include:

·  Execution of the Mining Agreement with the Traditional Owners, Karlka Nyiyaparli
Aboriginal Corporation, paving the way for mining approvals.

·      A significant high-grade (60%+ Fe) resource with the potential to significantly
increase the resource and reserves:

o  MRE of 8.4Mt@ 60% Fe JORC Mineral Resource, including an upgraded Indicated Resource
of 4.5Mt@ 60.2% Fe.

·      Low cost, dig, truck and ship (no beneficiation or processing required other
than crushing)

·      Based on 8Mt of the Mineral Resource being converted to mining inventory,
robust project financials of the base case produced the following:

o  An average annualised EBITDA of A$39m

o  A pre-tax NPV_(10) of A$146m and a pre-tax IRR of 133%

o  Production rate of 1.25mtpa

o  Initial development Capital Cost of A$28m

·    Ore processing will utilise a plant capable of producing 1.25Mt to 1.5Mt of
100% fines product per annum on a single shift basis. Sprint capacity of the plant
working on a double shift basis is up to 3.0Mt per annum.

·    Reduction in costs will be achieved through the proximity to the mining town
of Newman. The close vicinity allows the Company to avoid extensive construction
capital costs associated with airstrip, mining camp and associated services.

·    Provisional export capacity through the Port of Port Hedland has been secured(
MoU executed) and remains on track for final approvals during the first half of 
2024.

Alien Metals has made significant progress on the Hancock Project and is currently
in discussion with various parties regarding the required development funding. In
the interim, the technical team will focus on securing all relevant approvals required
for mining at the same time assessing strategies with the Company’s technical experts
to increase the existing resources and reserves which is expected to significantly
increase the value of the project.

Share on:
